The techniques of measurement and data-processing theory was discussed in detail on the basis of precision traverse control network measurement of the long tunnel holing-throughsurvey.
The design and implementation of control, survey and adjustment scheme of holingthrough error in Danjiashao Tunnel construction are presented in this paper.