In the paper, the non uniformsettlement of an industrial equipment foundation is analyzed.
分析了某工业设备基础产生不均匀沉降的成因。
2
Through analysing an engineering of non-uniformsettlement in Nanhai, a reasonable and feasible reinforcing project is given for the engineering and a success is gained.
通过分析南海某工程产生不均匀沉降的原因,对其提出了合理可行的加固方案并取得了成功。
3
Non-uniformsettlement of the part of building(box culvert) crossing the levee of Dongting-lake appears in its usable life affects its operation, and even leads to rupture.