In this paper, the author introduces the construction technology of PCCP (prestressedcylinderconcrete pipe) in the course of its handling, transporting, stacking, placing and installing.
文中介绍了预应力钢筒混凝土管道的装卸、运输、堆放和辅设安装的施工工艺。
2
The research procedure of the heavy-film anti-corrosive concrete coating and its application process on the surface of prestressedconcretecylinder pipe(PCCP) are introduced.
介绍了用于混凝土表面可厚涂的防腐蚀涂料的研制过程及其在PC CP表面的施工工艺。
3
Based on the analysis and theoretical derivation, the whole process of prestressedconcretecylinder pipe (PCCP) under internal load was investigated.