A controlled blasting technology was applied to the construction of freezing thick gravelstratum section in the main shaft of Xulou Mine.
许楼煤矿在主井人工冻结巨厚砾岩段施工中,采用了控制爆破技术。
2
Drilling in gravelstratum is one of present difficulties in drilling area with low drilling speed, short service life of bit and high drilling cost.
卵砾石地层钻进是钻探的难题之一,不仅钻进速度低,钻头的使用寿命短,而且钻探成本高。
3
Whether the natural sand gravelstratum in the river bed would serve as the foundation of the superhigh faced rockfill dam or not was one of the key technical problems of the project.