Shallow buried-tunnelling method was used in the construction of high discharge pressureculvert for the first time and developed a new construction method in urban water distribution project.
在设计中将浅埋暗挖技术首次应用于大流量有压输水暗涵,进一步拓展了适用于城市输水工程的工程技术手段。
2
The result involves the earth pressure on the top of culvert, the lateral earth pressure and the displacement of the earth with the different height of backfill.
涵顶垂直土压力系数随回填土高度的变化为先增后减的趋势; 填土中最大位移点随填土高度而变等。
3
The stress state of the circular culvert pipe under soil pressure at rest is analysed with the photoelastic simulated test of the epoxy resin model frozn.