Introducing node waterage as constraint of optimal operation and EPANET 2.
引入节点水龄作为优化调度的约束条件,以EPANET 2。
2
To calculate the waterage in the urban water supply and distribution network, a simplified and junction by junction algorithm based on the definition of the waterage itself is designed.
基于水龄的定义,设计逐节点遍历简化算法计算供水管网节点水龄。
3
For example, as the great ice sheets that covered North America during the last ice age steadily melted away, huge volumes of water flowed from them.