In the chemical engineering production process of the continuous long cycle, once the stalling fault appears, the alarm affirmative of the first accident is the hinge of judging stalling causes.
在连续长周期的化工生产过程中,一旦出现停车故障,第一报警的确认就成为判断停车原因的关键。
2
Continuous piano-hinge shall be attached to door and stile by theft-resistant, pin-in-head Torx stainless steel machine screws into factory installed, threaded brass inserts.