The problems are:the storage of cumulating variable at poweroff, multi-byte division, the detection of rotating speed and the control of facilities by AC power.
这几个问题是:累积量的掉电存储问题、多字节除法问题、转速的检测问题和交流电设备的控制问题。
2
The speed and decent power of the Pitbull makes it an opportune tool to pick off some husks quickly.
斗犬的速度和火力使它成为迅速清除外壳的好工具。
3
Control strategy for engine running control such as starting, idling, smart power output, decrease fuel cut off, limp home and over-speed protection are designed.