Lateralslide of freeway roadbed and the damage of bridge abutment have been the major engineer hazard of speedway.
高路堤侧向滑动、桥台破坏已成为高速公路主要工程病害。
2
The horizontal lateral displacement of reinforced concrete or rail anti-slide piles is measured by setting up borehole incline-tube in pile.
通过在大截面钢筋混凝土和钢轨抗滑桩身埋设钻孔测斜管,监测得二类抗滑桩的水平侧向位移。
3
In the same depression, the rotation and slide of the fault, the sedimentation of source-reservoir-cap rock and gravity caused lateral sliding take place synchronously.