请输入您要查询的英文单词:

 

单词 幢幢
释义

classifier

classifier for buildings

carriage curtain (old)

幢幢

(shadows) flickering

External sources (not reviewed)

总之,教科文组织已经不再象五年前那 样仅是“巴黎的”了。
unesdoc.unesco.org
In short, UNESCO is already far less the “building in Paris” that it was five years ago.
unesdoc.unesco.org
位於上海楼 逸兰金桥服务式公寓已於二零一零年九月全面开业,入住率正不断提升。
wingtaiproperties.com
The two-tower Lanson Place Jin Qiao Residences in Shanghai has fully opened in September 2010, and has progressively built up occupancy.
wingtaiproperties.com
这 类 僭 建 物 一 般 体 积 较 为 庞 大 , 亦 甚 少 会 在 单楼 宇 内 被 大 量 发 现 。
bd.gov.hk
Such UBWs are generally larger in size, and can rarely be found in large numbers in a single targetbuilding.
bd.gov.hk
根据董事会函件,富宏拥有的该等物业为位於香港新界葵涌和宜合道131号恒利中 心的7楼A室、12楼B室、11楼、16楼及19楼A室及B室,该等物业包括26工业 楼宇(其钢筋混凝土工程於1992年竣工)内的8个工业单位。
cre8ir.com
According to the Letter from the Board, Richmind owns the Properties at Workshop A on 7th Floor, Workshop B on 12th Floor, Workshops A and B on 11th, 16th and 19th Floors, Henry Centre, No. 131 Wo Yi Hop Road, Kwai Chung, New Territories, Hong Kong which comprise 8 industrial units within a 26-storey industrial buildingof reinforced concrete construction completed in 1992.
cre8ir.com
本集团把握物业市道畅旺,以溢价出售大厦来实现它们的资本价值,并带来额外的财务资源,以便集 [...]
团策略性地重新定位及优化其资产组合。
wingtaiproperties.com
Riding on the strong market growth, the Group disposed of
[...] two industrialbuildings to realise their [...]
capital value at a premium, providing
[...]
additional financial resources to enable the Group to strategically reposition and enhance its asset portfolio.
wingtaiproperties.com
克莱普顿拥有一共五年直到2003年,3000平方英尺的住宅位于加利福尼亚州威尼斯海滩沿岸,住宅中包括这位音乐家的音响系统以及由盖蒂博物馆艺术家Ronald Bennett专门定制设计的家具用品,自Isozaki于1987年建造以来,这些就已成为房屋的一部分。
tipschina.gov.cn
Owned by Mr. Clapton for five years until 2003, the three thousand square foot structure along the sands of Venice Beach, CA includes the musician's sound system and custom furnishings by Getty Museum artisan Ronald Bennett that have been a part of the property since Isozaki built the home in 1987.
tipschina.gov.cn
纽约城市青年旅舍(HI-New York
[...] City)是曼哈顿地区首选的住宿设施之一,位于上西区利亚风格的大厦中。
hihostels.com
Welcome to HI-New York City, Manhattan’s premier hostel located in a historic
[...] Victorian-style buildingon the Upper [...]
West Side.
hihostels.com
(ix) 武 汉 国 际集装
[...] 箱 转 运 有 限 公 司 尚 未 取 得 两 个 面 积 为 2,427 平 方 米 之三层 高 物 流 中 心 检 查 区 、为 1,980 平 方 米 之三层 综 合 楼 宇 及 一 座 面 积 为 3,570 平 方 米 之 单 层 仓 库 之 房 屋 所 [...]
有 权 证 。
cigyangtzeports.com
(ix) Wuhan International Container Transshipment
[...]
Company Limited has
[...] not obtained Building Ownership Certificate for two 3-storey Logistics Centres Inspection Area of 2,427 sq.m., a 3-storey composite building of [...]
1,980 sq.m. and a single
[...]
storey warehouse of 3,570 sq.m. It is advisable to complete the related procedures.
cigyangtzeports.com
的另一间会议室中,我们正在进行安 全理事会改革的进程,目前我们正在讨论一项全面的 [...]
一揽子提案,其中包括对《联合国宪章》的修改意见, 也是有关工作方法方面的意见。
daccess-ods.un.org
In another
[...] room ofthisbuilding,we areengaged [...]
in a process of reform of the Security Council, in which a comprehensive
[...]
package that entails amendments to the United Nations Charter, also on working methods, is being discussed.
daccess-ods.un.org
2002 年 5 月底,《荔枝角分区计划大纲草图编号
[...]
S/K16/10》刊宪,修订「住宅(甲類)」地带地积比率限
[...] 制,在《注释》内该「住宅(甲類)」地带的「备注」中 列明地积比率限制(即用建筑物的为 7.5 倍,物内住用与非住用各占部分的为 9.0 倍,或现 有建筑物的地积比率,兩者中以數目较大者为准。
devb.gov.hk
At the end of May 2002, the draft Lai Chi Kok OZP No. S/K16/10 was gazetted, in which the plot ratio restriction for “R(A)” zone was revised. The plot ratio restriction was specified in the Remarks of the Notes
[...]
for “R(A)” zone of the
[...] OZP (i.e. the plot ratio for the building shall not be in excess of 7.5 for [...]
a domestic building or
[...]
9.0 for a building that is partly domestic and partly non-domestic, or the plot ratio of the existing building, whichever is the greater.
devb.gov.hk
(a) 1997 年出版的《设计手册》,不适用於在 1997 年该手册生效之前已建成, 为數约 34000人樓宇;而 2008 年出版的《设计手册》,则不适用於 另外约 70001997 年出版的《设计手册》生效之後至 2008 年出版的《设 计手册》生效之前的期间建成的私人樓宇。
devb.gov.hk
(a) The Design Manual issued in 1997 was not applicable to
[...]
the some 34 000 private
[...] buildings constructed before the implementation of the Design Manual in 1997, and the Design Manual issued in 2008 was not applicable to another some 7 000privatebuildings constructed after [...]
the implementation of
[...]
the Design Manual in 1997 but before the implementation of the Design Manual in 2008.
devb.gov.hk
节省工程时间是国家献血中心所面临的挑战,不仅要在水力系统安装单独的平衡阀,而且需要对楼进行系统调试。
tahydronics.com
The National Blood Centre was challenged with reducing the amount of time spent, not only installing individual
[...]
hydronic balancing valves in the waterborne system, but also commissioning the system
[...] itself for thetwo new buildings.
tahydronics.com
即使是艺术博览会的Newbie,我大概猜到这个网罗了全球近300家画廊,逾2000位艺术家,占据了巴塞尔市中心Messe Basel大楼的博览会,绝不是供人轻松玩乐的消闲的活动。
think-silly.com
Although I am a ‘newbie’, I did not expect this experience to be
[...]
leisure-ly, for the fair stretching across
[...] Messe Basel buildingswascomposed [...]
of the work of over 300 galleries and 2000 artists.
think-silly.com
然 而 , 根 据 屋 宇 署 的 执
[...] 法 经 验 , 在 这116楼 宇 内 的 分 [...]
间 单 位 中,最 常 见 的 违 规 之 处 包 括 因 开 凿 违 例 门 口 而 导 致 违 反 有 关 逃 生 途 径 的 耐
[...]
火 结 构 规 定 、 因 装 设 间 隔 墙 而 阻 碍 走 火 通 道 、 因 进 行 不 合 标 准 的 渠 管 工 程 而 造 成 渗 水 , 以 及 因 过 度 装 设 间 隔 墙 及 / 或 加 厚 地 台 而 令 楼 板 负 荷 过 重 。
bd.gov.hk
Nevertheless, based on the experience of BD’s enforcement action, the
[...]
most common irregularities found in the
[...] sub-divided flatsin these 116target buildings [...]
include formation of unauthorised door
[...]
openings that contravene the fire-resisting construction requirements of the means of escape, installation of partition walls that block the fire escape routes, sub-standard drainage works that result in water seepage and excessive installation of partition walls and/or thickening of floor screeding that result in overloading of the floor screeding.
bd.gov.hk
(ix) 於二零零五年一月三十一日订立的经营租约协议,於二零零五年二月一日开始,及於二零一
[...] 零年二月一日届满,年租金为人民币600,000元,该协议乃就应於中国山东省邹平县经济开 发区魏纺路1号的而订立。
wqfz.com
(ix) Operating lease agreement dated 31 January 2005 with the commencement date and expiry date on 1 February 2005 and 1 February 2010,
[...]
respectively, was entered at an annual rental of
[...] RMB600,000 fora buildinglocatedat No. [...]
1, Weifang Road, Economic Development Zone,
[...]
Zouping County, Shandong Province, the PRC.
wqfz.com
在这次访问期间,沙迦 酋长国统治者 Sheikh Sultan Bin Mohammed Al
[...] Qasemi 殿下愿提供沙迦文化城的作 为地区教育规划中心的用房。
unesdoc.unesco.org
During this visit, His Highness Sheikh Sultan Bin
[...]
Mohammed Al Qasemi, Ruler of the Emirate of
[...] Sharjah, offered abuilding in Sharjah Cultural [...]
City to house a regional centre for educational planning.
unesdoc.unesco.org
每个工厂的所有房 间的安全门不得上锁或紧关,以便房间内的任何人员可以容易即时地从里
[...] 面开启,且所有相关门(滑门除外)应建成向外开启式,或倘门位於两个房 间之间,则门应在最接近物出口的方向,当工人於房间内进行工 [...]
作时,房门不得上锁或堵塞。
cre8ir.com
All of the factory doors affording exit from any room shall not be locked or fastened so that they can be easily and immediately opened from inside while any person is within the room, and all such doors, unless they are of the sliding type, shall be constructed to open outwards, or where the door is
[...]
between two rooms, in the direction of the nearest
[...] exit from the building and no such [...]
door shall be locked or obstructed while
[...]
work is being carried on in the room.
cre8ir.com
2009 年取得的成就包括:兴建129和公寓,修复155返回者等受冲突影响人口提供长期住房;在 17 个村庄成立社会社区中 [...]
心,力求动员当地社区,解决妨碍可持续返回的若干关键问题,包括医疗援助、 创收和教育机会等;开展惠及
[...]
2 300 个家庭的创收活动和改善民生项目;向 54 个学校和幼儿园提供柴火和其他燃料,确保其在整个冬季得以继续运行。
daccess-ods.un.org
Achievements in 2009 includethe building of 129 and rehabilitation of [...]
155 houses and apartments to provide returnees and
[...]
other members of the conflictaffected population with a durable housing solution; the establishment of social community centres in 17 villages, designed to mobilize local communities and to address some key obstacles to sustainable return by providing, inter alia, medical assistance and income and educational opportunities; the development of incomegenerating activities and improvement of livelihood projects, benefiting 2,300 households; and ensuring that 54 schools and kindergartens can remain operational throughout the winter, partly through the provision of firewood.
daccess-ods.un.org
朱美拉清真寺堪称现代穆斯林建筑的典范,以其塔及宏伟穹顶成为迪拜的标志。
shangri-la.com
A spectacular example of modern Islamic architecture, the mosque is a city landmark with its twin minarets and majestic dome.
shangri-la.com
贷款额度B以南昌红谷凯旋楼宇作为抵押,该楼宇的账面值为约人民 币1.89亿元(折合约港币2.356亿元)。
sinoharbour.com.hk
Facility B is secured by the Commercial Building Tower in Nanchang Honggu Kaixuan at book value of approximately RMB189.0 million (equivalent to approximately HK$235.6 million).
sinoharbour.com.hk
这里须考虑采暖期和制冷期的实际持续时间,以避免发生以下情况,例如物因其在制冷期的低标准而得到一个很差的综合结果,但实际上制冷期相对于采 暖期只有很短的时间,这样导致建筑物最后得到一个很低的并且事实上错误的最终 评价标准。
lowenergycertificate.com
For this the duration of the heating- or cooling period is considered to avoid that a building e.g. with a bad standard of the cooling period is evaluated negatively although the cooling period in comparison with the heating period is only minimal.
lowenergycertificate.com
科学园第三期将采用一系列的环保设计元素,除主要的14种环保科技,包括各种主动与被动式的绿色设计,值得一提的是第三期内所有大楼将符合香港建筑环保评估法升级白金级标准(HKBEAM
[...] Plus Platinum);当中最少更会以符合全球公认的环保评级系统及目前最高级认证 [...]
─ 领先能源与环境设计(LEED)的标准建造,贯彻科学园致力采纳及推广环保技术的承诺。
hkstp.org
In addition to 14 core sustainable technologies to be employed, including both active and passive design features, it is worth noting that all buildings in the development are targeted to meet the strict Hong Kong Building Environmental Assessment
[...]
Method (HKBEAM) Plus Platinum standard, and
[...] at least one building will target [...]
the Leadership in Energy and Environmental
[...]
Design (LEED) Platinum standard, which is a world recognised green rating system and presently the highest level of certification available, thus underscoring the Park’s commitment to adopting and promoting green technologies.
hkstp.org
(c) 一名反对者( 代表大厦的业主) 指称,拟议的 [...]
道路工程、新土地用途,以及部分传媒报道的香港 会议展览中心( 下称「会展」) 第 III 期扩建工程,会 令该区的交通流量大增至不可接受的程度,但湾仔 北的交通改善措施并不足够。
cwb-hyd.hk
(c) One objector, on behalf of the owners of a
[...] commercial building, alleged that [...]
the proposed road works, the new land uses
[...]
and the Phase III extension of the Hong Kong Convention and Exhibition Centre (HKCEC) reported in some press would introduce an unacceptably large volume of additional traffic but there would be inadequate traffic improvement measures in the Wan Chai North area.
cwb-hyd.hk
维持一贯做法,为剩余的居屋 / 私人参建居屋发展项目提供10年楼宇结构安全保证 (天水围的屋苑保证年期为20年),由楼宇落成日期起计;但未发售的大厦的10年楼宇结构安全保证 (天水围的屋苑保证年期为20年),则由售大厦首个推售期的首个选楼日起计。
housingauthority.gov.hk
The structural safety guarantee (SSG) of 10 years (or 20 years for projects in Tin Shui Wai) from the date of building completion will be maintained for the surplus HOS / Private Sector Participation Scheme developments, except that for the unsold blocks, SSG of 10 years (or 20 years for projects in Tin Shui Wai) counting from the commencement date of the flat selection period of the first sales phase for each unsold block will be provided.
housingauthority.gov.hk
该物业为位於新加坡商业中心区之商业发展项目,由50 层之办公室大楼、29 层之办公室大楼、连接至 Raffles Place 地铁站之地下铁道、作为上落客区之有盖广场 及附设 713 个泊车位之停车场组成。
ckh.com.hk
The Property is a commercial development located in Singapore’s central business district comprising a 50-storey office tower, a 29-storey office tower, an underground link to the Raffles Place mass rapid transit station, a sheltered plaza serving as a drop-off point and a hub car park with 713 car park lots.
ckh.com.hk
校园改建包括新建一处工程专区,一期是斥资$7500万新建的技术大楼,展示了碳中性设计和对能源研究的支持,其中包括新南威尔士大学世界一流的太阳能项目。
australiachina.com.au
This campus transformation includes a new Engineering Precinct, with Phase 1 a new $75 million Energy Technologies Building which will showcase carbon-neutral design and support in energy research, including UNSW’s world-leading solar energy program.
australiachina.com.au
但是,再举另外一例,如果某油漆工根据单一合 同在的各部分为单一客户工作,这对该油漆工而言构成单一项目, 该建筑可被视为开展此项工作的单一营业地,因为它构成一个商业和地理意 义上的统一整体。
daccess-ods.un.org
However, in the different example of a painter who, under a single contract, undertakes workthroughout a buildingfor a single client, this constitutes a single project for that painter and the building as a whole can then be regarded as a single place of business for the purpose of that work as it would then constitute a coherent whole commercially and geographically.
daccess-ods.un.org
随便看

 

英汉双解词典包含2273206条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
更新时间:2025/2/27 4:13:27