A 330 kV cable line was laid from the Pridneprovskaya Thermal Power Plant to feed the electric station.
Pridneprovskaya热电厂将铺彻一条330千伏的电缆线为发电站提供电力。
2
In 2010, completed general contracting and delivery of general materials like cable for 6 projects such as Jingdezhen Thermal Power Plant and Zhongwei Xiangshan Wind Farm.
2010年,完成景德镇火电、中卫香山风电等6个项目电缆等通用物资总包配送工作。
3
The issue of anti-fire design and construction for cable interlayer in power plant is practically discussed. The problem in some design and solution is also presented.