Some 60 miles of the 127-mile Leeds and Liverpool Canal will be closed early next month, by which time the reservoirs which feed it are expected to have fallen to just 10 per cent of their capacity.
The bearing capacity of two super-long piles of No. 14 pier of an extra-long bridge across Jinghang Canal are detected with self-balanced loading testing method.
应用自平衡法对京杭运河某特大桥14号墩两根大直径超长桩的承载力进行检测。
3
It is revealed that the roughness factor, slope of the canal bed, cross section of the canal and sediment sizes are the important factors which influence the sediment transport capacity of the canal.