The relationship between delaytime of the boiler response, the opening time of the valve and the flow through the valve for an actual boiler is obtained.
针对电厂一台实际锅炉,得出了锅炉水位动态响应的延迟时间与伐门开启时间,以及流过伐门流量之间的关系。
2
The results show that, in the tubular pump start the process, the delaytime of opening gate and the speed of the starting gate are significant influence the transition process.
计算结果显示,在贯流泵站起动过程中,闸门开启延时时间以及闸门开启速度对起动过渡过程均有明显影响。
3
Category set to maintain opening hours: no run-time drivers, elevator arriving to open the door automatically after a certain period of time delay self-closing.