Building project quality control is concerned with project owner, design unit, construction unit and prison to manage each aspect common benefits such as unit.
建筑工程项目质量控制涉及项目业主、设计单位、施工单位、监理单位等各方面共同利益。
2
The high frequency receiving module may realize a connection with the electronic controlunit only by common data lines, thereby cutting down cost largely.
而该 高频接收模块只需要通过普通数据线就可以与电子控制单元相连,成本下降非 常显著。
3
This paper mainly introduces the common principles of RISC microprocessors design and the internal structure, and the way to program the VHDL software of hardwired controlunit.