This study makes DFEM collect and master the transients calculating of pump-turbine installations, also have some foundation stone for designing and manufacturing pump-turbine units.
The master-slave arrangement applied in the design improves the trustworthiness and real-time characteristic of the system which enhances the reliability of turbine operation.