The design and implementation of underwater explosive ramming for the second phase dock of Qingzhou Harbor in Guangxi Region, are introduced.
笔者介绍了广西钦州港二期码头抛石基床的爆夯设计和实施。
2
The siphon drainage technology of the Harbor Bank slope was simulated in the laboratory with a Fengjie freight dock, and the region of Three Gorges reservoir serving as our paradigm.