The management and team behavior varies considerably as a project tracking the risk curve (shown in Figure 7) moves through its lifecycle.
管理及团队行为随着遵从风险曲线(如图7所示)的项目在生命周期中的进行而变化。
2
The interpolation calculation and tracking control algorithm of complicated curve are difficult to implement, and require high performance control computer.
复杂曲线的插补算法和跟踪控制算法计算量大,对控制计算机的性能要求高。
3
A space curve welding seam tracking sys-tem on welding robot with rotating arc sensor is devel-oped.