网站首页  词典首页

请输入您要查询的英文单词:

 

单词 concrete(2)
释义

concrete(2)

例句

释义:
1.
Before you know it, she has a Sophie's choice to make involving her two trapped children and a concrete slab.
很快,像苏菲一样,她必须做出选择,因为她的2个孩子被压在了预制板下面。
www.bing.com
2.
Modal experiments during the loading process of two reinforced concrete arch ribs from an old bridge were performed.
对某旧桥中的2根钢筋混凝土拱肋进行了加载过程中的模态试验。
www.ceps.com.tw
3.
The creation of a free trade area between the 2 countries serves as a concrete action for both sides to combat trade protectionism.
建立中瑞自贸区是两国共同反对各种形式保护主义的具体行动。
www.chinadaily.com.cn
4.
The concrete proportions and test result of 28-day compressive strength are shown in Table 2.
具体比例和试验结果在28天内抗压强度见表2。
zhidao.baidu.com
5.
P Eurocode 2 is only concerned with the requirements for resistance, serviceability, durability and fire resistance of concrete structures.
欧洲规范2是有关对混凝土结构的抗力,适用性,耐久性和防火性的要求。
gatefanyi.com
6.
The numerical simulation calculation for the void evolution problem under a concrete slab is carried out in this paper. 2.
依据数值计算结果,从三个方面来分析水泥混凝土路面板的脱空演化过程。
www.13191.com
7.
Admixtures for concrete, mortar and grout - Part 2 : concrete admixtures - Definitions, requirements, conformity, marking and labelling.
混凝土,灰浆和灌浆外加剂.第2部分:混凝土外加剂,定义,要求,一致性,标记和标签
www.mapeng.net
8.
Railway applications - Track - Performance requirements for fastening systems - Part 2 : fastening systems for concrete sleepers.
铁路设备.轨道.紧固系统的性能要求.第2部分:混凝土轨枕的紧固系统
blog.sina.com.cn
9.
Combining the general issues from Figure 2 with the SOA patterns from Figure 3 leads to concrete recurring is- sues.
将图2中的普遍问题和图3中的SOA模式结合起可以引出具体问题的重现。
www.infoq.com
10.
KRR-2 was consisted of 12 laboratories, 10 lead hot cells and two concrete foot cells, which used for experiments with radioisotopes.
KRR-2是由12个实验室,10铅热室和两个详细的脚细胞,这与实验中使用的放射性同位素。
www.ledu001.com
1.
Machines for the manufacture of constructional products from concrete and calcium-silicate - Safety - Part 2 : block making machines.
混凝土和硅酸钙类建筑产品用生产机器.安全.第2部分:制块机
blog.sina.com.cn
2.
Railway applications - Track - Concrete sleepers and bearers - Part 2 : prestressed monoblock sleepers.
铁路设施.轨道.混凝土枕木和支撑架.第2部分:加预应力的单块枕木
blog.sina.com.cn
3.
Conclusions: Healthcare providers should incorporate into their practice concrete measures to reduce the risk of developing CVD and T2DM.
推论:健康咨询师应该结合他们具体的实践工具以减少心血管疾病和2型糖尿病发生发展的危险度。
bbs.tnbz.com
4.
Note 2: The properties and rules for the use of indented bars with precast concrete products may be found in the relevant product standard.
注2:与预制混凝土产品一起使用的刻痕钢筋的性能和规定在相关的产品标准中可以查到。
gatefanyi.com
5.
BUILDING WORKS. PRIVATE CONTRACTS. EXECUTION OF FLOOR HEATING THROUGH ELECTRIC CABLES SET IN CONCRETE. PART 2 : SPECIAL CLAUSES.
建筑工程.私人合同.楼板取暖混凝土埋设电缆的实施.第2部分:特别条款
www.mapeng.net
6.
Trace defines three pointcuts; two of them are concrete and one abstract, as shown in Figure 2.
跟踪定义了三个切入点;其中的两个是具体的,一个是抽象的,正如图2所示。
www.ibm.com
7.
Concrete was supplied from a batching plant located approximately two miles.
混凝土由距工地大约2英里的分批拌合厂供给。
www.jukuu.com
8.
Testing concrete in structures - Part 2 : non-destructive testing - Determination of rebound number.
结构中的混凝土试验.第2部分:无损检验.回弹数的测定
www.mapeng.net
9.
Up close, the 2-3mm gaps make a startling pattern and from certain angles or at a distance appear exactly the same as normal concrete.
靠近仔细看,这些2、3毫米的缝隙形成了的图案会让你大吃一惊,但是从某个角度或者从远处看,它和普通的混凝土没什么两样。
www.bing.com
10.
And the influence of temperature as well as the concrete shrinkage and creep is also analysed briefly. 2.
对温度以及混凝土收缩徐变对结构的影响作了简要分析。
www.boshuo.net
1.
Steel for the reinforcement and prestressing of concrete - Test methods - Part 2 : welded fabric.
混凝土的钢筋和预应力用钢.试验方法.第2部分:焊接纤维
www.mapeng.net
2.
The evaporable water method is feasible to measured porosity of concrete.
采用这2种方法测定的孔隙率均与混凝土的宏观性能存在良好的对应关系。
www.ceps.com.tw
3.
admixtures for concrete , mortar and grout . test methods . part 2 : determination of setting time.
混凝土灰泥和薄浆混合料。试验方法。第2部分:凝结时间测定。
www.ichacha.net
4.
This article designs and checks that BaoCheng railway QingJiang 2# reinforced concrete arch bridge paves continuous welded rail.
本文选题结合宝成线清江2号钢筋混凝土拱桥,对此桥铺设无缝线路进行设计及检算。
www.lw23.com
5.
Testing hardened concrete - Part 2 : making and curing specimens for strength tests.
硬化混凝土试验.第2部分:强度试验用样品的制备和养护
blog.sina.com.cn
6.
The optimal location of the foam concrete is obtained, and the thickness ratio of outer reinforce concrete to inner is about 1: 2.
泡沫混凝土层在复合衬砌结构中的最佳位置,外侧钢筋混凝土与内侧钢筋混凝土厚度比大致在1:2左右。
www.boshuo.net
7.
The total construction area of 14, 818 square meters, 5-storey, part 2 layer for the concrete frame structure.
总建筑面积为14818平方米,楼高5层,局部2层,为混凝土框架结构。
www.chuncui.cn
8.
Fig. 1 shows a plain concrete foundation to main walling and fig. 2 a reinforced concrete foundation to an isolated pier.
图1是承重墙下面素混凝土基础的示意图,图2为独立柱下的钢筋混凝土基础的示意图。
tr.bab.la
9.
and concrete loop tensile stress laid on penstock waist outer edge and top inner one is 2-4 times of design tensile strength of concrete.
并且管腰外缘和管顶内缘混凝土环向拉应力是混凝土设计抗拉强度的2-4倍。
www.juyy.net
10.
The value object in Listing 2 looks almost identical to our remote interface, but it's actually a concrete class.
清单2中的值对象看起来和我们的远程接口几乎相同,但它实际上是具体类。
www.ibm.com
1.
Apply 2-component adhesive of epoxy evenly on the prepared concrete base.
在铺好的水泥板上均匀地涂上一层双组分环氧树脂胶。
www.dictall.com
2.
2 should comply with the durability of concrete (antifreeze, anti-permeability, erosion resistance), such as design requirements.
混凝土应符合耐久性(抗冻、抗渗、抗侵蚀)等设计要求。
www.hfwhjx.com
3.
There existed cracks in the lock's concrete bottom floor of Bengbu lock 2 project.
蚌埠复线船闸工程混凝土底板局部出现裂缝。
www.ceps.com.tw
4.
All paving shall have an absolute minimum slope for drainage of 1% for concrete paving and 2% for asphaltic paving.
所有混凝土铺面的绝对最小排水坡度应达到1%,沥青铺面则应达到2%。
wenku.baidu.com
5.
The step to attach the concrete policy and binding is exactly the same as step 2.
附加具体策略和绑定的步骤与步骤2完全一样。
www.ibm.com
6.
A practical method for 2-D and 3-D modeling of concrete aggregates with arbitrary shapes is presented.
提出了平面二维、空间三维任意形状混凝土骨料的模拟方法。
www.ceps.com.tw
7.
End pumping concrete pump after the anti-1 ~ 2 cycle, the elimination of pipeline pressure.
泵送完砼后反泵1~2个循环,消除输送管中压力。
www.bokee.net
8.
This tutorial takes you beyond the basics you learned in Part 1, Part 2, Part 3, and Part 4 and introduces a concrete managed application.
本教程以第1部分、第2部分、第3部分和第4部分的内容为基础,将向您介绍一个具体的托管应用程序。
www.ibm.com
9.
Beijing Yicheng Lafarge Concrete Co. , Ltd was formally established in February, 1996, which was controlled by Lafarge Group.
年2月,由拉法基集团控股的北京易成拉法基混凝土有限公司正式成立。
www.hrm.cn
10.
Joe's wrapped the G-2 around a concrete divider.
在一个具体的分配人周围被包装G-2的乔。
www.showxiu.com
1.
P The requirements concerning minimum concrete cover shall be satisfied (see 4. 4. 1. 2).
有关规定应涉及混凝土的最低满足标准(见4.4.1.2)。
gatefanyi.com
2.
It can be dropped on a concrete floor from 2m from any angle and operates in temperatures as low as -20oC and as high as 55oC.
它可以任何角度从2米高的地方掉落在混凝土地面上,并可在-20oC至55oC的温度下工作。
www.ftchinese.com
3.
In the XML mapping file, shown in Listing 2, you ll notice that the two concrete classes are declared as
在清单2所示的XML映射文件中,您会注意到,在
www-128.ibm.com
4.
Prefabricated reinforced components of autoclaved aerated concrete - Part 2: Design and calculation of structural components
蒸压加气混凝土的预制加筋部件.第2部分:结构部件的设计和计算
www.mapeng.net
5.
step irons for staggered manhole steps - part 2 : step irons to be set into prefabricated concrete units
人孔错列阶梯脚扣.第2部分:浇入混凝土预制件的阶梯脚
www.ichacha.net
6.
Precast concrete products - Precast concrete garages - Part 2: Steel fibre concrete garages; Product properties and performances
预制混凝土产品预制混凝土车库第2部分:钢纤维混凝土车库,产品性能及使用情况
www.mapeng.net
7.
Technique of Slope Support by Concrete Ribs Used in Tender Section 2 of Badong Reservoir Bank in Three Gorge Reservoir Area
三峡库区巴东库岸2标段砼肋护坡施工技术
www.ilib.cn
8.
Products and systems for the protection and repair of concrete structures - Test methods - Specific weight - Part 2: Immersed body method
混凝土构件保护和修理用产品和系统试验方法比重第2部分:浸没物体法
www.mapeng.net
9.
Corrosion of Reinforcing Steel and Reinforced Concrete, 2nd Eidtion ( Cambridge Scientific Abstracts - Materials Information )
钢筋和钢筋混凝土的腐蚀,第2版(剑桥科学文摘-材料信息)
book.cnpeak.edu.cn
10.
step irons with upstand for staggered manhole steps - part 2 : step irons to be set into prefabricated concrete units
人孔直立错列阶梯脚扣.第2部分:浇入混凝土预制件的阶
www.ichacha.net
1.
Precast concrete products - Test method for glass-fibre reinforced cement - Part 2: Measuring the fibre content in fresh GRC, Wash out test
预制混凝土制品玻璃纤维增强水泥试验方法第2部分:新玻璃纤维增强水泥中纤维含量的测量冲刷试验
www.mapeng.net
2.
Bituminous mixtures - Material specifications - Part 2: Asphalt concrete for very thin layers
沥青混合物材料规格第2部分:极薄层沥青混凝土
www.mapeng.net
3.
Railway applications; Track - Concrete sleepers and bearers - Part 2: Presstressed monoblock sleepers
铁路设备轨道混凝土枕木和垫块第2部分:预应力单块枕木
www.mapeng.net
4.
Formwork Design and Concrete Construction of Piers for the Extra Large Yuquan Bridge No. 2 Route
鱼泉2号三线特大桥桥墩模板设计及混凝土施工
www.ilib.cn
5.
Standard for Safety for Hand-held Motor-operated Electric Tools - Safety - Part 2-12: Particular Requirements for Concrete Vibrators
手持式电动工具的安全标准.安全.第2-12部分:混凝土振捣器的特殊要求
mapeng.net
6.
The Fourth World Congress on Joint Sealing and Bearing Systems in Concrete Structures - Volume 2
第四次世界大会上联合密封和轴承系统在混凝土结构-第2卷
blog.sina.com.cn
7.
Precast concrete products - Hollow core slabs for floors - Part 2: Reinforced slabs
预制混凝土制品楼板用空心板第2部分:加强板
www.mapeng.net
8.
Concrete tests; Test specimens; Part 2 : Making and curing of test specimens for strength tests
混凝土试验.试样.第2部分:强度试验的试样制作和养护
www.mapeng.net
9.
Hand-held motor-operated electric tools - Safety - Part 2-12: Particular requirements for concrete vibrators
手持式电动工具的安全。第2-12部分:混凝土振捣器的特殊要求
www.chinastandard.com.cn
10.
Slag aggregate for concrete -- Part 2: Ferronickel slag aggregate
混凝土用矿渣集料。第2部分:镍铁矿渣集料
www.isres.com
1.
Construction of 2 600 mm Thick Reinforced Concrete Structure with Large Cross-Section and Radiation Protection
厚达2600mm的大截面防辐射钢筋混凝土结构施工
ilib.cn
2.
operating conditions: 1, finished pouring concrete roof, concrete to form removal strength; 2, received a notice form removal project;
作业条件:1、顶板混凝土浇筑完毕,混凝土达到拆模强度;2、接到项目拆模通知单;
www.jianhuw.com
3.
Concrete Tools Vol. 2 - Proportioning and Handling Concrete
具体的工具卷。2-配料和处理的具体
blog.sina.com.cn
4.
Treatment on the concrete crack of tail tunnel No. 2 In Shisanling pumped storage station
十三陵抽水蓄能电站2号尾水隧洞混凝土裂缝处理
ilib.cn
5.
Scenario 2: Use jMock to mock a concrete class with a default constructor
场景2:使用jMock模拟带有默认构造函数的具体类
www.ibm.com
6.
free - standing chimneys - part 2 : concrete chimneys
独立式烟囱.第2部分:水泥烟囱
www.ichacha.net
7.
Standard Specification for Uncoated, Weldless, 2- and 3-Wire Steel Strand for Prestressed Concrete
预应力混凝土用无涂层、无焊缝、2股及3股钢绞绳
bbs2.jxcad.com.cn
8.
Design of concrete structures - Part 2: Concrete bridges
混凝土结构设计第2部分:混凝土结构桥梁
www.mapeng.net
9.
Steel for the prestressing of concrete - Part 4: Strand; Technical corrigendum 2
预应力混凝土用钢材.第4部分:绞合线.技术勘误2
www.mapeng.net
10.
Steel for the reinforcement of concrete; part 2: ribbed bars
混凝土增强用钢.第2部分:带筋钢条
www.mapeng.net
1.
Concrete Pouring at Bridge C2 Construction of Cast Insitu Bridge
2桥之混凝土倾灌工程
www.hyd.gov.hk
2.
Steel for the prestressing of concrete; part 2: cold-drawn wire
预应力混凝土用钢材.第2部分:冷拉钢丝
www.mapeng.net
3.
Picture 2 the project of the concrete slope greening in
图片2隔河岩电厂水泥边坡绿化工程
www.landscape.cn
4.
Fly ash for concrete - Part 2: Conformity evaluation
混凝土飞灰第2部分:合格评价
www.mapeng.net
5.
Method 2 - Making a Paw Print Mold Using Concrete
方法2-用混凝土做爪子印模型
www.bing.com
6.
testing fresh concrete - part 2 : slump test
新浇混凝土试验.第2部分:坍落度试验
www.ichacha.net
7.
2 the foreign request service concrete implementation, composeswork and so on report;
外商委托业务的具体实施、撰写报告等工作;
zhidao.baidu.com
随便看

 

英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
更新时间:2025/1/28 0:25:28