请输入您要查询的英文单词:

 

单词 蘖枝
释义

See also:

new shoot growing from cut branch or stump

n

branches pl
branch n
twigs pl
chandelier n

External sources (not reviewed)

有關諮詢
[...] 會將於二零一一年七月二十八日、八月二十日及三十日分別在 枝 角 政府合署、香港中 央圖書館及香港科學館舉行。
cfs.gov.hk
She also invited traders to enrol to the forthcoming three public consultation forums to be held
[...]
on 28 July 2011, 20 August 2011 and 30
[...] August 2011 at Lai Chi Kok Government [...]
Offices, Hong Kong Central Library and Hong
[...]
Kong Science Museum respectively.
cfs.gov.hk
我們在 2002 年 3 月把 108CD 號工程計劃的一部分提升為甲級,編 定為 123CD 號工程計劃,稱為「枝角雨 水轉運計劃-初步設計及勘 測」;按付款當日價格計算,估計所需費用為 3,330 萬元,用以為擬議枝角雨水轉運計劃進行工地勘測和初步設計工作。
legco.gov.hk
In March 2002, we upgraded part of 108CD to Category A as 123CD “Lai Chi Kok Transfer Scheme – preliminary design and investigations” at an estimated cost of $33.3 million [...]
in MOD prices for carrying out the site
[...]
investigation and preliminary design for the proposed LCKTS.
legco.gov.hk
虽然在维护国际和平与 安全方面两性平等问题已经越来越被看作是一个核心问题,但是妇女在和平进程 中的作用依然被普遍看作是一枝节 问 题,而没有被看作是发展可行的民主机制 和建立具有可持续性和平的一个基本问题。
un.org
While gender equality is increasingly recognized as a core issue in the maintenance of international peace and security, the role of women in peace processes generally continues to be viewed as a side issue rather than as fundamental to the development of viable democratic institutions and the establishment of sustainable peace.
un.org
促成 2009-10 年度工務計劃修訂預算增 加的主要工程項目包括:淨化海港計劃第 2A 期 (建造污水輸送系統及改善昂船洲
[...] 污水處理廠前期工程)、港島西雨水排放隧道、 枝 角 雨 水排放隧道、中環填海計 劃第 [...]
3 期、更換及修復水管工程第 2 階段,及牛潭尾濾水廠。
devb.gov.hk
Examples of major projects contributing to the increase in the revised estimate for PWP in 2009-10 include Harbour Area Treatment Scheme, stage 2A (construction of the sewage conveyance system and advance works for upgrading of Stonecutters Island
[...]
sewage treatment works); Hong Kong West
[...] drainage tunnel; Lai Chi Kok drainage tunnel; [...]
Central Reclamation phase 3; replacement
[...]
and rehabilitation of water mains, stage 2; and Ngau Tam Mei treatment works.
devb.gov.hk
在同一時間,我們亦正推行其他重要的工
[...] 程項目,以改善城市的環境質素,例如港島西、荃灣和 枝 角 的雨水排放隧道工 程計劃,以及更換和修復水管工程計劃第 [...]
3 及第 4 期工程。
devb.gov.hk
At the same time we are also implementing other important projects to improve the quality of city environment, for example the
[...]
drainage tunnel projects in Hong Kong West,
[...] Tsuen Wan and Lai Chi Kok; and the [...]
stages 3 and 4 of the watermains replacement and rehabilitation project.
devb.gov.hk
随便看

 

英汉双解词典包含2273206条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
更新时间:2025/2/14 10:02:51