请输入您要查询的英文单词:

 

单词 Karahnjukar
释义

Karahnjukar

英语百科

Kárahnjúkar Hydropower Plant

(重定向自Karahnjukar)
Kárahnjúkastífla Dam
Construction of Kárahnjúkastífla Dam, concrete-face backside

Kárahnjúkar Hydropower Plant (Icelandic Kárahnjúkavirkjun) is a hydroelectric power plant in Fljótsdalshérað municipality in eastern Iceland designed to produce 4,600 gigawatt-hours (17,000 TJ) annually for Alcoa's Fjardaál aluminum smelter 75 kilometres (47 mi) to the east in Reyðarfjörður. With the installed capacity of 690 megawatts (930,000 hp), the plant is the largest hydroelectric power plant in Iceland. The project, named after nearby Mount Kárahnjúkur, involves damming the Jökulsá á Dal river and the Jökulsá í Fljótsdal river with five dams, creating three reservoirs. Water from the reservoirs is then diverted through 73 kilometres (45 mi) of underground water tunnels and down a 420-metre (1,380 ft) vertical penstock towards a single underground power station. The smelter became fully operational in 2008 and the hydro-power project was completed in 2009.

随便看

 

英汉双解词典包含3607232条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
京ICP备09058993号 更新时间:2025/6/28 16:08:23