Other materials are carried as collective requirements. These materials are withdrawn from stock and the costs are taken from the currentstandardcost estimate.
有些物料作为集合的需求被传送,这些物料从库存提取,成本来自当前的标准成本评估。
2
The current domestic returns to have no the united logistics costing standard, even also exists to dispute with construction to the category of the logistics cost.