Condensate as well as the washwater for the GGH is drained through the corresponding drain system into the absorber pit.
凝结水通常为烟气换热器的冲洗水,它们被烟道疏水系统排至吸收塔排水坑。
2
At the same time provide will cut off the constant pressure water supply, long, endoscopic wash-infection machine, sterilization kettle and mature control system.
同时提供定长切断、供水恒压、内窥镜洗消机、灭菌釜等成熟的控制系统。
3
Plus, each house is highly energy efficient with ample insulation, an on-demand solar hot water heater and a catchment system that recycles rainwater to flush the toilet and wash clothes.