单词 | tailrace |
释义 | 例句释义: 泄水道,尾水渠,放水路,尾水沟 1. The papermaking introduced the construction method for anchor cable with large-angle upward hole in tailrace surge tank. 介绍了尾水调压室大角度上仰孔锚索的施工方法。 www.dictall.com 2. The tailrace diffusion section of Shenxigou hydropower plant dam is gradually changed from round to square. 深溪沟水电站厂房坝段尾水扩散段两边墩内弧线由圆变方渐变成形。 airiti.com 3. Governing stability and optimization of setting parameter for a pumped storage power station with long tailrace tunnel 长尾水洞抽水蓄能电站调节稳定性及参数优化 www.ilib.cn 4. Excavation and Construction of a Compactly Arranged Shallow-embedded Tailrace Tunnel in the Baise Project 百色工程紧凑型浅埋式尾水隧洞开挖施工 www.ilib.cn 5. Controlled Blasting Cancel of Tailrace Cofferdam under Complicated Surroundings and Complex Medium Condition at Hydropower Project 复杂环境和复杂介质条件下的水电站尾水围堰控制爆破拆除 www.ilib.cn 6. A Brief Introduction to the Construction of the Long Tailrace Tunnel in the Dachaoshan Hydropower Project 大朝山水电站长尾水隧洞施工简介 www.ilib.cn 7. Field test on heat and moisture transfer performance of tailrace tunnel ventilation in a hydropower station 水电站无压尾水洞引风热湿交换特性的现场测试 www.ilib.cn 8. Study on the tailrace system with the ceiling height changes of underground powerhouse of Xiangjiaba Hydroelectric Project 向家坝水电站地下厂房变顶高尾水系统研究 www.ilib.cn 9. Excavation and construction technique for tailrace structures of underground powerhouse 地下厂房工程尾水系统开挖施工技术 ilib.cn 10. Thermodynamic calculation method of tailrace tunnel ventilation process in hydropower stations 水电站无压尾水洞引风过程热工计算方法 www.ilib.cn 1. Excavation, Anchorage and Shotcrete Support Construction Supervision of Tailrace Surge Chamber for Dachaoshan Hydropower Station 大朝山水电站尾水调压室开挖及锚喷支护施工监理 www.ilib.cn 2. Analysis on origins of tailwater level increase and benefit of Liujiaxia hydropower station after tailrace debris removal 刘家峡水电站尾水位抬高的原因及清渣后效益分析 www.ilib.cn 3. Testing and revising the velocity coefficient at bank sides of the tailrace of Tanghe reservoir power station 汤河水库电厂尾水渠岸边流速系数的试验与订正 service.ilib.cn 4. The Stability Calculation for Speed Governor of Hydropower Plant of Multiple Units with One Tailrace 多机一洞水电站水力调速系统的稳定计算 service.ilib.cn 5. Application of Guide Joints in Lining of the Main Tailrace Tunnel in Construction of Dachaoshan Hydropower Plant 诱导缝在大朝山尾水主洞衬砌中的应用 www.ilib.cn 6. Curtain Grouting Test in Sand and Gravel Formation in Transition Section of Tailrace Tunnel at Shawan Hydropower Station 沙湾电站尾水渠渐变段砂卵石地层帷幕灌浆试验 www.ilib.cn 7. A Summary of the Construction of the Underground Powerhouse Tailrace Tunnel System of the Baise Hydropower Project 百色水利枢纽地下厂房尾水洞系统施工综述 ilib.cn 8. Excavation and support of tailrace tunnel under complicated geological condition 复杂地质条件下尾水隧洞的开挖与支护 ilib.cn 9. Numerical investigation of layout patterns of hydropower station tailrace system 水电站尾水系统布置方式的数值研究 service.ilib.cn 10. Stability Analysis of Hydraulic and Governor System at Multi-unit Sharing One Tailrace Tunnel Hydropower Plant 多机一洞水电站水力-调速系统的稳定分析 service.ilib.cn 1. Design characteristics of hydraulic hoist for the tailrace emergency gate of Tianhuangping Pumped-storage Power Plant 天荒坪抽水蓄能电站尾水事故闸门液压启闭机设计 www.ilib.cn 2. Hydrodynamic characteristics of changing top-altitude tailrace tunnelfor Three Gorges Project's underground power plant 三峡地下电站变顶高尾水洞水动力特性 www.ilib.cn 3. Construction of Long Tailrace Tunnel Bifurcation Concrete Structure for Dachaoshan Hydropower Station 大朝山水电站长尾水隧洞岔管混凝土施工 www.ilib.cn 4. The Temporary Tailrace Plugging Design on the Riverbed Power Station of Shapotou Water Control Project 黄河沙坡头水利枢纽工程河床电站尾水临时封堵设计 ilib.cn 5. Stability Analysis of Hydropower Station With Inclined Ceiling Tailrace 变顶高尾水洞水电站机组运行稳定性研究 www.ilib.cn 6. Tongzihao Navigation and Hydropower Project Intake and Tailrace Gates Installation Schedule Control 桐子壕航电工程进水口及尾水闸门门叶安装的进度控制 www.ilib.cn 7. Numerical Analysis of Excavation Process for Tailrace Tunnels of Pengshui Project 彭水电站尾水洞施工开挖过程数值分析 www.ilib.cn 8. Design and Construction of Tailrace Tunnel of Powerhouse in Jiangya Hydropower Station 江垭水电站地下厂房尾水隧洞设计与施工 www.ilib.cn 9. Study on the configuration of hydropower station tailrace tunnel with sloping ceiling 水电站变顶高尾水洞体型研究 www.ilib.cn 10. The application of damping type surge tank with air hole in hydropower station having long tailrace tunnel 制气式调压室在带有长尾水隧洞的水电站中的应用 www.ilib.cn 1. Analysis on tailrace system with varying crown elevation at TGP's right bank underground power station 三峡右岸地下电站变顶高尾水系统分析研究 www.ilib.cn 2. Optimization Design of Tailrace Surge Chamber Concrete Lining Layers for Dachaoshan Hydropower Station 大朝山水电站尾水调压室混凝土衬砌分层优化设计 www.ilib.cn 3. Theoretical Research on Water Flow Movement of Transient Process Caused by Small Fluctuation With Inclined Roof Tailrace Structure 变顶高尾水系统小波动过渡过程中水流运动理论研究 scholar.ilib.cn 4. Finite element analysis of stress of tailrace tunnel for Xiluodu Hydropower Station 溪洛渡水电站尾水洞结构应力有限元分析 scholar.ilib.cn 5. Manufacture Techniques for Tailrace Gate of Powerhouse at Three Gorges Project 三峡工程厂房尾水闸门制造技术 ilib.cn 6. Design of Number Selection of Tailrace Surge Tanks for Intake System of the Huizhou Pump Storage Plant 惠州抽水蓄能电站引水系统尾水调压井个数选择设计 www.ilib.cn 7. Quality Control of Tailrace Tunnel Concrete Construction of Dachaoshan Hydropower Station 大朝山水电站尾水隧洞混凝土施工质量控制 www.ilib.cn 8. Stability Analysis and Research of Transient Process Caused by Small Fluctuation in Inclined Ceiling Tailrace Structure 变顶高尾水系统小波动过渡过程稳定性分析研究 www.ilib.cn 9. Guangzhou Pump Storage Station I Tailrace Branch Pipe Hydraulic Model Testing 广蓄一期工程尾水岔管水力学模型试验研究 scholar.ilib.cn 10. Several Methods of Combined Solution for Water Hammer in Draft Tube and Surge in Tailrace Chamber 尾水管水击与尾水调压室涌波联合求解的几种方法 www.ilib.cn 1. Construction quality control in the excavation and support of tailrace tunnel of Dachaoshan Hydropower Station 大朝山水电站尾水隧洞开挖支护施工质量控制 scholar.ilib.cn 2. Test and study on the blasting removal of the cofferdam in the tailrace mouth of Dachaoshan Hydropower Station 大朝山水电站尾水出口围堰爆破拆除测试研究 www.ilib.cn 3. Stable sectional area of tailrace surge tank on complicated tailrace system 复杂尾水系统的尾水调压室稳定断面推求 service.ilib.cn 4. Design of varied roof height tailrace tunnel of Pengshui hydropower station 彭水地下电站变顶高尾水隧洞设计 www.ilib.cn 5. Concrete lining technology for tailrace tunnel of TGP power source station 三峡电源电站尾水隧洞衬砌混凝土施工技术 service.ilib.cn 6. Management on excavating silt at the tailrace tunnel in Taipingwan hydropower station 太平湾水电站尾水渠清淤工程管理及效益分析 www.ilib.cn 7. Excavation of the Outlet Slope of the Tailrace Tunnel of the Nuozhadu Hydropower Project 糯扎渡电站尾水隧洞出口边坡开挖施工 service.ilib.cn 8. Technical Summary on Tailrace Tunnel Excavation at Pubugou Hydropower Station 瀑布沟水电站尾水隧洞开挖技术总结 www.ilib.cn 9. Earthquake response and stability of high slope in tailrace tunnel exit of Pubugou hydropower station 瀑布沟水电站尾水隧洞出口高边坡地震作用效应及稳定性 service.ilib.cn 10. Testing System for Model of Hydropower Station with Inclined Ceiling Tailrace Based on Virtual Instruments 基于虚拟仪器技术的变顶高尾水洞大型水电站模型试验系统 ilib.cn 1. Combined Solution of Water Hammer Pressures and Surge Waves in Tailrace System of Hydropower Station 水电站尾水管水击与尾水调压室涌波联合计算 service.ilib.cn 2. Renovation of tailrace of new power house in Jingbohu hydropower station 镜泊湖水电站新厂房尾水渠改造 www.ilib.cn 3. Effect of tailrace surge tank location on adjustment and assurance 调压室位置对调保参数的影响 www.ilib.cn 4. Performance of tailrace surge chamber shared by two units 双机共尾水调压室系统的调节品质分析 www.ilib.cn 5. A example of tailrace excavation for increasing the output 尾水渠开挖提高机组出力的实例 service.ilib.cn 6. Experimental study on dredging in tailrace of Xin'anjiang hydropower station 新安江水电站尾水河道清淤试验与研究 www.ilib.cn 7. Tailrace Repair Project at Gongzui Hydropower Station 龚嘴水电站尾水整治工程 www.ilib.cn 8. Excavation and Support Construction of No. 1 Tailrace Tunnel for Dachaoshan Hydropower Station 1号尾水隧洞开挖支护施工 www.ilib.cn 9. Test study on transitional process of No. 3 Tailrace water system of Longtan hydropower station 龙滩水电站3号尾水系统过渡过程试验研究 service.ilib.cn 10. Comparison of small fluctuation stability between two kinds of tailrace layout of hydropower station under extremely low head 水电站中两种尾水布置型式在超低水头下的小波动稳定性比较 www.ilib.cn 1. Design of Blasting for Removing No. 1 And No. 2 Rock Benches at Exit of Tailrace Tunnel of Dachaoshan Hydropower Station 大朝山尾水洞出口1号、2号岩埂拆除爆破方案设计 www.ilib.cn 2. Air Entering Design for Pubugou Underground Machine Hall by Use of Free-flow Tailrace Tunnel 瀑布沟地下厂房利用无压尾水洞引风的设计 service.ilib.cn |
随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。