单词 | tgp | ||||||||||
释义 | tgp
更多释义 收起释义 例句释义: 白芍总甙,帕夫林 1. The paper has analyzed the dynamometer monitoring result of high slope anchor cable of TGP double-line five-grade ship lock. 本文对三峡工程双线五级船闸高边坡锚索测力计监测资料进行了分析。 www.dictall.com 2. The flood control benefit of the TGP is the greatest contribution to the improvement of the eco-environment in the middle and lower reaches. 三峡工程的防洪效益是它对长江中下游生态环境得以改善的最大贡献。 www.ceps.com.tw 3. This paper researches the reasons of TGP s banquette slumping during river closure by the Catastrophe theory and Self organized criticality. 从突变理论及自组织临界性理论,对三峡大江截流戗堤坍塌机理进行研究。 www.dictall.com 4. The TGP is scheduled to expire at the end of this year, leaving solar projects high and dry. TGP预计今年年底就到期了,届时太阳能发电项目将再次陷入无助的困境。 www.fortunechina.com 5. Objective To observe the effect of total glucosides of paeony (TGP) combined with methotrexate (MTX) on rheumatoid arthritis (RA). 目的观察白芍总甙(TGP)联合甲氨蝶呤(MTX)治疗类风湿关节炎(RA)的疗效。 www.dictall.com 6. With water extraction and gel filtration purification, a kind of polysaccharide protein conjugate, TGP(Tea Glycoprotein), was prepared. 用水提取茶叶并采用凝胶纯化,从茶叶中分离得到一种多糖蛋白复合物TGP。 www.chemyq.com 7. It took nearly 100 years from conception, demonstration, design, construction and operation to final completion of TGP. 三峡工程从构想、论证、设计、建设至竣工全面投入运行历时近百年。 www.enginsci.cn 8. The unsteady changes of seepage field of slope of TGP ship lock under raining and percolation are analyzed by saturated seepage model. 采用饱和渗流模型,对降雨入渗条件下三峡船闸边坡渗流场的非稳态变化情况进行了分析。 www.rockmech.org 9. We observed the sheet-like processes typical morphology of DCs stimulated by TGP. 树突状细胞经TGP诱导刺激后的树突状细胞形态越发典型; www.fabiao.net 10. By using the sonic wave and the seismic wave, the foundation rock holding layer on-spot testing of TGP has been performed. 应用声波及地震波对三峡工程坝基建基岩体持力层进行现场检测。 www.dictall.com 1. It is proved that one year ahead of the original schedule for the third-stage engineering construction of TGP is feasible. 最后结果表明,三峡三期工程施工提前一年是可行的。 www.ceps.com.tw 2. Research on properties of wet-ground fine cement slurry used for foundation grouting of TGP under high pressure 三峡工程基础灌浆高压下湿磨细水泥浆材的性能研究 www.ilib.cn 3. Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station 三峡工程水电站压力管道和蜗壳技术结构型式的选择及论证 www.ilib.cn 4. Prototype observation on navigation hydraulics in diversion channel of TGP during construction period and its verification on model 三峡导流明渠施工通航原型观测与模型验证 www.ilib.cn 5. Hydraulic calculation for TGP second stage cofferdam construction during flood period and its actual verification 三峡工程二期围堰截流度汛期的水力学计算 service.ilib.cn 6. Analysis on river bed evolution of dam area from the main river closure to open diversion channel closure of TGP 三峡工程大江及明渠截流期间坝区河演分析 www.ilib.cn 7. Research on installing a soft cushion layer for placing concrete surrounding the spiral case of TGP powerplant 三峡电站蜗壳敷设软垫层浇筑外围混凝土研究 www.ilib.cn 8. Concrete construction technology for spiral case of TGP power source station's main powerhouse 三峡电源电站主厂房蜗壳混凝土施工技术 ilib.com.cn 9. Optimization study on the length of upstream floating guide wall of TGP's shiplift 三峡升船机上游浮式导航堤长度优化研究 www.ilib.cn 10. Reversion analysis of anti-shearing strength parameters of a landslide in TGP reservoir area 三峡库区某滑坡抗剪强度参数的反演分析 www.ilib.cn 1. Influence of TGP impoundment on flowing time of the Yangtze river to the estuary 三峡水库蓄水对长江进入河口流量时间的影响 www.ilib.cn 2. Seepage prevention wall constructed with high pressure jetting for stage I separation levee and its cofferdam at TGP 三峡船闸下游隔流堤及施工围堰高喷防渗施工 www.ilib.cn 3. Research on water temperature variation of TGP reservoir before and after impoundment and its influence 三峡水库蓄水前后下泄水温变化及其影响研究 www.ilib.cn 4. Threat on Bank of Hanjiang River due to the Impounding Water of TGP and Its Countermeasures 三峡水库蓄水对汉江堤防安全的威胁及防御对策 ilib.com.cn 5. The research of the navigation and diversion in TGP channel and its numerical simulation 三峡工程明渠导流通航及数值实验研究概述 www.ilib.cn 6. Construction equipment allocation for high intensity backfilling construction of upstream separation levee of TGP 三峡上游隔流堤高强度填筑施工设备配置 www.ilib.cn 7. 10 Years of supervision on TGP construction of the Yangtze river 长江三峡工程建设监理的10年实践 www.ilib.cn 8. Preliminary analysis of uncertainty in quantitative precipitation forecast of TGP reservoir interval area 三峡水库区间定量降水预报不确定性初探 service.ilib.cn 9. Significant Decision for Constructing TGP--Review of Three-Generation Leaders of the CPC Showed Concern for Constructing TGP 三峡工程建设的重大决策--党的三代领导人关怀三峡工程建设的回顾 www.ilib.cn 10. Preliminary analysis on supervision data of foundation deformation of TGP Shiplift during construction period 三峡工程升船机施工期基础变形监测初步分析 ilib.cn 1. Three-dimensional Nonlinear Finite-Element Analysis on Directly Embedded Spiral Case Model of TGP Hydroelectric Power Plant 三峡电站直埋式蜗壳结构试验模型的非线性有限元分析 www.ilib.cn 2. On establishment of hydrologic and meteorological information network station of open diversion channel closure of TGP 三峡工程明渠截流水文气象信息网站建设 www.ilib.cn 3. Analysis on additional deformation of longitudinal joint of flood release monoliths of TGP dan due to grouting 三峡泄洪坝段纵缝灌浆后增开变形分析研究 www.ilib.cn 4. Experimental study on navigable condition in and outside the inlet zone of approach channel for TGP temporary shiplock 三峡临时船闸引航道外河段通航条件试验研究 www.ilib.cn 5. Key-Technologies Tackling on High Slope of TGP Permanent Lock and Its Effect in Design Optimization 三峡工程永久船闸高边坡的科技攻关及其在布置方案优化中的成效 www.ilib.cn 6. Preliminary analysis of resettlement supervision information management of TGP 浅析三峡工程移民监理信息管理 www.ilib.cn 7. Flood control situation in middle and lower area of the Yangtze river after TGP completion and countermeasures 三峡工程建成后长江中下游防洪形势及对策 www.ilib.cn 8. Research on flow-induced vibration and its control for radial gate of TGP diversion bottom outlets 三峡导流底孔弧形闸门泄洪振动与控制研究 www.ilib.cn 9. Design of second stage concrete placement facilities with controlled pressure and temperature for TGP power station's spiral case 三峡电站保温保压浇蜗壳二期混凝土装置设计 www.ilib.cn 10. Design of a conceptual model for TGP upstream approaching channel 三峡枢纽上游引航道概化模型试验装置设计 scholar.ilib.cn 1. Viscoelastic numerical simulation and stability evaluation on excavation process of underground power station of TGP 三峡工程地下电站开挖的粘弹性数值模拟及稳定性评价 www.ilib.cn 2. Several considerations about resettlement and economic development in TGP reservoir area 关于三峡库区移民安置与经济发展的几点思考 www.ilib.cn 3. Construction Techniques for Protecting Flood-discharged Low-level Opening from Cavitation Erosion in TGP 三峡工程泄洪深孔防空蚀设计的施工技术 www.ilib.cn 4. Non-steady flow prototype observation and analysis between TGP dam and Gezhouba dam during peak regulation test of TGP power station 三峡电站调峰试验两坝间非恒定流原型观测分析 www.ilib.cn 5. Analysis and evaluation on stability of a landslide in TGP's reservoir area 三峡库区某滑坡的稳定性分析与评价 www.ilib.cn 6. The quality control of prestressed anchor-cable construction in high slopes of the Permanent Lock for TGP 三峡永久船闸高边坡预应力锚索施工质量控制 www.ilib.cn 7. Risk Analysis and Countermeasures for Construction of the Second-stage Surface Works of Permanent Navigation Lock of TGP 三峡永久船闸二期地面工程施工风险分析与对策 www.ilib.cn 8. The fire-prevention design for miter gates of the TGP's permanent shiplock 三峡工程永久船闸人字门防火设计 www.ilib.cn 9. Type selection of water drainage network behind TGP's permanent shiplock wall and its construction 三峡永久船闸墙后排水管网选型与施工 ilib.cn 10. Land protection and utilization planning and economic evaluation method for drawdown zone of TGP reservoir 三峡水库消落区土地防护利用规划及其评价 www.ilib.cn 1. Mechanical steel bar connection technique and its application to TGP 钢筋机械连接技术及其在三峡工程中的应用 www.ilib.cn 2. Hydrologic and meteorological prediction practice for open diversion channel closure of TGP 长江三峡明渠截流期长期水文气象预报实践 www.ilib.cn 3. Construction Technique Improvement of Concrete Surface Treatment for Spillway Dam Section of TGP 三峡工程泄洪坝段混凝土表面处理施工技术改进 service.ilib.cn 4. Scouring and silting variation in middle and lower channel of the Yangtze river after TGP operation 三峡工程运用后长江中下游冲淤变化 www.ilib.cn 5. Research on diversion and navigation in open channel of TGP and its operation effect 三峡工程明渠导流及其通航研究与运行效果 vip5.activeclub.net 6. On construction technology of upstream floating-concrete-ship embankment of TGP's permanent shiplock 三峡永久船闸上游浮式导航堤施工技术 www.ilib.cn 7. Emergency system development for suddenly -happened water pollution event in TGP reservoir area 三峡水库突发性水污染事件应急系统的开发 service.ilib.cn 8. Quality control for foundation consolidation grouting without concrete covering at right bank dam of TGP 三峡右岸大坝基础无盖重固结灌浆质量控制 www.ilib.cn 9. Concrete construction temperature control for water discharge culvert of TGP's shiplock in summer season 三峡船闸泄水箱涵夏季混凝土施工温度控制 service.ilib.cn 10. Improving Person's Quality Is the Key to Carrying out the Exploiting Strategy of TGP Resettlement 提升人的素质:实施三峡开发性移民战略的关键 service.ilib.cn 1. Operation Practice and Dispatching Schemes of TGP during Cofferdam Generation Period 三峡水利枢纽围堰发电期调度与运行实践初探 service.ilib.cn 2. Influence of peak regulation of TGP Hydropower station during flood period on navigation conditions 三峡电站汛期调峰对通航影响的研究 service.ilib.cn 3. Consideration on countermeasures of returning farmlands to forest in Chonqing reservoir area of TGP 重庆三峡库区退耕还林对策思考 scholar.ilib.cn 4. Research on reversion model for stability analysis of Heping square landslide of Wanxian city in TGP reservoir area 三峡万州和平广场滑坡区稳定性分析模型研究 www.ilib.cn 5. Analysis on deformation increment of the longitudinal joint after grouting in TGP 三峡大坝纵缝灌浆后增开变形分析 www.ilib.cn 6. On double-frequency-channel water depth measurement technology in open diversion channel closure of TGP 三峡工程导流明渠截流中双频水深测量技术 www.ilib.cn 7. Out-flowing water temperature control of cooling water plant for concrete construction of TGP's flushing sluice 三峡冲沙闸混凝土施工冷水机组出水温度控制 www.ilib.cn 8. Real time prediction and analysis on hydrologic and hydraulic factors of open diversion channel closure of TGP 三峡工程明渠截流水文水力要素实时预测分析 www.ilib.cn 9. Analysis on monitored results and stability evaluation on high excavated slope of TGP's permanent shiplock 三峡永久船闸高边坡监测成果及稳定性分析 www.ilib.cn 10. Discussion on current velocity prediction method at the closure gap of open diversion channel of TGP 三峡截流龙口流速预报方法探讨 www.ilib.cn 1. Research on engineering geology of artificial slope reinforcement of Wu-shan New County-city in TGP's reservoir area 三峡库区巫山新县城人工边坡加固工程地质研究 www.ilib.cn 2. Application of controlled blasting technology in removal of concrete cut-off wall at TGP's upstream cofferdam 控制爆破在三峡上游围堰防渗墙拆除中的应用 www.ilib.cn 3. Optimization of Treatments of Main Technical Problems of TGP's Main River Closure and Second Phase Cofferdams 大江截流及二期围堰主要技术问题优化决策 www.ilib.cn 4. Preliminary discussion on construction claim indemnity for Stage II works of TGP's permanent shiplock 浅谈三峡永久船闸二期工程的施工索赔 ilib.cn 5. Deformation monitoring design and result analysis on high excavated slope of TGP's permanent shiplock 三峡永久船闸高边坡变形监测设计及成果分析 www.ilib.cn 6. Research on county-seat relocation in TGP reservoir area and engineering mode of ecological restoring 三峡库区县城迁建水保生态工程模式探讨 www.ilib.cn 7. Analysis on sand transportation law in Chongqing backwater fluctuating zone of TGP reservoir 三峡水库变动回水区重庆河段走沙规律初探 www.ilib.cn 8. Application of Magnetic Separation Technology to Artificial Sand Production of TGP 磁选分离技术在三峡工程人工砂生产中的应用 www.ilib.cn 9. Research on high pressure composite grouting technology for the faults of TGP and practice 三峡工程断层高压复合灌浆技术的研究与应用 www.ilib.cn 10. Hydraulic experiment on navigation in diversion channel of TGP and engineering practice 三峡导流明渠施工通航模型试验研究与工程实践 service.ilib.cn 1. The Composite Modulation of "Water-Governance by Institution" : A Reflection on the Water Governance in TGP Reservoir Area “制度治水”的复合模式——兼对三峡库区水资源治理的思考 scholar.ilib.cn 2. Study on operational mode of TGP lock and navigation conditions during cofferdam retaining water 三峡永久船闸围堰期运行方式及其通航条件研究 service.ilib.cn 3. Influence of removal mode of second-stage cofferdam on TGP's third-stage river closure and retaining generation 三峡工程二期围堰拆除方式与三期截流关系研究 service.ilib.cn 4. Earth-rock backfilling construction of upstream separation levee of TGP and quality control 三峡工程上游隔流堤土石方填筑与质量控制 www.ilib.cn 5. Blasting removal for anchorage block foundation behind penstock of TGP power source station 三峡电源电站引水钢管坝后镇墩基础拆除爆破 www.ilib.cn 6. Hydrologic information and network technology of open diversion channel closure of TGP 三峡工程明渠截流水文信息网络技术 www.ilib.cn 7. Operation stability prediction of TGP power station's turbines and prevention measures 三峡电站水轮机运行稳定性预测及预防措施 www.ilib.cn 8. Elastic-brittle-plastic Theory and Numerical Simulation of Excavation for Permanent Lock of TGP 弹脆塑性理论与三峡工程船闸开挖数值模拟 www.ilib.cn 9. Landslide features and stability analysis of horizontally bedded rock mass in the TGP reservoir area 三峡库区水平层状岩体滑坡特征及稳定性分析 www.ilib.cn 10. The agricultural non- point pollution in the TGP reservoir area and control countermeasures 三峡库区农业面源污染现状及控制对策研究 www.ilib.cn 1. Analysis on the variation of hydrologic and hydraulic factors of open diversion channel closure of TGP 三峡工程明渠截流水文水力学计算分析 www.ilib.cn 2. Cascade Dispatching Schemes of TGP during Cofferdam Power Generation Period 三峡工程围堰挡水发电期梯级调度方式研究 www.ilib.cn 3. Research on navigation conditions downstream TGP during its flood-discharge 三峡工程泄洪对下游通航条件影响的研究 service.ilib.cn 4. Navigation Conditions in Upstream Approach Channel of TGP in Initial Operation Period 三峡工程运行初期上游引航道通航水流条件研究 www.ilib.cn 5. Summarization on construction survey technique of TGP shiplock's ground surface works 三峡船闸地面工程施工测量技术综述 scholar.ilib.cn 6. Influence of TGP's flood control regulation on sedimentation of the reservoir 三峡工程防洪调度对水库泥沙淤积影响初探 www.ilib.cn 7. On problems of agriculture development and countermeasures in TGP reservoir area 浅论三峡库区农业发展的问题及对策 www.ilib.cn 8. Design on special hydrology database for open diversion channel closure of TGP and realization 三峡工程明渠截流水文专用数据库设计与实现 www.ilib.cn 9. Analysis on tailrace system with varying crown elevation at TGP's right bank underground power station 三峡右岸地下电站变顶高尾水系统分析研究 www.ilib.cn 10. Structural Characters of Bidirectional Portal Hoist on Crest of Flood Discharge Dam Section of TGP 三峡泄洪坝段坝顶双向门机设计特征 www.ilib.cn 1. Deformation monitoring and analysis of rock mass behind vertical slope at TGP's permanent shiplock 三峡永久船闸直立坡岩体变形监测与变形分析 168.160.184.82:8080 2. Preliminary analysis of co-operation of pumped storage power station with TGP and Gezhouba project 蓄能电站与三峡及葛洲坝水电站捆绑运行初探 www.ilib.cn 3. Technological and structural characteristics of hydraulic turbines for TGP left bank powerstation 三峡左岸电站水轮机的技术特性及结构特点 www.ilib.cn 4. Design of impact prevention installation for the miter gate of TGP's permanent shiplock 三峡水利枢纽永久船闸人字门防撞装置设计 www.ilib.cn 5. Supervision for concrete construction with tied form at top opening of flood releasing dam section of TGP 三峡工程泄洪坝段表孔拉模施工监理 www.ilib.cn 6. Application of neural network theory in prediction of earthquake induced by TGP reservoir 神经网络在三峡水库诱发地震预测中的应用 www.ilib.cn 7. Spatial elastoplastic analysis of reinforcing outlets in flood release dam section of TGP 三峡泄洪坝段孔口配筋方案空间弹塑性分析 www.ilib.cn 8. Study on Navigation Hydraulics of TGP in its Construction Period; 三峡工程施工通航水力学研究; www.crsri.cn 9. Deformation monitoring on asphalt concrete core wall of TGP's protection dam for Maoping brook valley 三峡茅坪溪防护坝沥青混凝土心墙变形监测 www.ilib.cn 10. Quality control for steel fiber concrete construction of main plant house of TGP power source station 三峡电源电站主厂房喷钢纤维混凝土质量控制 service.ilib.cn 1. Analysis of influence factors on deformation of high slope and central pier of TGP permanent shiplock 三峡船闸高边坡及中隔墩变形影响因素分析 scholar.ilib.cn 2. Consideration on risk evaluation of TGP resettlement investment 关于三峡工程移民投资风险评价的思考 www.ilib.cn 3. Automatic water-stage recording and reporting system in open diversion channel closure of TGP 三峡工程明渠截流中的水位自动测报系统 www.ilib.cn 4. Design on hydrologic monitoring system for open diversion channel closure of TGP and practice 三峡工程明渠截流水文监测系统设计与实践 www.ilib.cn 5. Treatment to Leakage through Longitudinal Joints of Chamber Slab of Permanent Shiplock of TGP 三峡永久船闸闸室底板结构纵缝渗漏处理 www.ilib.cn 6. Type selection and main structural characteristics of TGP's hydrogenerator 三峡电站水轮发电机型式选择和主要结构特点 www.ilib.cn 7. Model pursuit, forecast and construction practice on TGP's diversion channel closure 三峡工程导流明渠截流模型试验跟踪预报及实施 www.ilib.cn 8. Construction technology for deep channel section of upstream separation levee of TGP 三峡上游隔流堤深槽段施工技术 www.ilib.cn 9. Hydraulics prototype observation in water-pumping debugging period for TGP lock 三峡永久船闸抽水调试期水力学原型观测 www.ilib.cn 10. TGP design and construction progress and its prospect 三峡工程设计及施工进展与展望 ilib.cn 1. Application of GPS in hydrologic monitoring during open diversion channel closure of TGP 明渠截流水文监测中的全球定位测验系统 www.ilib.cn 2. Blocking treatment technology for secondary grout feeding pipe of end-anchor cable of TGP's shiplock 三峡船闸端头锚索二次进浆管堵塞处理研究 service.ilib.cn 3. Distortion monitoring on intake of underground power station at the right bank in TGP 三峡工程右岸地下电站进水口施工期变形监测及特征 www.ilib.cn 4. Optimization of Structural Hierarchy of TGP Safety Monitoring System 三峡工程安全监测系统结构层次优化研究 www.yrsri.cn 5. Design on hydrologic measurement ship for open diversion channel closure of TGP and practice 三峡工程明渠截流水文测验测船设计与实践 www.ilib.cn 6. Experiment Study on the Influence of TGP Regulate Peak Flood to the Navigational Condition Between Two Dams 三峡电站汛期调峰对两坝间通航条件影响试验 www.ilib.cn 7. Analysis on backfilling stability of high side slope at deep channel section of separation levee of TGP 三峡上游隔流堤深槽段高边坡填筑稳定分析 www.ilib.cn 8. Analysis of concrete temperature control effectiveness of TGP's five-stage shiplock 三峡五级船闸混凝土温度控制措施效果分析 www.ilib.cn 9. Study on the key technology and engineering measures for earlier closure of TGP's diversion channel 三峡工程导流明渠提前截流关键技术及措施研究 service.ilib.cn 10. Grouting treatment for transverse joint seepage of TGP temporary shiplock 三峡工程临时船闸坝体横缝渗漏灌浆处理 ilib.com.cn 1. Hydraulic design of TGP's temporary shiplock reconstruction to flushing sluice 三峡临时船闸改建冲沙闸水力设计 www.ilib.cn 2. The problems in TGP reservoir resettlement and countermeasures 三峡水库移民过程中的问题及解决办法 www.ilib.cn 3. Influence of concrete surface crack on the durability of TGP's shiplock and countermeasures 三峡船闸表面裂缝对耐久性的影响及防裂措施 www.ilib.cn 4. Analysis on seepage monitoring result in TGP's ship lock and its high slope 三峡工程双线五级船闸及其高边坡渗流监测成果分析 www.ilib.cn 5. New techniques and result analysis on construction of TGP's cofferdam safety monitoring 三峡二期围堰安全监测施工新技术及成果分析 www.ilib.cn 6. Analysis of separation levee of upstream navigation channel of TGP's temporary shiplock 三峡临时船闸上游航道隔流堤填筑沉降分析 www.ilib.cn 7. Application with adaptable neuronal network into deformation monitoring ofpermanent lock of TGP 自适应神经网络在三峡永久船闸变形监控中的应用 service.ilib.cn 8. Some technical challenges for TGP construction diversion 三峡工程施工导流中的几个技术问题 www.ilib.cn 9. Rock mass deformation analysis of high excavated slope of TGP's shiplift and temporary shiplock 三峡升船机及临时船闸高边坡岩体变形分析 ilib.cn 10. Research on pre-alarm system for suddenly occurred pollution accident in TGP reservoir area 三峡库区突发污染事故预警预报系统研究 www.ilib.cn 1. Hydraulic system debug and failure treatment of TGP's permanent shiplock's hoisting machine 三峡永久船闸启闭机液压系统调试及故障处理 www.ilib.cn 2. Study on Design and Construction Opportunity of Right Bank Underground Power Station of TGP 三峡右岸地下电站设计与兴建时机的研究 www.ilib.cn 3. Blasting excavation technology for deep chamber trench of TGP's permanent shiplock 三峡永久船闸深槽爆破开挖技术 www.ilib.cn 4. The clinical efficacy and safety of TGP treatment in juvenile idiopathic arthritis 白芍总苷胶囊治疗儿童特发性关节炎的临床有效性和安全性观察 www.ilib.cn 5. Hydraulics Study on Arrangement and Scheme Comparison of Diversion Outlets for TGP 三峡工程导流底孔布置及方案比较水力学研究 www.crsri.cn 6. River closure construction technology of TGP open diversion channel 三峡导流明渠截流施工技术 www.ilib.cn 7. Application of REBAR Mechanical Splicing Technique to Spillway Section at TGP 钢筋机械连接技术在三峡工程泄洪坝段中的应用 service.ilib.cn 8. Practice and Experimental Verification of TGP's Permanent Shiplock Slope 三峡永久船闸高边坡工程的实践及验证 www.ilib.cn 9. Contrastive analysis on monitoring and computation for scroll case and concrete in TGP 三峡工程厂房机组蜗壳及混凝土监测与计算对比分析 www.ilib.cn 10. On shaping blasting-excavation technology of vertical wall of TGP's permanent shiplock 三峡永久船闸直立墙成型开挖爆破技术 www.ilib.cn 1. Study on thermal stress control for left guide-wall dam section of TGP by numerical simulation method 三峡左导墙坝段温控问题的仿真计算研究 www.ilib.cn 2. ROV in underwater clearing work for the emergency gate of diversion bottom holes in TGP 水下机器人在三峡水利枢纽导流底孔封堵检修门水下清理工程中的应用 www.ilib.cn 3. Analysis on monitoring results of locked anchor-bar stress at TGP permanent lock's vertical slope 三峡永久船闸直立坡锁口锚杆应力监测分析 service.ilib.cn 4. Curtain grouting test for replacing seepage prevention wall of Stage I soil-rock cofferdam of TGP 三峡工程一期土石围堰以幕代墙灌浆试验 ilib.cn 5. Quality control on geologic defect treatment and dam foundation excavation of TGP 三峡大坝基础开挖及地质缺陷处理质量监控 www.ilib.cn 6. Application and research on chemical grouting treatment of interface joint in TGP 三峡工程混凝土层面缝化学灌浆应用研究 www.ilib.cn 7. On green environment construction for relocated cities in TGP reservoir area 为三峡库区迁建城市营造绿色空间环境 www.ilib.cn 8. Summary on deformation monitoring design of TGP's permanent shiplock project 三峡永久船闸工程变形监测设计综述 www.ilib.cn 9. Preliminary analysis of dry density of silted material in TGP reservoir in initial period 三峡水库淤积物初期干容重试验初步分析 www.ilib.cn 10. On hydrologic monitoring in closure gap area during open diversion channel closure of TGP 三峡工程明渠截流口门区水文监测 www.ilib.cn 1. Study on Hydraulic calculation of Diversion Channel Closure Work of TGP 三峡工程导流明渠截流水力学的计算研究 service.ilib.cn 2. Analysis of and proposals for impact of TGP on water quality in reservoir area after impoundment 三峡工程蓄水对库区水质的影响分析与建议 www.ilib.cn 3. Analysis of cavitation-resistant measures for work gate of water delivery gallery of TGP's permanent shiplock 三峡永久船闸输水廊道工作门防空化措施分析 www.ilib.cn 4. The application of vibrating-hole jet grouting technology on the construction of TGP 振孔高喷灌浆在三峡工程中的应用 www.ilib.cn 5. Research on construction technology of prestressed back tie-rod of TGP shiplock's miter gate 三峡船闸人字门背拉杆预应力施工工艺研究 www.ilib.cn 6. On short term rainfall prediction practice for open diversion channel closure of TGP 三峡明渠截流期短期降雨预报实践 www.ilib.cn 7. Monitoring on Outer Deformation of Separation Levee at Lower Approach Channel of TGP 三峡工程下游引航道施工期隔流堤外部变形监测 www.ilib.cn 8. Hydrologic prediction practice for closure gap area of open diversion channel of TGP 三峡工程明渠截流龙口水文预报实践 www.ilib.cn 9. Analysis on hydraulic characteristics in gate zone of diversion bottom outlet of TGP 三峡工程导流底孔闸门区水力特性研究 www.ilib.cn 10. Hydrologic risk analysis on diversion open channel closure of TGP in advance of schedule 三峡工程三期明渠提前截流水文风险分析 service.ilib.cn 1. Experimental study on creep behaviors of hard structural pla ne in TGP's permanent lock regions 三峡船闸区硬性结构面蠕变特性试验研究 www.ilib.cn 2. Safety measures against explosive shock for TGP right bank excavation works 三峡右岸场地开挖工程爆破振动安全控制 www.ilib.cn 3. Application of penstock blasting method for relieving welding stress in TGP 三峡压力钢管爆炸法消除焊缝应力的应用 ilib.cn 4. Research on Navigation Condition in Lock Downstream Approach Channel of TGP 三峡船闸下游引航道通航条件研究 www.crsri.cn 5. Treatment technology for ground concrete defect of TGP's permanent shiplock 三峡永久船闸地面混凝土缺陷处理技术 www.ilib.cn 6. Hydrologic monitoring event record of open diversion channel closure of TGP 长江三峡工程明渠截流水文监测工作记事 service.ilib.cn 7. Rock drilling equipment selection for TGP's shiplock construction 三峡船闸凿岩设备的选配 www.ilib.cn 8. On Quality Inspection and Reparation of TGP Shiplock Concrete Building 三峡船闸混凝土建筑物质量检查与缺陷处理 jhe.ches.org.cn 9. Application of computer network technology in automation water regulation system of TGP 网络技术在三峡水调自动化系统设计中的应用 www.ilib.cn 10. Research on navigation conditions in upstream approach channel of TGP Ship lift 三峡工程升船机上航道通航水流条件研究 www.ilib.cn 1. Supervision document archiving management of TGP 三峡工程监理文件归档管理 www.ilib.cn 2. Application of electric wave current metre in open diversion channel closure of TGP 电波流速仪在明渠截流水文监测中的应用 www.ilib.cn 3. Comprehensive analysis of the upper structure of TGP'sleft bank power house and the design of its net-framed roof 三峡左岸电站厂房结构整体分析与网架设计 service.ilib.cn 4. Probe into problem of pouring concrete of the base restraint area of TGP spillway in summer 高温季节浇筑三峡泄洪坝段混凝土问题的探讨 www.ilib.cn 5. Concrete lining technology for tailrace tunnel of TGP power source station 三峡电源电站尾水隧洞衬砌混凝土施工技术 service.ilib.cn 6. Optimization design of penstocks for TGP hydropower station 三峡水电站压力管道优化设计 www.ilib.cn 7. Selection of preheated temperature for TGP penstock welding 三峡工程左岸电站引水压力钢管焊接预热温度的选择 www.ilib.cn 8. On supervision organization design and management of TGP and practice 三峡工程监理组织设计和管理的探索与实践 www.ilib.cn 9. Structural design of concentrated control unit for TGP's flood releasing gates 三峡泄洪闸集中控制单元结构设计 www.ilib.cn 10. Water quality monitoring and analysis in open diversion channel closure of TGP 三峡工程明渠截流水质监测及分析 www.ilib.cn 1. Research on impact of downstream river channel scouring of TGP on bank revetment works 三峡工程下游河床冲刷对护岸工程的影响 service.ilib.cn 2. On meanings and role of hydrologic propaganda of open diversion channel closure of TGP 明渠截流水文宣传的意义和作用 service.ilib.cn 3. On effect of TGP reservoir on Yangtze flood control in the light of 1998 flood 从1998年洪水看三峡水库的防洪作用 www.ilib.cn 4. Loading and unloading technology design for bulk cargo wharf in TGP reservoir area 三峡工程库区散货码头装卸工艺设计 ilib.cn 5. Protective effect of TGP on complete cerebral ischemia reperfusion injury in rats 白芍总苷对全脑缺血再灌损伤的保护作用 www.ilib.cn 6. Concrete placement temperature control on TGP's flood release dam section 三峡工程泄洪坝段夏季混凝土浇筑温度控制 www.ilib.cn 7. Research on plan of reservoir impounding in advance of TGP and implementation 三峡工程提前蓄水方案的研究与实施 www.ilib.cn 8. Anti-seepage treatment on structural joints in the fourth lock chamber northern in TGP 三峡永久船闸北线四闸室结构缝防渗处理 www.ilib.cn 9. Monitoring on seepage for TGP's left power plant building (non-spillway) monolith 三峡工程大坝左厂(非)坝段渗流监测 ilib.cn 10. Concrete temperature control of the mixing system for TGP 三峡工程拌和系统混凝土温控 www.ilib.cn 1. On corrosion resistance of coating material for TGP metal structures 三峡工程金属结构涂装材料耐蚀性能研究 www.ilib.cn 2. Workmanship of penstock expansion joint for TGP left bank powerhouse 三峡水利枢纽压力钢管伸缩节制造工艺简介 www.ilib.cn 3. Analysis on monitoring of TGP's ship-lift during foundation construction 三峡工程升船机基础施工期监测初步分析 ilib.cn 4. Study on sediment accumulation of temporary lock approach channel of TGP 三峡工程二期临时船闸引航道泥沙淤积研究 www.ilib.cn 5. Influence of boundary condition on downstream river bed evolution of TGP 边界条件对三峡坝下游河床演变影响 www.ilib.cn 6. Establishment of urban survey control network for new cities in TGP's reservoir area 长江三峡工程库区新城城市控制网的建立 www.ilib.cn 7. Study on Blasting Excavation Technique of Chamfers of Penstocks of TGP's Hydro Plant 三峡工程钢管槽爆破开挖技术研究 www.crsri.cn 8. Analysis and prediction on diversion ratio of bottom diversion outlet of TGP dam 导流底孔分流比的分析和预报 www.ilib.cn 9. Application of epoxide material in mending of diversion bottom outlet at TGP dam 环氧材料在三峡大坝导流底孔修补中的应用 www.ilib.cn 10. Joint grouting for RCC dam section shared with longitudinal cofferdam at TGP 三峡纵向围堰碾压混凝土坝身段接缝灌浆 www.ilib.cn 1. Application of Flexible Chute to Construction of Sand-flushing Sluice of TGP 软管溜筒在三峡冲沙闸施工中的应用 service.ilib.cn 2. General design on safety monitoring decision support system for TGP 长江三峡水利枢纽建筑物安全监测决策支持系统总体设计 ilib.cn 3. Application of oblique elements to design of TGP turbine-generators 斜元件在三峡水轮发电机设计中的应用 service.ilib.cn 4. Excavation Loosened Zone and Mechanical Behaviors of Rock Mass of Lock's High Slope of TGP 三峡工程船闸高边坡岩体松动区及其性状 www.yrsri.cn 5. Several issues on the stability of high excavated slope of TGP's permanent shiplock 三峡永久船闸高边坡稳定性几个问题的分析 scholar.ilib.cn 6. Brief Introduction to Key Technical Problems of TGP in Main Channel Closure and Second Phase Cofferdam Work 大江截流及二期围堰施工关键技术问题简介 www.crsri.cn 7. Characters and Stability Analysis of Yanguoshaba Landslide Group in TGP Reservoir Region 三峡工程库区淹锅沙坝滑坡体特征及稳定性分析 www.ilib.cn 8. Hydrometeorological forecast for TGP's main river closure 三峡工程大江截流水文气象预报 www.ilib.cn 9. Treatment study to floating debris for TGP during construction 三峡工程施工期漂污物治理研究 service.ilib.cn 10. Investigation on floating debris of TGP and treatment measures 三峡工程漂浮物调查及治理措施 ilib.com.cn 1. Investigation into Tendency of River Erosion Downstream of TGP 三峡水库下游河床冲刷趋势探讨 www.yrsri.cn 2. Early stage deformation system of Xicheng landslide of Yunyang county seat in TGP reservoir area 长江三峡库区云阳县西城滑坡前期变形系统 www.ilib.cn 3. Application of alloy steel rock cage in river closure of TGP open diversion channel 合金钢网石兜在三峡导流明渠截流中的应用 www.ilib.cn 4. In-situ straining test of anchor bolt for apex pintle of miter gate at TGP's permanent shiplock 三峡船闸人字门顶枢锚杆张拉现场试验研究 www.ilib.cn 5. Productive trial research on plugging of diversion bottom outlet of TGP 三峡工程导流底孔封堵生产性试验研究 www.ilib.cn 6. Application of acoustic system in open diversion channel closure of TGP 声纳系统在三峡工程明渠截流中的应用 www.ilib.cn 7. Thermal crack treatment of lining concrete for TGP Permanent Ship Locks 三峡工程永久船闸输水系统衬砌混凝土温度裂缝处理 www.ilib.cn 8. Hydraulic indexes and options of river closure on open diversion channel at TGP 三峡工程明渠截流水力学指标及截流方式分析 www.ilib.cn 9. The Clinical Study on Curative Effect and Safety of TGP in Rheumatoid Arthritis 白芍总苷胶囊治疗类风湿关节炎疗效和安全性的临床研究 www.ilib.cn 10. Optimization on instrument arrangement of safety monitoring system of TGP 三峡工程安全监测系统仪器布置优化研究 www.ilib.cn 1. Installation technology of VGS generator rotor's magnet yoke of TGP's left power plant 三峡左岸电站VGS发电机转子磁轭安装工艺 www.ilib.cn 2. Monitoring and Research of Prestressed Anchoring on Rock Slopes of TGP Lock 三峡船闸岩质边坡预应力锚固监测及机理研究 www.ilib.cn 3. Boundary composition of river bed at upstream stretch of TGP reservoir tail 三峡库尾上游河段河床边界组成 www.ilib.cn 4. Floating box construction of upstream floating guide wall of TGP's shiplock 三峡船闸上游浮式导航堤浮箱施工 www.ilib.cn 5. Experimental Study on Stiffness Characteristics of Rockmass Structural Face in TGP 三峡工程岩体结构面刚度特性试验 www.crsri.cn 6. Research on time-variable forecast model with multiple factors for rock mass deformation of TGP's high sideslope 船闸高边坡岩体形变多因素时变预测模型研究 www.ilib.cn 7. Talks on supervisory information management for TGP 三峡工程监理信息管理浅谈 www.ilib.cn 8. Size Effect Analysis on Macro-Mechanicsal Parameters for the Rock Masses of Shiplock Slope of TGP 三峡工程永久船闸边坡岩体宏观力学参数的尺寸效应研究 www.ilib.cn 9. Overall design of secondary electric system for TGP power station on left bank 三峡左岸电站电气二次系统总体设计研究 www.ilib.cn 10. Design characteristics of power supply system for TGP power plant and dam area 三峡电站厂用电及坝区供电系统设计特点 ilib.cn 1. Study on nondestructive detection for concrete quality of TGP 某面板堆石坝混凝土质量无损检测技术研究 service.ilib.cn 2. Analysis on hydraulic factors of open diversion channel closure of TGP 三峡工程明渠截流水力要素变化分析 www.ilib.cn 3. Environmental impact of city and town relocation in TGP reservoir area 三峡工程库区城镇迁建环境影响初步分析 www.ilib.cn 4. Analysis on monitoring results of anchoring in the excavated slope for TGP's ship lock 三峡双线五级船闸开挖边坡锚固监测成果分析 www.ilib.cn 5. Thermal stress emulational calculation on blockage body of bottom outlet of spillway dam section for TGP 三峡大坝导流底孔封堵温度应力仿真计算分析 vip5.activeclub.net 6. Application of new technology of rock mechanics test in TGP 岩体力学试验新技术在三峡工程中的应用 www.ilib.cn 7. Slough control and safe advance of closure dike of TGP open diversion channel 三峡导流明渠截流过程中塌滑控制与安全进占 www.ilib.cn 8. Monitoring analysis on the seepage at curtain zone in permanent ship lock of TGP 三峡工程永久船闸帷幕区渗流监测分析 www.ilib.cn 9. Evaluation on city and town relocation planning in TGP reservoir area 三峡库区集镇迁建规划评介 ilib.cn 10. The role of policies and regulations in reservoir resettlement of TGP 政策法规对三峡库区移民安置的作用 www.ilib.cn |
||||||||||
随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。