In order to reflect the true state under seism about the long-span compositetrussframe, the analysis should embody the initial influence of static loads.
为了准确反应大跨组合网架在结构地震作用下的真实状态,必须考虑初始静载影响下的网架时程分析。
2
This paper sets up the FEM model of the composite structure through ANSYS, simulates the floor, truss, shear connector by the shell, rigid frame and connector elements.
The utility model relates to a composite concrete jumbo beamcolumn frame with built-in steel truss, belonging to a jumbo frame structure system applied in the high-rise building.