In this project, all break-through items including complete vertical piles, floating steel mooringfacilities and new-type superstructure were adopted.
在该工程中采用了全部攻关成果,如全直桩方案,浮式钢系靠船设施和新型上部结构等。
2
The stowage and mooring of vessels and floating facilities shall be in conformity with the technical safety standards of the State.
船舶、浮动设施的配载和系固应当符合国家安全技术规范。
3
The proprietor or operator of port facilities shall provide safe means for mooring, departing and changing to another berth, all in accordance with the designed specifications of the port.