The presented computation methods are also applicable to stability analysis of catch drain, impended wall, open caisson and other excavation works during construction.
所述计算原则和方法也适用于分析截水槽、倒挂井、沉井及其他土石开挖工程在施工期的稳定性。
2
It may avoid stopping transportation and polluting city environment to have excavation in the open replaced by shallow-concealed excavation for large scale underground cable tunnel construction.
采用浅埋暗挖法施工地下电缆隧道取代明沟开挖法,可避免阻断交通、污染城市环境。
3
The Land Use and Cover Change process of the large-scale open mining area include: the land excavation, the land occupied, the land piled up.