Taking Fen river as a case study, a management information system is set to implement pollution grosscontrol and license management.
以汾河治理为例,建立一个河流水污染物总量控制与排污许可证管理的信息系统。
2
During transition from target grosscontrol to capacity grosscontrol, the total existing pollution loading often exceeds the environmental capacity in the region.
在由目标总量控制向容量总量控制的过渡时期,现有排污量往往超过区域的环境容量。
3
The paper describe the serious of water pollution of Three Gorges reservoir area, indicating the importance of grosscontrol and the pressing of synthetic prevention.