Because the pipeline diameter in platform is one third of that in tidal channel, so the limit scour length is less.
而平台区由于设计管径仅为潮汐通道区的三分之一,其极限冲刷长度远小于潮汐通道区。
2
The main channel bed will scour if sediment amount from tributary debris is less than that the main stream can carry and the river evolution exhibits the characteristic of mountainous rivers.
当支沟泥石流输入主河的泥沙量小于主河的输沙量时,主河河床将下切,并逐渐恢复山区性河流的特征。
3
The depth of river channelscour is calculated by the scour rate and scour time.