The first check should be done at or before that point, while the second should be done at regular inspection channels.
第一次检查应该在这个地方或之前完成,而第二次检查将通过常规检查渠道完成。
2
Point 3: Cease dependence on inspection to achieve quality.
要点三:不要将质量依赖于检验。
3
As mentioned previously, a WS-Inspection document is generally made available at the point-of-offering for the services that are referenced within the document.