The project constructiontimelimit is cut short to over six months, near 100 million Yuan fund is saved and good social and economic benefit is obtained according to this optimization design.
通过此次优化设计,缩短了工程建设工期半年多,节省了近一亿元资金,取得了良好的社会和经济效益。
2
Those who do not make the corrections within the timelimit, shall be ordered to stop construction, and can be imposed with penalty simultaneously.
逾期不改正的,责令停止施工,可以并处罚款。
3
There are, at present, three difficulties in western countrysides, such as short of funds, great difficulty in construction and long timelimit for a project.