Based on the continuing interpolation grid of the roof and floorofcoalseam, a new resolution to fault is put forward on 3d visualization deposit modeling.
基于煤层顶、底板的整体插值,实现了对三维可视化矿床模型的断层处理。
2
The hard-and-thick strata ACTS both as the floorofcoalseam No. 7 and as the roof of coal seam No. 9 in Zhangshuanglou coal Mine; and coal seam No. 9 is also hard.
Finally, we have presented some opinions for Water inrush mechanism at the floorofCoalSeam and have proposed a new method for strengthening the resistivity against dynamic load.