单词 | Dam?s |
释义 | Dam?s例句释义: 全部 1. First, the concept of tailings dam's stability is determined, so the scope of safety and stability analysis can be known well. 首先,确定尾矿坝稳定性概念,指明安全稳定性的分析范围; degree.fzu.edu.cn 2. Beijing has said some of the dam's resettlement funds were misused by local governments but pledged to clean up the problems. 北京虽然表示三峡工程的一些人员重新安置资金被地方政府滥用了,但表示要解决这些问题。 cn.wsj.com 3. Since the dam's completion, the region around Poyang Lake has seen nearly annual droughts, turning some areas into dust bowls. 大坝建成以来,鄱阳湖周边地区几乎每年都会有干旱发生,有些地区变成风沙侵蚀区。 www.bing.com 4. The official recognition of the dam's dangers suggests that the project's environmental and public health impacts are starting to sink in. 政府承认,大坝所存在的风险和对环境及公众健康的影响已经开始真正的被重视了起来。 www.bing.com 5. Raising the dam's water level increased the surface area of water in the dam. 提升大坝的水位增加了大坝的水面面积。 www.cowinfo.com 6. Supporters claimed the dam's benefits -- preventing devastating floods downstream and generating clean power -- outweighed any negatives. 支持者称,三峡大坝利大于弊,不但有助于预防下游的洪涝灾害,还带来了清洁能源。 www.ebigear.com 7. Cracks development and change in concrete dams will directly affect the dam's strength and overall structural characteristics. 混凝土大坝的裂缝发展变化将直接影响到大坝的强度和整体结构安全性。 www.boshuo.net 8. The dam's greener hue isn't because of any special environmental ardor on the part of the builders. 圣安东尼奥大坝之所以显得更加环保,不是因为建坝者有什么特别的环保热情。 chinese.wsj.com 9. Officials are also concerned the declining water levels at the dam's reservoir could cause power shortages and affect shipping lanes. 官员们也担心库区水位下降会导致电力短缺和影响通航。 www.bing.com 10. It shows that for the first time for many years, Myanmar's regime is prepared to annoy China, the dam's main backer. 它显示缅甸当局多年来首次打算激怒中国,因为中国正是这条大坝的主建方。 www.ecocn.org 1. The saturation curve of earth dam two-dimension elevation seepage flow is tangent to the dam's downstream slope at the overflow point. 土坝立面二维渗流的浸润曲线在溢出点处与坝下游坡面相切。 www.ceps.com.tw 2. The dam's supporters stress the need to build modern infrastructure, regenerate the poor, southeastern region. 支持建坝者强调,有需要兴建现代化基础工程,让贫穷的东南地区获得新生。 dictsearch.appspot.com 3. Study results show that the model has higher precision in simulating the dam's horizontal displacement than normal models. 算例表明,该模型对坝体水平位移的拟合精度好于常规模型。 www.ceps.com.tw 4. But by Friday the decision had been overturned, paving the way for the dam's construction. 但是,到了周五风云突变,原有的决定被推翻,大坝建造工程上马在即。 www.bing.com 5. Observations from the NASA-built Landsat satellites provide an overview of the dam's construction. 观察从美国宇航局建成Landsat卫星概述了三峡大坝的建设。 blog.sina.com.cn 6. The masonry gravity dam's anisotropic elasticity and minipore stress are systematically analyzed. 较为系统地探讨了浆砌石重力坝的异弹模、小孔应力等问题。 www.fabiao.net 7. Just one of the dam's main generators can produce 700 megawatts of electricity. 仅仅其中一个主要的发电机就可以产生700兆瓦的电力。 www.bing.com 8. When Pakistan objected to the dam's design, India accepted international arbitration, the first case in the treaty's history. 起初,由于巴基斯坦反对这座大坝的设计,印度接受了国际仲裁,这在条约历史上尚属首例。 dongxi.net 9. A dam's churning waters aerate the river and whip up more foam, Ribeiro said. "It is like turning on a washing machine. " 大坝将河水翻腾起来掀起更多的泡沫,里贝罗说,“就像在洗衣机里搅拌一样” www.bing.com 10. Information from NASA's Terra and Aqua satellites also revealed the dam's effect on land surface temperatures. 信息来自美国宇航局Terra和Aqua卫星还透露了三峡大坝的影响,地面温度。 blog.sina.com.cn 1. The dam's apparent revival adds to Mr. Bo's long list of economic achievements since becoming Chongqing's party secretary in 2007. 大坝项目的明显复活给2007年以来重庆取得的一系列经济成就单上又增添了新的内容。 www.bing.com 2. The prediction accuracy of grey theory is limited by the dam's randomness. 利用灰色理论的建模预测方法对随机性较大的数据预测精度不高; lib.cqvip.com 3. Cracks have appeared on the dam's surface and workshops at the site have collapsed. 大坝的表面有裂痕,而且那个地方的厂房已经坍塌。 blog.ecocn.org 4. In 2002, hundreds of ships still passed through the dam's diversion channel on a daily basis. 2002年,每天仍有数百艘船行经大坝的导流明渠。 blog.sina.com.cn 5. But he cautions that many of the dam's effects may not be immediately apparent. 但他同时提醒,大坝所产生的许多影响并不会马上体现出来。 www.bing.com 6. 'Any flood with water flow exceeding 122, 000 cubic meters per second would put the dam's own safety at risk, ' he's quoted as saying. 《中国日报》引用他的话说,每秒流量超过122,000立方米的洪水将危及大坝本身。 c.wsj.com 7. Because we saw what's up there. The dam's gonna break. The entire valley's gonna flood. 我们看到了上面发生的情况。这个大坝马上就要塌了,洪水会淹没整个河谷。 en.chinabroadcast.cn 8. Questions about the dam's usefulness in flood control comes on top of other issues. 大坝在洪水控制方面是否有效的问题是最最重要的。 cn.wsj.com 9. Ms. Dai called the statement an attempt by China's leaders to 'shirk responsibility' for the dam's problems. 戴晴认为,声明是中国领导人在为大坝存在的问题“推卸责任”。 www.12edu.cn 10. TO MAKE THE RESERVOIR, ENGINEERS CLOSED THE DAM'S LOCKS AND STOPPED THE RAGING RIVER. 为了形成水库,工程人员合拢了大坝的闸门,阻挡住了汹涌的河水。 www.lforums.com 1. I thought Friday we learned about dam's theory. 我想起来星期五我学习了关于水坝的原理。 blog.sina.com.cn 2. so , there are major meanings on the calculation of massive - head dam ' s strength and the reliability of dam under the earthquake. 可见对大头坝的强度的计算,及地震作用下大坝的可靠度的分析有着重要意义。 www.ichacha.net 3. Three Gorges dam's building is totally a fault. 三峡大坝的修建完全是错误的。 www.ltaaa.com 4. Because we saw what's up there. The dam's gonna break. 我们看到了上面的状况水坝快决堤 www.kekenet.com 5. Following a brief period of openness, discussion of the dam's environmental effects has once again become largely taboo in China. 经过了一个极为短暂的时期的开放,关于三峡大坝对环境影响的讨论在中国国内再次被禁。 www.bing.com 6. Floodwaters in the giant reservoir rose 4m (13ft) overnight, and are now just 20m below the dam's maximum capacity. 水库里洪水的储量一晚上涨了4米,还差20米就达到大坝的最大容量了 bbs.ebigear.com 7. Floodwaters in the giant reservoir rose 4m (13ft) overnight, and are now just 20m belthe dam's maximum capacity. 在巨大的蓄水池中的洪水一夜上升4米,并且现在在大坝最大能力之下仅20米了! bbs.ebigear.com 8. Inverse Analysis of the Concrete Dam's Temperature Conduct Modulus and Rule of Its Change Along with the Time 混凝土大坝导温系数反演及其随时间变化的规律 service.ilib.cn 9. Optimized Inversion Analytical Procedure with Mixed Model for Dam's Mechanics Parameters and Its Application 坝体力学参数的混合模型优化反演法及其应用 www.ilib.cn 10. Brief Analysis of the Conditions of Utilizing Arch-Dam's Overhang to Improver Its Own Stress 利用拱坝倒悬改善应力条件之浅析 www.ilib.cn 1. Nonlinear perturbation stochastic finite element method for reliability analysis of earth dam's stress and deformation 土坝应力和变形的非线性摄动随机有限元分析 www.ilib.cn 2. Elementary probing into the deep channel stability and the dam body security problem of reservoir dam's concrete cutoff wall construction 库坝混凝土防渗墙施工中深槽稳定和坝体安全问题初探 www.ilib.cn 3. The Rapid Construction of the Inlet of the Constant Dam's Tunnel and Mechanical Supporting Techniques 定水坝隧道进口快速施工及机械配套技术 www.ilib.cn 4. Analysis on Factors Influencing Stability of Fine Grained Tailings Dam and Measures for Improving Dam's Stability 影响细粒尾矿坝安全稳定性因素及对策 service.ilib.cn 5. Analysis on the Causes of the Cracks in the Overflow Dam's Brake Pier and Their Reinforcement Research 溢流坝闸墩裂缝成因分析与加固研究 service.ilib.cn 6. Checking and accepting of the main dam's security monitoring automatization system project 大坝安全监测自动化系统工程的验收 ilib.cn 7. The Sensitiveness Analysis of Sanmenxia Dam's Control Network for Deformation Observation 三门峡大坝变形观测网的灵敏度分析 service.ilib.cn 8. Application of the coefficient of the regress for monitoring model of dam's transmutation 遗传算法在建立大坝变形监控模型中的应用 service.ilib.cn 9. Rock Stability and Handling Method of Reinforcing Rock for Lower Rock Slope of Arch Dam's Right Shoulder in Yanjin Bridge Reservoir 盐津桥水库右坝肩下游岩体稳定与工程加固处理 www.ilib.cn 10. Ensuring the dam safety periodic inspection carried out smoothly and speeding up the risk dam's repaired 确保大坝安全定期检查顺利开展加快病险坝补强加固 www.ilib.cn 1. Analysis of factors influencing stability of tailing dam and measures for improving dam's stability 影响尾矿坝安全稳定性因素分析及对策 www.ilib.cn 2. Application of Fuzzy Clustering Analysis Method to the Prediction of Dam's Displacement 模糊聚类分析法在预报坝体位移上的应用 scholar.ilib.cn 3. Discussion on Secondary Monitoring Method of Roller Compacted Concrete Dam's Deformation 探讨碾压混凝土坝变形二级监控指标的拟定方法 service.ilib.cn 4. Basic research on the mechanism of the earthquake with high-dam and big-reservoir and the dam's safe life 高坝大库震灾机理及安全寿命基础研究 service.ilib.cn 5. Non-damage detecting holes of dam's plate by comprehensive Geophysical Prospecting 采用综合物探法进行大坝面板脱空无损探测 www.ilib.cn 6. Seepage prevention design for the Daren reservoir earth dam's split grouting 大任水库土坝劈裂灌浆防渗设计 ilib.cn 7. Study on Optimal Simulation for Equipment Matching of Rock-fill Dam's Material Shipping 堆石坝坝料装运机械配套优化仿真研究 www.ilib.cn 8. The Dynamic Variation of Nitrogen Contents in the Water-Body of Da Yuan Du Reservoir before and after the Dam's Joint 大源渡合坝前后库区水体中氮含量的动态变化 www.ilib.cn 9. Management of the Hydraulic Station Dam's Safe Monitoring Data 水电站大坝安全监测数据的管理 www.ilib.cn 10. On the application of the jet grouting technique in the construction of the Longhekou Dam's diaphragm-wall 高压喷射灌浆技术在大坝防渗加固中的应用 www.ilib.cn 1. Boundary Element Analysis of the Dam's Infiltration 大坝渗流的边界元分析 www.ilib.cn 2. Safety monitoring time-varying model of concrete dam's deformation 混凝土坝变形安全监控时变模型 service.ilib.cn 3. Analysis on Dam's Displacement of Guangzhou Pumped Storage Station 广州抽水蓄能电站大坝位移监测成果分析 ilib.cn 4. Analysis of the Observation Materials of Biliuhe Reservoir Dam's Bypass Seepage 碧流河水库大坝绕坝渗流观测资料分析 www.ilib.cn 5. Main engineering geologic problems and the processing of the big dam's foundation of BMPDP 百色水利枢纽大坝坝基主要工程地质问题与工程处理 ilib.cn 6. Probe into relatively better time-effect model of earth-rock dam's deformation 探讨较优的土石坝变形时效模型 service.ilib.cn 7. The Operating Situation of Wanjiazhai Dam's Pressing System Its Rebuilding Suggestions 万家寨大坝扬压力系统运行现状及改造建议 www.ilib.cn 8. Three gorge dam's tourism customer resources research 三峡大坝旅游客源市场分析 www.ilib.cn 9. Detecting Nonlinearity in the Dam's Monitoring Data 大坝安全监测资料的非线性检验 www.ilib.cn 10. Earth Dam's Surface Task and Safety Earth Dam Quality Control 土坝的坝面作业与土坝质量控制的研究 www.ilib.cn 1. Primary Analysis of Dam's Leakage Causation in Zhushuqiao Reservoir 株树桥水库大坝渗漏原因初步分析 www.ilib.cn 2. The Technology of Big Dam's Security Monitoring 大坝安全监测的技术手段 service.ilib.cn 3. Research on Hybrid Model of Dam's Displacement Based on Partial Least Square Regression 基于偏最小二乘回归的大坝位移混合模型研究 scholar.ilib.cn 4. Arch dam's shape optimization design based on evolution strategy 基于进化策略的拱坝体型优化设计 service.ilib.cn 5. Grouting in Dam's Rock Foundation 大坝基岩灌浆 webpac.clas.ac.cn:81 6. Inversing Analysis of Arch Dam's Space Structure 大坝空间结构的反演分析 www.ilib.cn 7. Dam's Stability and Stress Calculation by Use of Material Mechanics Method Based on FEM 基于有限元的材料力学法稳定与应力计算 www.ilib.cn |
随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。