Unfortunately this early plant experienced the problem common to many forms of renewable energy: the flow in the Wey River was unreliable, and the waterwheel was soon replaced by a steam engine.
The Federal Energy Regulatory Commission ordered the dam removed after concluding that the environmental and economic benefits of a free-flowing river outweighed the electricity generated by the dam.