As a result, both blocks can be regarded as candidate sites for high-level radioactive waste repository; and next research stage, e. g. boreholesurvey, is under operation.
研究结果表明,新场和芨芨槽岩块均比较完整,可作为处置库的候选岩块进入钻孔研究阶段。
2
JW-5 borehole em system is a new instrument for downhole (or underground) geophysical survey, which consists of a data acquisition unite and a data processing unit.
JW - 5地下电磁波探测系统是一种新型设备,它由数据采集系统和数据处理系统组成。
3
The surface-borehole 5-direction IP survey is one of widespread applied methods in in-hole IP surveying.