In China, the slopeprotection for stone filled embankment mainly adopts rubble masonry structure, which has several disadvantages in construction quality control and natural landscape harmony etc.
The Article hereby introduces the design and construction method of rock crib that is used in slopeprotection instead of rubble masonry, and presents its application in solid engineering works.