网站首页  词典首页

请输入您要查询的英文单词:

 

单词 gezhouba
释义

gezhouba

  • 网络葛洲埧水利枢纽工程公司
1.
葛洲埧水利枢纽工程公司
...(Sinohydro)、中国路桥公司(CRBC)、葛洲埧水利枢纽工程公司Gezhouba)、中国中信集团公司(CITIC)、中国海 …
tw.myblog.yahoo.com

例句

释义:
1.
Now, in a remarkable turnaround in fortune, Chen is one of eight deputy managers at China Gezhouba Group Corporation International Ltd.
现在,陈九霖时来运转,摇身一变成为了中国葛洲坝集团国际工程有限公司(CGGCInternational)的八名副总之一。
www.bing.com
2.
It has descended obviously since the construction of Gezhouba.
自葛洲坝修建以来,宜昌断面枯水位明显下降。
www.ceps.com.tw
3.
Due to the need of Central China Grid, Gezhouba Hydropower Plant takes the responsibility of primary frequency regulation.
根据华中电网要求,葛洲坝电厂需要承担一次调频任务。
hzdl.alljournals.net
4.
Yangtze Power by the predecessor of Gezhouba Dam hydraulic power plant restructuring.
长江电力的前身是由葛洲坝水力发电厂重组改制而来。
www.cnqr.org
5.
The low water level of Yichang Section is a characteristic parameter which reflects the navigation condition of Gezhouba ship locks.
宜昌断面的枯水水位是反映葛洲坝船闸通航条件的特征参数。
www.ceps.com.tw
6.
Gezhouba Water Control Project on the Yangtze River is the first large-scale construction of water conservancy projects.
葛洲坝水利枢纽工程是长江干流上兴建的第一座大型水利工程。
dictsearch.appspot.com
7.
The technical measures for capacity extension of 125 MW hydropower units of Gezhouba hydropower station are described.
介绍了葛洲坝电站125MW水轮发电机组增容改造的技术措施。
dictsearch.appspot.com
8.
Finally, hydraulic variables were simulated and analyzed in the progenitive field of the Chinese Sturgeon below the Gezhouba Reservoir.
最后,本文选取葛洲坝下游中华鲟产卵场为研究河段,对其水力学要素进行分析。
www.fabiao.net
9.
Water- Level Fluctuation of the Reservoir Region Since the Operation of the Gezhouba Project
葛洲坝水利枢纽运行以来库区水位变化
www.ilib.cn
10.
Practice and study of concrete demolition and excavating of self-provided power plant of Gezhouba key water control project
葛洲坝水利枢纽自备电厂混凝土开挖爆破的研究与实践
www.ilib.cn
1.
Design for the Restoration of A Concrete Blanket Revetment in Sanjiang Channel of Gezhouba
葛洲坝三江航道混凝土护坡破损修复设计
www.ilib.cn
2.
Hydrology status on the spawning ground of Acipenser sinensis below the Gezhouba Dam and its relation to the spawning run
葛洲坝下游中华鲟产卵场的水文状况及其与繁殖活动的关系
www.ilib.cn
3.
Multi-Parameter Ecological Hydrology Model for Spawning Grounds of Acipenser Sinensis Downstream of the Gezhouba Dam
葛洲坝下游中华鲟产卵场的多参数生态水文学模型
scholar.ilib.cn
4.
Analysis the Aftereffect Following the Fault of Two Groups of High-Pass-Filters in Gezhouba Converter Station
葛洲坝换流站两组高通滤波器故障后果分析
www.ilib.cn
5.
Discussion on Improving Measures for Navigational Conditions of Entrance Area of Downstream Approach Channel in Sanjiang of Gezhouba
葛洲坝三江下引航道口门区通航条件改善措施探讨
service.ilib.cn
6.
Investigation and Evaluation of Primary Equipment Operation Condition in Gezhouba and Nanqiao HVDC Converter Stations
葛洲坝和南桥换流站一次设备运行情况和健康水平评估
www.ilib.cn
7.
Primary Equipment Operation Reliability Evaluation of Gezhouba and Nanqiao HVDC Converter Stations
葛洲坝和南桥换流站一次设备可靠性评估
www.ilib.cn
8.
Dimensionality Reduction Quickly Arranging Algorithm of Lock Chambers in Co - Scheduling of Three Gorges Dam and Gezhouba Dam System
三峡-葛洲坝联合调度系统闸室编排快速算法
www.ilib.cn
9.
Wang Lijun Three Gorges Technology and Economy Development Co. , Ltd METHODS OF OVERHAUL ABOUT GEZHOUBA OUTLET AND OVERFLOWING FACE
长江三峡技术经济发展有限公司葛洲坝水利枢纽泄水孔及过流面的检修方法
www.icold-cigb.org.cn
10.
The Contributions to Electric Power System Stability of Equipment Retrofit in Gezhouba Dajiang Hydropower Plant
葛洲坝大江电厂设备改造对电网稳定的贡献
ilib.cn
1.
Anti-corrosion methods for metal structures used in Gezhouba hydro project
葛洲坝水利柜纽金属结构防腐蚀方法
www.ilib.cn
2.
Operation Practice of the Reversed Water Radial Gate for Water Filling and Emptying of Gezhouba Shiplock
葛洲坝船闸输水反弧门运行实践
service.ilib.cn
3.
Approach to the Technical Innovation and Perfection of the Centralized Control System of Gezhouba Shiplock
浅析葛洲坝船闸集中控制系统技术改造与完善
www.ilib.cn
4.
Repetitive Measurement of Plane Monitoring-network and GPS Technique for Gezhouba Hydroproject
葛洲坝水利枢纽平面监测网复测及GPS网技术改造
www.ilib.cn
5.
Non-steady flow prototype observation and analysis between TGP dam and Gezhouba dam during peak regulation test of TGP power station
三峡电站调峰试验两坝间非恒定流原型观测分析
www.ilib.cn
6.
On the design of comprehensive benefit of Gezhouba project and its verification
葛洲坝工程综合经济效益的设计与实践
www.ilib.cn
7.
Test Study on the Improvement Engineering Measuresfor Navigation Flow Conditions of Dajiang Downstream Channel, Gezhouba Project
葛州坝大江下游航道通航水流条件改善措施试验研究
service.ilib.cn
8.
Finite Element Analysis and Optimization of Gezhouba Floating Door Mooring Installation
葛洲坝浮门系泊装置改造方案研究及优化设计
www.ilib.cn
9.
Jin guo-yu Wuhan University The Flow Field Simulate and Analysis of Acipenser Sinensis'spawning Site in Gezhouba Downstream
武汉大学葛洲坝下游中华鲟产卵场流场模拟和分析
www.icold-cigb.org.cn
10.
A Suggestion of Adopting Mobile Dams to Raise the Dry Season Water Level Downstream of the Gezhouba Project
利用活动坝抬高葛洲坝近坝段枯水位的方案研究
www.ilib.cn
1.
Research on Transition between Ground Return and Metal Return in Gezhouba-Nanqiao HVDC Transmission System
葛南直流输电系统中大地回线和金属回线转换的研究
www.ilib.cn
2.
Analysis and Countermeasure for the Signal Fault of Dynamo Switch off in Gezhouba Converter Station
葛洲坝换流站切机信号故障的分析和处理对策
scholar.ilib.cn
3.
Discussion on impact of the Gezhouba and Three Gorges projects on upstream channel storage curve
葛洲坝及三峡工程对上游槽蓄曲线影响探讨
www.ilib.cn
4.
Study on the Rejecting Load Transient in Turbine Uprating and Rehabilitating for Gezhouba Hydro-power Station
葛洲坝电站水轮机增容改造甩负荷过渡过程研究
service.ilib.cn
5.
Monitoring and analysis on downstream river channel impacted by Gezhouba hydroproject
葛洲坝枢纽运行对下游河段影响的监测研究
www.ilib.cn
6.
Non-uplift wire alignment monitoring automation system in Gezhouba hydropower station
无浮托引张线自动化观测系统在葛洲坝水电站的应用
ilib.cn
7.
Application of Plumb Telemetering System for Deformation Observation of the Lower Lock Head of Gezhouba No. 2 Shiplock
垂线遥测系统在葛洲坝2号船闸下闸首变形观测中的应用
www.ilib.cn
8.
Reviewing the Navigation Management of Gezhouba and Anticipating Better Navigation Management of the Three Gorges
总结葛洲坝通航管理经验谱写三峡通航管理新篇章
www.ilib.cn
9.
Present status and renovation of anti-wind device for the portal crane in GeZhouBa hydropower station
葛洲坝电站门机防风装置的现状及改造
www.ilib.cn
10.
Analysis on scour and deposit variation characteristic of sediment after the operation of Gezhouba hydro project
葛洲坝水利枢纽运行后泥沙冲淤变化分析
scholar.ilib.cn
1.
Analysis on the structural performances of brake for Gezhouba Power Plant and discussions on type selection
葛洲坝电厂制动器结构性能分析及选型探讨
www.ilib.cn
2.
Brief description of technical transformation of hydro-generator for Gezhouba Power Plant
葛洲坝电厂水轮发电机组技术改造简述
www.ilib.cn
3.
Flow Field Simulation and Analysis of Chinese Sturgeon Spawning Ground in Gezhouba Downstream
葛洲坝下游中华鲟产卵场流场模拟与分析
www.ilib.cn
4.
Development and Application of the Regional Stability Control Equipment for 500 kV Gezhouba Switchyard
葛洲坝500kV开关站区域稳控装置的建立与应用
www.ilib.cn
5.
The Summarize of Alteration and Capacity-Increasing in Gezhouba Hydropower Station
葛洲坝电站机组增容改造综述
service.ilib.cn
6.
Causes of Cracks on the Right 2 Blocks at the Lower Lock Head of Gezhouba No. 1 Shiplock and Strengthening Engineering for It
葛洲坝1号船闸下闸首右2块裂缝成因及补强工程
ilib.cn
7.
Power dispatching for the combined operation of the Three Gorges Hydropower Plant and the Gezhouba Hydropower Plant
三峡与葛洲坝两电站联合运行的发电调度
www.ilib.cn
8.
An observation on water current profiles of spawning of Acipenser sinensis downward Gezhouba Dam
葛洲坝下中华鲟自然繁殖流速场的初步观测
www.ilib.cn
9.
Flow field calculation and analysis of Acipenser Sinensis's spawning site in Gezhouba downstream
葛洲坝下游中华鲟产卵河段的流场计算与分析
www.ilib.cn
10.
Research on Capacity Extension of Hydropower Units of Gezhouba Hydropower Station
葛洲坝电站机组增容改造探讨
ilib.cn
1.
Monitoring and analysis on hydrologic sediment and navigation channel in Gezhouba dam area
葛洲坝坝区水文泥沙和航道监测与分析
www.ilib.cn
2.
Application of WBST-A Stepped Micro-Computer Governors to Gezhouba Dajiang Hydroplant
WBST-A型微机步进式调速器在葛洲坝大江电厂的应用
service.ilib.cn
3.
Run and improvement of stability control equipment for Gezhouba hydraulic power plant
葛洲坝水力发电厂系统稳定装置的运行与改进
ilib.cn
4.
Research on anti-erosion technology of hydraulic metal structures in Gezhouba project
葛洲坝水利枢纽泄洪、冲砂闸金属结构防腐技术研究
www.ilib.cn
5.
Hydrological modal of chinese sturgeon's spawning site at lower reach of Gezhouba Hydroproject
葛洲坝下游中华鲟产卵场的水文学模型
www.ilib.cn
6.
Some problems in the service of the gantry crane in Gezhouba Hydroelectric Project
葛洲坝枢纽门机大修中几个问题的探讨
www.ilib.cn
7.
Preliminary analysis of co-operation of pumped storage power station with TGP and Gezhouba project
蓄能电站与三峡及葛洲坝水电站捆绑运行初探
www.ilib.cn
8.
Home-produced Reconstruction for Control and Protection System of Gezhouba Converter Station
葛洲坝换流站控制保护系统国产化改造
ilib.cn
9.
Navigation Management at the River Reach near Gezhouba after Water Filling of the Three-Gorges Reservoir
三峡水库蓄水后的葛洲坝近坝河段通航管理
www.ilib.cn
10.
Reform and Capacity-Increasing of Generating Set in Gezhouba Hydropower Station
葛洲坝水轮发电机组的改造增容
www.ilib.cn
1.
Study on Navigation Condition of Dajiang Downstream Channel of Gezhouba Project
葛洲坝大江船闸下游航道通航水流条件试验研究分析
service.ilib.cn
2.
Electric stress measurement technology and testing methods of delivery water conduit of #3 ship lock in the Gezhouba Hydropower Station
葛洲坝#3船闸输水廊道工作阀门应力电测工艺及测试方法
www.ilib.cn
3.
Design for secondary network security in Gezhouba hydroelectric area
葛电区域电力二次系统安全防护设计
service.ilib.cn
4.
Research on Mooring Arrangement Scheme for Floating Repair Gate of Ship Lock at Gezhouba Project
葛洲坝船闸浮门浮式系泊装置方案研究
www.ilib.cn
5.
Review on the design of Gezhouba project and its verification
葛洲坝水利枢纽设计回顾及验证
www.ilib.cn
6.
Rehabilitation of outlet circuit breaker of hydro-generator of Gezhouba Power Plant
葛洲坝电厂水轮发电机出口断路器改造
www.ilib.cn
7.
Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream The Gezhouba Project
三峡工程对葛洲坝枢纽下游近坝段水位与航道影响研究
www.ilib.cn
8.
On Construction Measures for Navigable Depth of Gezhouba Dam During Construction of the Three-Gorges Project
三峡施工期葛洲坝通航水位工程措施研究
ilib.cn
9.
Evidence of normal embryonic development of Acipenser sinensis after natural spawning below Gezhouba Dam
葛洲坝下中华鲟自然产卵胚胎正常发育的证据
www.ilib.cn
10.
Study on the Navigation and Power Station for Hump Modulation of Three Gorges and Gezhouba Project
三峡电站调峰与通航问题研究
www.ilib.cn
1.
Computer information system for the check and management of Gezhouba Power Plant
葛洲坝电厂检修管理计算机信息系统
service.ilib.cn
2.
The failure and treatment of iron core in the stator end of No. 5 Power generator of Gezhouba Power Plant
葛洲坝电厂5号发电机定子端部铁心故障及处理
scholar.ilib.cn
3.
China Gezhouba Construction Group Co. , Thailand Branch
中国葛洲坝集团公司泰国项目部
www.bofcom.gov.cn
4.
Water environment protection for water area between Three Gorges Dam and Gezhouba Dam
三峡大坝与葛洲坝两坝间水域的水环境保护
www.ilib.cn
5.
Study on Navigation Condition of Down-stream Channel of Dajiang Lock of Gezhouba Project
葛州坝大江船闸下游航道通航水流条件试验研究
service.ilib.cn
6.
Analysis on the Optimal Operation in Hydroelectric Station of Gezhouba
葛洲坝水电站厂内优化调度分析
service.ilib.cn
7.
Scheduling of Three Gorges-Gezhouba Cascade Reservoirs
三峡-葛洲坝梯级水库运行调度
service.ilib.cn
8.
River Regime Regulating Works at Lower Reach of Gezhouba Hydroproject
长江葛洲坝水利枢纽下游河势调整工程
www.ilib.cn
9.
Scour and repair of the inlet of release structure in Gezhouba project
葛洲坝水利枢纽泄水建筑物进水口冲磨与修复
scholar.ilib.cn
10.
Risk factors of snail transmission and control measures in Gezhouba reservoir area of the Three Gorges
三峡葛洲坝库区钉螺传播危险因素及防治对策
168.160.184.82:8080
1.
Priority Algorithm of Ship Scheduler in Navigation Co-scheduling System for the Three Gorges-Gezhouba Dam
三峡-葛洲坝联合调度下的船舶调度优先级算法
www.ilib.cn
2.
Engineering Practice of Leakage Treatment for the Structural Joint of Gezhouba No. 1 Shiplock
葛洲坝1号船闸结构缝漏水处理工程实践
www.ilib.cn
3.
Analysis on potentiality of flood control of Gezhouba Reservoir
葛洲坝水库的防洪潜力分析
www.ilib.cn
4.
Application of Proximity Switch for Site Sensor Device of the Gate and Valve of Gezhouba No. 1 Shiplock
接近开关在葛洲坝1号船闸闸阀门现场传感装置中的应用
www.ilib.cn
5.
Design of Automatic Reading System of Electric Meters for Gezhouba Hydropower Plant
葛洲坝水力发电厂电能量自动抄表系统设计
www.ilib.cn
6.
Structural Dynamic Analysis on Head Cover of Gezhouba Water Turbine Set
葛洲坝水轮机组顶盖结构动力分析研究
www.ilib.cn
7.
The Mathematic Model and Algorithm for the Co-Scheduling of the Three Gorges Dam and the Gezhouba Dam
三峡-葛洲坝两坝联合调度数学模型及算法
www.ilib.cn
8.
On design and operation of turbine generator sets for Gezhouba project
葛洲坝电站水轮发电机组选型设计及运行实践
www.ilib.cn
9.
Software development of safety information management system of Gezhouba shiplock
葛洲坝船闸安全信息管理系统软件开发
www.ilib.cn
10.
Flood Regulation of Three Gorges-Gezhouba Step Power Station
三峡-葛洲坝梯级电站调峰分析
www.ilib.cn
1.
Nonlinear Study on Control System of Water Pollution in Operation of Extraordinary Type of Ship Lock in Gezhouba Dam
葛洲坝特大型船闸运行水污染控制系统非线性研究
www.ilib.cn
2.
Cause analysis on concrete crack of No. 1 Shiplock of Gezhouba hydroproject and study on strengthening
葛洲坝1号船闸混凝土裂缝成因及加固研究
www.ilib.cn
3.
Automatic system of reservoir regulation of Gezhouba Project
葛洲坝水库调度自动化系统
www.ilib.cn
4.
Approaching Ways of Equipment Management of the Three-Gorges Permanent Shiplock Based on Operation Practice of Gezhouba Shiplock
从葛洲坝船闸设备运行实践探讨三峡永久船闸设备管理之路
www.ilib.cn
5.
Mixed-Integer Programming to Navigation Co-scheduling of the Three Gorges Dam and the Gezhouba Dam
三峡葛洲坝联合通航调度的混合整数规划
www.ilib.cn
6.
Study on Capacity Extension Scheme of Gezhouba Project
葛洲坝工程扩机方案研究
www.ilib.cn
7.
Anti-erosion of hydraulic steel Structures at Gezhouba
葛洲坝水电厂水工钢结构防腐蚀
www.ilib.cn
8.
Reinnovation of Erjiang Discharging Sluice Automatic Monitoring System at Gezhouba Project
葛洲坝二江泄水闸自动监测系统更新改造
scholar.ilib.cn
9.
Maintenance and Repair of Gates and Hoists of Gezhouba Project
葛洲坝水工闸门和启闭机械维护检修
scholar.ilib.cn
10.
Practice of Planned Heavy Repair of Gezhouba Shiplock
葛洲坝船闸计划性大修实践
www.ilib.cn
1.
Identification and Test Method of Communifaction Fault in Gezhouba-Shanghai DC System
葛上直流系统通信故障的判别与测试方法
www.ilib.cn
2.
Technique design and fabrication of No1 ship lock at Gezhouba Hydropower Project
葛洲坝#1船闸人字门的工艺设计及制造
service.ilib.cn
3.
Development of DSS for Water Environment between Three Gorges and Gezhouba
三峡—葛洲坝区间水环境决策支持系统的开发
www.ilib.cn
4.
Causes of Leakage at the Base Culvert of Gezhouba No. 1 Shiplock and Treatment Method
葛洲坝1号船闸基础廊道渗漏水成因及处理
www.ilib.cn
5.
Survey on the Water Fowl on the Yangtze River above Gezhouba
葛洲坝及长江上游江面水鸟考察报告
www.ilib.cn
6.
Schistosomiasis disease surveillance in 2 endemic villages for 15 years in Gezhouba reservoir area
葛洲坝库区2个血吸虫病流行村15年病情监测
service.ilib.cn
7.
Practice and Discuss in "Black-Start" of Gezhouba Erjiang Power Station
葛洲坝二江电厂机组“黑启动”实践与探讨
ilib.cn
8.
Studies in the Strange Sound Produced from the Downstream Miter Gate of Gezhouba No. 3 Lock
葛洲坝#3船闸下游人字门异响初探
www.ilib.cn
9.
Oil supervision of Gezhouba Power Plant
葛洲坝水电厂油务监督
scholar.ilib.cn
10.
Concrete Placement of Gate Pier of Gezhouba HPP
葛洲坝闸墩浇筑
www.gzbgj.com
1.
Review of the Development Course of Computer Monitoring System of Gezhouba Dajiang Hydropower Plant
葛洲坝大江电厂计算机监控系统发展过程回眸
www.ilib.cn
2.
Analysis and practice of black start for Gezhouba Erjiang Power Plant
葛洲坝二江电厂机组黑启动实践与分析
ilib.cn
3.
Variations in spawning stock structure of Acipenser sinensis within 24 years since damming of Gezhouba Dam
葛洲坝截流24年来中华鲟产卵群体结构的变化
service.ilib.cn
4.
Governor Reform of Hydropower Set No. 21 in Gezhouba Power Station
葛洲坝电站21#机调速器改造
www.ilib.cn
5.
On Administration of Gezhouba Shiplock Operation of the Past 20 Years
简论葛洲坝船闸运行管理20年
www.ilib.cn
6.
Water leakage treatment of No. 3 shiplock at Gezhouba project
葛洲坝3号船闸的漏水处理
www.ilib.cn
7.
The Study and Application on Generator Switch off System of Gezhouba Dajiang Power Station
葛洲坝大江电厂交直流切机系统的研发与应用
ilib.cn
随便看

 

英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
更新时间:2025/1/28 3:44:43