单词 | three gorges project |
释义 | 例句释义: 三峡工程,三峡大坝,三峡水利枢纽工程,难忘三峡 1. Compared to that, this water diversion project did not do as comprehensive a preliminary study as the Three Gorges project did. 相比之下,这项调水工程却没有进行三峡项目那么全面的前期研究。 www.bing.com 2. Three gorges project has been a boon for large ship commerce. But it may sink a way of life that stretches back 4000 years. 三峡工程对于大船航运是一大福音,但却可能让一种4000年来的生活方式消失。 blog.sina.com.cn 3. The Yangtze River Three Gorges Project hinges far-reaching, Resettlement is one of the considerable difficulty of systematic works. 长江三峡水利枢钮工程影响深远,库区移民安置是其中难度相当大的系统性工程。 lib.cqvip.com 4. the same year, the domestic construction machinery industry, its products loader was the first "Three Gorges" project using the building. 同年,在国内工程机械行业中,其装载机产品率先被“三峡”建设工程采用。 yp.0595stw.com 5. Upon completion of the Three Gorges project, the sewage will back up in the reservoir. 大坝建成后,这些污水将回流至水库中。 www.bing.com 6. Three Gorges Project is the inevitable result of lacking transparency in policies and media. 三峡工程上马是政策不透明,媒体不开放的必然产物。 www.chinadialogue.net 7. Three Gorges Project is those ordinary things moving, pure water and electricity were the bonds of friendship, it is hard to forget. 是三峡工程建设中那些平凡感人的事情,水电人纯洁深厚的友谊,使人难以忘怀。 wenwen.soso.com 8. Application of the numerical laboratory in river closure and diversion engineering of Three Gorges Project is introduced. 介绍了三峡工程导截流水流特性数值实验室的模拟技术及其应用情况。 dictsearch.appspot.com 9. Pu Haiqing, Director of State Three Gorges Project Construction Committee Executive Office, interviewed executives from Seagram . 国家三峡工程建设委员会办公室主任蒲海清会见施格兰公司高层人员。 www.bing.com 10. The dam builders imply that the Three Gorges Project must be built to alleviate China s energy crisis. 水坝工程师暗示,三峡工程必须上马,以缓解中国的能源危机。 www.bing.com 1. The water surface floating debris have affected Three Gorges Project operation since storage. 三峡工程蓄水后已受水面漂浮物影响。 airiti.com 2. Three Gorges Project has completed its preliminary stage successfully . 三峡工程首期已顺利完成。 www.bing.com 3. Article 9A residents-resettlement plan shall be compiled for the residents relocation for the Three Gorges Project construction. 第九条三峡工程建设移民安置,应当编制移民安置规划。 www.lawyee.com 4. With the completion of the Three Gorges project, its reservoir will bring ocean going ships to the quays of Chongqing. 随着三峡过程的竣工,水库将使远洋船舶直接达到重庆码头。 dictsearch.appspot.com 5. It is of most importance for normal operation of the Three Gorges project to prevent reservoir bank collapse systematically. 水库塌岸(岸坡再造)是影响三峡水库移民工程安全的重大地质灾害问题。 dictsearch.appspot.com 6. Three Gorges air port will greatly promote Three Gorges Project and develop the local economy . 三峡机场将大大推动三峡工程,发展当地经济。 www.bing.com 7. In addition, the construction of Three Gorges Project has attracted a growing number of foreign tourists. 此外,三峡工程的兴建,吸引了越来越多的中外游客。 zhidao.baidu.com 8. The three gorges project, is China's Yangtze river upstream of the construction of water conservancy projects for large projects. 三峡工程,是中国长江上游段建设的大型水利工程项目。 zhidao.baidu.com 9. Large quantities of investments and manpower were called for in the construction of the Three Gorges project. 在三峡项目的建设中需要大量的投资和劳动力。 www.4en.cn 10. The Three Gorges Project can radically solve the flood threats of the middle and lower reaches of the Yangtze River. 三峡工程可以从根本上解除长江中下游的水患威胁。 www.hwjyw.com 1. With the Three Gorges Project water to extend the use of the time, river erosion will further increase the scope and magnitude. 3随着三峡工程蓄水运用时间的延长,河道冲刷范围和幅度将进一步增大。 goabroad.zhishi.sohu.com 2. at present , the 14 hydro turbine generator units of the left power station of the three gorges project are being manufactured or installed. 目前,三峡左岸电站14台水轮发电机组已进入制造和安装阶段。 www.ichacha.net 3. In this paper the treatment of domestic refuse of Three Gorges project was studied. 本文对三峡工程生活垃圾的处理进行了研究。 www.chemyq.com 4. The stress and strain of a directly-embedded spiral case in the Three Gorges Project was analyzed by using 3-D nonlinear FEM. 本文结合三峡水电站,采用三维非线性有限元法对右岸某机组段直埋式蜗壳结构的受力和变形特性进行分析。 www.dictall.com 5. The three gorges project on the Yangtze river hydrological adjustment, may influence on their habitat. 三峡工程对长江水文情势的调节,会可能对其栖息地产生影响。 wenwen.soso.com 6. Has been working on the Three Gorges Project Corporation and the Commissioner of the Ministry of experts spoke highly of. 得到了合作单位与三峡工程公司监理部专家的高度评价。 tietai.net 7. The construction of the Three Gorges Project entails large migration. 三峡工程建设需要大批移民。 www.hxen.com 8. Study on Hydraulic Characteristics of Release Works at the Three Gorges Project. 三峡枢纽泄水建筑物水力学特性研究。 service.ilib.cn 9. In 1984, the State Council decided the development resettlement policy should be implemented in the reservoir area of Three Gorges Project. 1984年,国务院决定三峡工程水库移民实行开发性移民方针。 www.ilib.cn 10. Three gorges hydropower station, the three gorges project, and say, the three gorges dam. 2三峡水电站,又称三峡工程、三峡大坝。 blog.sina.com.cn 1. Three Gorges project is the largest hydraulic project in the world today. 三峡工程是当今世界上最大的水利枢纽。 www.ceps.com.tw 2. The asphalt concrete core of Maopingxi dam for the Three Gorges Project adopted vibration roller abroad. 三峡茅坪溪防护坝沥青混凝土心墙采用国外振动碾碾压。 www.magsci.net 3. works play an important role in the construction of The Three Gorges Project. 工人在三峡工程中发挥了重要的作用。 www.360abc.com 4. in chapter 5 , the estimate of structure vibration in three gorges project is given. 第五章对三峡水电站厂房振动问题作了分析预测。 www.ichacha.net 5. This method will have a bright future in the stability analysis of the high slope of the Three Gorges Project of the Yangtze River. 相信在三峡高边坡岩体稳定分析中将具有很好的应用前景。 www.magsci.org 6. The Three Gorges project has been dogged by skeptics, even within China's bureaucracy, since it was approved in 1992. 自从1992年被批准以来,质疑就和三峡工程如影随形,有些甚至来自于中国官方内部。 www.bing.com 7. Construction of main pier is affected by the third-stage of Three Gorges project. 主墩施工受到三峡工程三期蓄水影响。 www.shigongjishu.cn 8. The Three Gorges Project was announced at the conference. 在这次会议上宣告了三峡工程。 resource.ahedu.cn 9. There should be no question that the Chinese people have the ability to successfully complete the Three Gorges Project. 可以肯定地说,中国人民有能力完成三峡工程。 www.24en.com 10. Launched in 1993, the construction of the Three Gorges Project is scheduled for completion in 2009. 三峡工程1993年动工,预计于2009年竣工。 www.360abc.com 1. CTGU has made outstanding contributions to the construction of the Three Gorges Project and the development of Qingjiang River. 学校在三峡工程、清江流域开发工程等建设中做出了突出贡献。 blog.sina.com.cn 2. The risks of the Three Gorges Project operation under the present and the future climate scenarios are thus assessed. 初步分析了长江三峡工程建成后在当前气候背景和可能未来气候情景下的运行风险。 epub.cnki.net 3. All these achievements have been applied in the projects such as the Three Gorges Project and have gained good effectiveness. 研究成果已通过国家科技部的鉴定,并在三峡大坝等工程中得到了应用,取得了良好的效果。 www.ilib.cn 4. Have you the Great Three Gorges Project? 你听说过宏伟的的三峡工程吗? dictsearch.appspot.com 5. The Three Gorges Project construction initiated the biggest immigrant the affected area broadest throughout our country history. 三峡工程建设引发了我国有史以来动迁规模最大、涉及面最广的水库移民。 www.qk114.net 6. Mr. Green, our government has invited tenders for the three Gorges Project . Would you like to take part in it? 我国政府欢迎参加三峡工程的投标,你方想参加吗? blog.hjenglish.com 7. brief description of the luffing cable - crane used for the construction of yangtze three gorges project 三峡工程施工用摆塔式缆索起重机简介 www.ichacha.net 8. The key problems of construction technology for the surface works of Three Gorges Project ship lock 三峡船闸地面工程施工关键技术问题 www.ilib.cn 9. Monitoring Manufacture and Acceptance of Insulator Used in Three Gorges Project and Nationwide Interconnection Project 三峡工程及全国联网工程用绝缘子的监造和验收 ilib.cn 10. Check and analysis of high-strength anchorage rod of the ship-lock of Three Gorges Project 三峡船闸高强锚杆检测与分析 www.ilib.cn 1. Construction blasting vibration monitoring for the main part of the second stage of the dual-way five-step ship lock at Three Gorges Project 三峡工程双线五级船闸二期工程主体段施工爆破振动监测 ilib.cn 2. China Three Gorges Project Corporation Innovates upon the Management Pattern of Engineering Construction 三峡总公司创新工程建设管理模式 www.ilib.cn 3. Practice of the first generating units to be put into generation in the left-bank power plant of Three Gorges Project 三峡左岸电站首批机组投产实践 www.ilib.cn 4. Chemistry Grouting Technique of Curtain Grouting Construction in Three Gorges Project and Its Effect Analysis 三峡大坝基础帷幕化学灌浆技术及其效果分析 www.ilib.cn 5. Construction of powerhouse prestressed anchorage cable and its quality control or left-bank plant of Three Gorges project 三峡大坝右岸电站厂房预应力锚索施工与质量控制 www.ilib.cn 6. Summarization on scientific research on Three Gorges Project of the Yangtze river by Changjiang Scientific Research Institute 长江科学院三峡工程科研工作综述 www.ilib.cn 7. Study on concrete construction and temperature control in Three Gorges Project and its results application 三峡工程混凝土施工及温控科研成果 www.ilib.cn 8. The selection of joint shape of the last annular weld of the steel-penstocks of Three Gorges Project 三峡工程压力钢管下平段凑合节合拢缝选型试验 www.ilib.cn 9. Principle and Application of Data Exchange Between Reservoir Dispatching Automation System and Monitoring System in Three Gorges Project 三峡梯调水调系统与监控系统数据交换原理与实现 www.ilib.cn 10. Stepping deformation monitoring instrument applied to Three Gorges Project 用于三峡工程的步进式变形监测仪器 www.wanfangdata.com.cn 1. Some Technical Problems of Excitation Rectifier Transformers of Hydroelectric Generator of Left Shore Power Station in Three Gorges Project 三峡工程左岸电站水轮发电机励磁整流变压器的几个技术问题 www.ilib.cn 2. Design Points and Application Case of Small Town Sewage Treatment Plant in the Reservoir Area of the Three Gorges Project 三峡库区小城镇污水处理厂的设计 ilib.cn 3. Optimized operation scheme for deposition reduction and enhancement flood control capacity of Three Gorges Project reservoir 三峡水库减淤增容调度方式研究——多汛限水位调度方案 www.ilib.cn 4. The application of moderate heat expansive cement in concrete used in second phase of Three Gorges Project 微膨胀型中热水泥在三峡二阶段工程混凝土中的应用 service.ilib.cn 5. Application of vibro-hydraulic consolidation technology to second-stage cofferdam construction in Three Gorges Project 振动水冲法加密技术在三峡工程二期围堰中的应用 www.ilib.cn 6. Geological Investigation of Three Gorges Project and Control of Geological Hazards in Its Reservoir Area 三峡工程的地质勘察研究与地质灾害防治 ilib.cn 7. The Optimization of the Second Stage Concrete Construction Scheme for the Spiral Case in Powerhouse on the Left Bank of Three Gorges Project 三峡工程左岸厂房蜗壳二期混凝土施工方案优化 www.ilib.cn 8. Present State of Farmland Resources and Sustainable Use in Reservoir Area of Three Gorges Project 三峡电站库区耕地资源现状及可持续利用刍议 www.ilib.cn 9. Exploration into the Classified Management of Supervising Engineers for the Three Gorges Project by the Committee on the Yangtze River 长江委三峡工程监理工程师的分级管理探索 scholar.ilib.cn 10. Safety monitoring analysis of the second contracting section engineering for the second stage of Three Gorges Project ship lock 三峡船闸二期二标段安全监测工程浅析 www.ilib.cn 1. Analysis of the results of dam deformation monitoring of Three Gorges Project during its initial impoundment period 三峡工程初期蓄水大坝变形监测成果分析 ilib.cn 2. Study on the Bottom Diversion Outlets of the Three Gorges Project 三峡水利枢纽导流底孔研究 www.ilib.cn 3. Determination of Optimum Ending Time of Water Circulation for Later Cooling of Dam in Three Gorges Project 三峡工程大坝后期冷却通水最佳结束时机研究 www.ilib.cn 4. Tentative study on drifting property of drifters and its solving measures in dam area of Three Gorges Project 三峡工程坝区漂污运移规律及治理措施初步研究 www.ilib.cn 5. Design on Excavation and Support of underground Works for the Conveyance System in Permanent Shiplock of Three Gorges Project 三峡永久船闸输水系统的地下工程开挖及支护设计 ilib.cn 6. Control and treatment of high side slopes of towns due to relocation of immigrants from Three Gorges Project reservoir area 三峡库区移民迁建城镇高边坡防治与建议 ilib.cn 7. The comprehensive technical measure on defense AAR of the concrete of the main Three Gorges project 三峡主体工程混凝土预防碱集料反应的综合技术措施 ilib.cn 8. Study on the Anisotropic Unloading Rock Mass Mechanics for the Steep-High Rock Slope of Three Gorges Project Permanent Shiplock 三峡工程永久船闸陡高边坡各向异性卸荷岩体力学研揪 www.ilib.cn 9. Coupling dynamic problems of the ship-lift for the Three-Gorges Project 三峡升船机提升过程中的耦合动力学问题 lx.dlut.edu.cn 10. Research of Fuzzy Reliability Integration Analysis in Three Gorges Project Giant Concrete Construction System 三峡工程特大型混凝土施工系统模糊可靠性集成分析研究 www.ilib.cn 1. Poverty Risk of Resettlement and Economy Rebuild-A Case Study of Resettlement of the Three Gorges Project 三峡移民贫困化风险和经济重建分析 scholar.ilib.cn 2. Grouting Way and Effect Analysis of the Joint Grouting for Special Area in Phase III Dam Construction of Three Gorges Project 三峡工程三期坝体接缝灌浆特殊灌区灌浆方法及效果分析 www.ilib.cn 3. Several innovations of technology in anchor engineering construction of permanent lock, Three Gorges Project 三峡永久船闸锚固工程施工中几个创新的技术问题 www.ilib.cn 4. Experimental research of blasting demolition of concrete cut-off wall in second-stage downstream cofferdam of Three Gorges Project 三峡二期下游围堰混凝土防渗墙拆除爆破试验研究 scholar.ilib.cn 5. Analysis of the anomaly noise of the reel coupling of overhead gantry crane in the Three Gorges Project and its repair technology 三峡船闸桥机卷筒联轴器异响分析及修复 www.ilib.cn 6. Dynamic Monitoring and GIS System Development for Soil and Water Conservation in Three Gorges Project Reservoir Area of Yangtze River 长江三峡工程库区水土保持遥感动态监测及GIS系统开发 www.ilib.cn 7. Chemical Grouting for Cracks and Structural Joints in Dam Body Section of Concrete Longitudinal Cofferdam of Three Gorges Project 三峡工程混凝土纵向围堰坝身段裂缝及结构缝化学灌浆 www.ilib.cn 8. Environmental Protection Countermeasures for Sustainable Development of Three Gorges Project Reservoir Area 三峡库区可持续发展的环境保护对策 ilib.cn 9. Property Analysis for Measured Seepage Through Spillway Section of Three Gorges Project During Initial Water Storage 三峡工程泄洪坝段蓄水初期实测渗流性态分析 service.ilib.cn 10. Numerical simulation of sedimentation deposition in access channel of temporal shiplock in Three Gorges Project 三峡工程临时引航道泥沙淤积数值模拟 jhe.ches.org.cn 1. On Comprehensive Harnessing Cheng-Han Reach of The Yangtze River after Completion of Three Gorges Project 论三峡工程建成后长江城汉河段的综合整治 scholar.ilib.cn 2. Construction of the light structure for the first lock chamber of Three Gorges Project ship lock 三峡船闸北一闸室轻型结构施工 service.ilib.cn 3. Decision support system for river closure and its application to Three Gorges Project 截流决策支持系统及其在三峡工程中的应用 service.ilib.cn 4. Investigation into the Stress-Strain Characteristics of Weathered Sand in Three Gorges Project 三峡风化砂的应力应变特性研究 service.ilib.cn 5. Experimental study on dissolvable alkali in granite aggregates and total alkali content in concrete of Three Gorges Project 三峡工程花岗岩骨料的溶出碱及混凝土总碱量试验研究 jhe.ches.org.cn 6. Preliminary research on key technologies and problems of using domestic turbine governors for Three Gorges Project 三峡电站水轮机调速器的关键技术及国产化问题初探 ilib.cn 7. Control of influence of blasting vibration on fresh concrete during excavation of right dam foundation at Three Gorges Project 三峡右岸坝基开挖爆破对临近新浇混凝土影响的控制 ilib.cn 8. Design and Implementation of a Computer-aided Planning System for the Three Gorges Project 三峡工程两坝联合调度辅助决策系统的研究与实施 www.ilib.cn 9. Improvement of Navigation in Fluctuating Backwater Area during Construction of Three Gorges Project 三峡工程施工期变动回水区航道整治 www.ilib.cn 10. Dispatching Operation Schemes of Three Gorges Project During Cofferdam Generating Period 三峡水库围堰发电期调度运行方式研究 www.ilib.cn 1. Ground Penetrating Radar Applications For Three Gorges Project During Construction 地质雷达在三峡工程施工应用研究 www.ilib.cn 2. Study on the benefit compensation of combined optimum dispatching of Three Gorges Project and Qingjiang Power Station 三峡、清江梯级电站联合优化调度效益补偿研究 www.ilib.cn 3. Strategic research of flood hazard mitigation of Dongting Lake on the background of Three Gorges Project construction 三峡工程建设背景下的洞庭湖区治水方略探讨 www.ilib.cn 4. Application of Special Rigid Blast-hole-plugging Materials in the Blasting Demolition of RCC Cofferdam in Three Gorges Project 专用刚性炮孔堵材在三峡RCC围堰爆破中的应用 www.ilib.cn 5. Impervious Technique of High-pressure Gunite Applied to Three Gorges Project 高压喷射灌浆防渗技术在三峡工程中的应用 www.ilib.cn 6. Development of hydraulics numerical laboratory and its application to Three Gorges Project 三峡船闸水力学数值实验室的研制及应用 ilib.cn 7. Calculation of Ecological Supply Footprint and Ecological Demand Footprint in Three Gorges Project 三峡工程生态供给足迹与生态需求足迹计算 www.ilib.cn 8. Application of Prestressing Anchorage Cable to Permanent Ship Lock Construction of Three Gorges Project 预应力锚索在三峡永久船闸施工中的应用 www.ilib.cn 9. Three-dimensional Analysis of Saturated-unsaturated Seepage of Three Gorges Project Permanent Ship Lock 三峡永久船闸高边坡三维饱和--非饱和渗流场分析 www.ilib.cn 10. Cases Study of Field Tests of Hydraulic Units in Left Bank of Three Gorges Project 三峡左岸电站机组现场试验研究 www.excitation.com.cn 1. Summa on hydropower station inlet configuration optimizing test research for Three Gorges Project 三峡电站进水口体形优化试验研究综述 www.ilib.cn 2. Study on Safety Monitoring Database Management System During Construction of Three Gorges Project 三峡工程施工期安全监测数据库管理系统研究 www.crsri.cn 3. Temperature control study on lining concrete of conveyance tunnel of permanent shiplock at Three Gorges Project 三峡永久船闸输水洞衬砌混凝土的温控研究 www.ilib.cn 4. Design and experimental verification of gantry crane girder for flood discharge section of Three Gorges project 三峡水利枢纽工程泄洪坝段门机大梁设计与试验验证 www.ilib.cn 5. Modular Design for Meteorological Application Software Systems in Three-Gorges Project 三峡工程气象应用软件各系统间的模块化设计方法 www.ilib.cn 6. Preparation of electroplated diamond core bit and its application in drilling overturned hole in the Three-Gorges project 三峡永久船闸导垂孔施工用电镀金刚石钻头的研制 service.ilib.cn 7. Discussions on the judgment methods of the failure of high-tension power line in the site of Three Gorges Project 三峡工地高压供电线路故障判断方法的探讨 www.ilib.cn 8. Three Gorges Project Construction Accelerated the Yangtze River Navigation 三峡工程建设促进长江航运可持续发展 www.ilib.cn 9. Technical improvement of concrete construction for surface outlets for Three Gorges Project 三峡工程表孔混凝土施工技术改进 service.ilib.cn 10. Intelligent Analysis of Deformation Behaviors of Permanent Shiplock of Three Gorges Project 三峡工程永久船闸三闸首区开挖变形特征的智能分挝 www.ilib.cn 1. Manufacturing and quality controlling of penstock expansion joints for Three Gorges Project 三峡工程压力钢管伸缩节制造及质量控制 www.ilib.cn 2. office of the State Council three gorges project construction committee 国务院三峡工程建设委员会办公室 blog.sina.com.cn 3. An optimized operation scheme for reducing deposition and enhancing flood control capacity of the Three Gorges Project Reservoir 三峡水库减淤增容调度方式研究——双汛限水位调度方案 www.ilib.cn 4. Some Problems in Social Integration of Three Gorges Project Induced Resettlers and Residents in Coastal Host Areas 三峡外迁移民与沿海安置区社会整合的难点探析 ilib.cn 5. Construction Measures of Curtain Grouting under Right Barrage Block of Permanent Ship Lock of Three Gorges Project 三峡永久船闸右挡水坝段帷幕灌浆施工措施 service.ilib.cn 6. Sensitivity Analysis of Rock Mechanical Parameters in Permanent Shiplock of Three Gorges Project 三峡工程永久船闸高边坡岩体力学参数的敏感度分析 service.ilib.cn 7. Study of pre-stressed anchorage cable of ship lift in Three Gorges Project 三峡升船机结构预应力锚索试验研究 www.ilib.cn 8. Exploration and Consideration of Equipment Monitoring System for Three Gorges Project 三峡工程设备监理制的控探索与思考 service.ilib.cn 9. Study on unloading and relaxation characteristics of the rockmass of permanent shiplock high rock slope of three gorges project 三峡工程永久船闸高边坡岩体卸荷松弛特征研究 scholar.ilib.cn 10. Selective design of the distribution substation for Three Gorges Project ship lock 三峡船闸施工供电配电所选配设计 www.ilib.cn 1. Microstructure of Granite in Three Gorges Project Area and Dislocation Characteristic of Quartz 三峡工程坝区花岗岩微结构和石英位错特征 www.ilib.cn 2. Three Gorges Project Construction Commission of the State Council 国务院三峡工程建设委员会 www.zftrans.com 3. Summarization on Main technical issues in Three Gorges Project design of the Yangtze river 长江三峡水利枢纽工程设计重大技术问题综述 service.ilib.cn 4. Hydrodynamic characteristics of changing top-altitude tailrace tunnelfor Three Gorges Project's underground power plant 三峡地下电站变顶高尾水洞水动力特性 www.ilib.cn 5. Scientific Research in Three Gorges Project and Application of Research Achievements 三峡工程主要科研成果及应用 www.ilib.cn 6. On Social Amalgamation and Social Stabilization of Three Gorges Project Resettlement 论三峡工程移民的社会融合与社会稳定 www.ilib.cn 7. Seepage treatment of and analysis on structural joints in the ground project of the Permanent Ship Lock for the Three Gorges Project 三峡永久船闸地面工程结构缝渗漏处理分析 www.ilib.cn 8. Examination on Design and Installation of Flexible Connector of Penstock in the Power Plant of Three Gorges Project 三峡工程水电站压力管道伸缩节设置论证 www.ilib.cn 9. Computation of vibration in powerhouse of Three Gorges Project and prototype verification 三峡电站厂房结构振动计算与试验研究 jhe.ches.org.cn 10. Characteristics of Mechanical Part Installation in Generating Units at Left Bank Hydropower Plant of the Three-Gorges Project 三峡左岸电厂发电机组机械部件的安装特点 www.ilib.cn 1. Application of polygon control survey in reconstructing the temporary ship lock of Three Gorges Project 导线控制测量在三峡临时船闸改建工程中的应用 ilib.cn 2. Possible potential impact of Three gorges Project on population health in Kaixian County of Chongqing Wang Yang 三峡工程对开县人群健康可能发生的潜在影响的预测评估 www.zglckf.com 3. Optimization of limited water level in flood season and impounding scheme for reservoir in Three Gorges Project 三峡水库动态汛限水位与蓄水时机选定的优化设计 jhe.ches.org.cn 4. Dynamic response analysis of start-up operation for unit regulation of left bank power station of Three-Gorges Project 三峡工程左岸电站机组调试动力响应分析 www.ilib.cn 5. Personnel understanding of the stage acceptance of Three Gorges Project 三峡水利枢纽工程阶段验收工作体会 www.ilib.cn 6. Research on Variations of Typical Lower Jingjiang River Reach after Three Gorges Project Operation 三峡水库运用后荆江典型河段冲淤变化计算分析 service.ilib.cn 7. Application of Hydraulic Hoisting Technique in the Construction of Shiplock of Three Gorges Project 液压提升技术在三峡船闸完建工程中的运用 ilib.cn 8. Review on Three Gorges Project and Its Ecological Environment 三峡工程的历史回顾与生态环境 www.ilib.cn 9. Technical innovation in second-phase cofferdam construction of Three Gorges Project 三峡工程二期围堰建设中的科技创新 service.ilib.cn 10. Application of Electromagnetic Method in Power Transmission of Three Gorges Project 电磁方法在三峡输电工程中的应用 www.ilib.cn 1. Massive shrinking-compensating-concrete of Three Gorges Project temporary ship lock 三峡临时船闸大体积补偿收缩混凝土的研究 ilib.cn 2. Ouyang Jinhui China Three Gorges Project Corporation Penalty FEM Analysis of Hydropower House 欧阳金惠,张超然,孙志禹中国长江三峡工程开发总公司水电站厂房罚有限元分析 www.icold-cigb.org.cn 3. Welding and quality control high strength steel Three Gorges project water diversion penstock 三峡引水压力钢管高强钢的焊接及质量控制 www.ilib.cn 4. Application of Separate One-side Slip Forms in a Permanent Lock of Three Gorges Project 单侧分离式滑模在三峡工程主永久船闸中的应用 service.ilib.cn 5. Research on Precautions against Earthquakes in Three Gorges Project is highly Successful 三峡工程的地震灾害防御研究是卓有成效的 www.ilib.cn 6. Re-understanding of several problems of the construction of Three Gorges Project 对三峡工程建设几个问题的再认识 www.ilib.cn 7. Navigation Management during Locks Blockage and Break Period in Construction Process of Three Gorges Project 三峡工程碍断航期的通航管理 service.ilib.cn 8. Fatigue Test Analysis for Super-Large Bellow Pipe Used in Pressure Pipe for The Three Gorges Project 三峡水利枢纽工程压力管道用超大型波纹管疲劳试验分析 www.ilib.cn 9. Multimedia Demonstration System for Safety Monitoring of Three Gorges Project 三峡工程安全监测多媒体演示系统 www.crsri.cn 10. Application of the External Prestressing Technique in the Permanent Ship Lock Steel Access Trestle Works of the Three Gorges Project 体外预应力技术在三峡永久船闸钢栈桥中的应用 www.ilib.cn 1. Numerical Simulation of Deformation of Permanent Shiplock High Rock Slope of Three Gorges Project 三峡工程永久船闸高边坡变形数值仿真分析 www.ilib.cn 2. Open Channel Diversion's Test Study and Prototype Operation Investigation of Three Gorges Project 长江三峡明渠导流的试验研究与原型运行调查 service.ilib.cn 3. Temperature Control Measures for High-Grade Concrete at Desilting Steel Pipes in Three Gorges Project 三峡工程排沙钢管高标号混凝土温控防范措施 www.wanfangdata.com.cn 4. Controlled Blasting excavation technique of permanent lock of Three Gorges Project 三峡永久船闸开挖控制爆破技术 ilib.cn 5. Discussion on Pre-stressed Rock Strands for the Permanent Shiplock in Three Gorges Project 三峡永久船闸预应力锚索几个问题的探讨 www.ilib.cn 6. Water and Soil Conservation in Yangtze River Valley and Three Gorges Project 长江流域水土保持与三峡工程 service.ilib.cn 7. Permanent Navigation Lock Chamber Side Wall to Side Wall Support Slide Lift Formwork at Three Gorges Project 三峡工程永久船闸闸室边墙对撑式滑升模板施工 www.ilib.cn 8. Cascade dispatching operation modes of the Three Gorges Project during cofferdam power generation period 三峡水利枢纽围堰发电期梯级调度运行方式 scholar.ilib.cn 9. Present Situation of Water Pollution in Reservoir Area of Three Gorges Project and Protection Countermeasures 三峡工程库区水质污染现状及保护对策 ilib.cn 10. The review to investigation of construction method in open diversion channel of Three Gorges Project 对三峡导流明渠进口段开挖方案研究的回顾与反思 www.ilib.cn 1. Design and realization of document database of Three Gorges Project sediment information system 三峡工程泥沙信息系统文档数据库的设计与实现 www.ilib.cn 2. Geohazards and their prevention in resettlement areas of emigrants from the reservoir region of the Three Gorges project 三峡工程库区移民迁建区地质灾害与防治 ilib.cn 3. Breakthrough in Construction Technology of Cofferdam of Three Gorges Project 三峡工程围堰施工技术问题的突破 service.ilib.cn 4. An Analysis of Water Quality From the Yangtse River as Drinking Water Source During the Second Period Water Storing in Three Gorges Project 三峡工程二期蓄水过程中生活饮用水水源水质 www.wanfangdata.com.cn 5. Construction of impervious wall for second stage upstream cofferdam of Three Gorges Project 三峡二期上游围堰防渗墙施工 scholar.ilib.cn 6. The leakage treatment technology of structural joints in the permanent ship lock for Three Gorges Project 三峡永久船闸结构缝渗漏处理技术 service.ilib.cn 7. Concrete pouring and temperature controlling measures for Three Gorges Project in the summer 三峡工程夏季混凝土浇筑温控措施 ilib.cn 8. Selection and calculation of neutral-point earthing ways of the power generator of left-bank power station in the Three Gorges Project 三峡左岸电站发电机中性点接地方式的选型与计算 www.ilib.cn 9. Deformation Analysis for the Permanent Shiplock of Three Gorges Project 三峡永久船闸建筑物变形特性分析 ilib.cn 10. Calculation and approval of the price variance of Three Gorges Project 三峡枢纽工程的价差计算和审批 www.ilib.cn 1. Research on alkali reactivity of artificial granite aggregate for Three Gorges Project 三峡工程花岗岩人工骨料碱活性试验研究 service.ilib.cn 2. Benefit Analysis for Three Gorges Project During Its Cofferdam Power Generation Period 三峡工程围堰发电期效益分析 service.ilib.cn 3. Evaluation on the performances and structure characteristics of the hydro-generators of the Three Gorges Project 三峡水电站水轮发电机的性能和结构特点评析 ilib.cn 4. Plastic concrete for cutoff wall using weathered granite sand in stage II cofferdam of Three Gorges Project 风化花岗岩开挖弃料配制三峡二期围堰防渗墙材料 jhe.ches.org.cn 5. Decision on several key technical problems of the turbine for Three Gorges Project 三峡工程水轮机几个重大技术问题的决策 www.ilib.cn 6. Complete Curve of Axial Tensile Stress-Deformation of Three-Graded Concrete in Three Gorges Project 三峡三级配混凝土轴向拉伸应力变形全曲线 www.ilib.cn 7. A summary of the quality inspection standards for manufacture and installation of metal structure in the Three Gorges project 三峡工程金属结构制造安装质量检测标准综述 service.ilib.cn 8. Behavior analysis of Three Gorges Project shiplift dam block during construction 三峡工程升船机上闸首施工期工作性态分析 ilib.cn 9. Water environmental capacity for the reservoir of Three Gorges Project 三峡水库水环境容量计算 jhe.ches.org.cn 10. Influences and Solutions of 135m-Height Storage of Three Gorges Project on Channel Management of the Reservoir Area 三峡工程135米蓄水后对库区航道管理的影响及对策 www.ilib.cn 1. Study on Environmental Capacity of Migrate of Chongqing Reservoir of Three-Gorges Project 三峡工程重庆库区移民环境容量研究 ilib.cn 2. Antiseismic Calculation for Left Hydroelectric Plant's Guide Wall of Three Gorges Project 三峡工程左厂房坝导墙抗震计算分析 www.crsri.cn 3. Explosive Implementation for Water-off Foundation of Overflow Dam of Three Gorges Project 三峡二期工程溢流坝段止水基座爆破施工 www.ilib.cn 4. Study on Mechanisms of Alkali Granite Aggregate Reaction in Three Gorges Project Concrete 三峡大坝混凝土花岗岩骨料碱活性反应机理研究 www.ilib.cn 5. Difficult Points of Quality Control of the Three Gorges Project and Its Solutions 三峡工程施工质量控制的主要难点与对策 www.ilib.cn 6. Study on penstocks without expansion joint between dam and powerhouse in Three Gorges Project 三峡工程水电站厂坝间压力钢管取消伸缩节研究 www.ilib.cn 7. Application of non-dispersible underwater concrete at three gorges project 水下不分散混凝土在三峡工程中的应用 ilib.cn 8. Kinetic Analysis and Structural Optimization of the Buildings for the Three Gorges Project 三峡水电站厂房结构动力分析与优化 www.ilib.cn 9. Hydraulic optimal design for flood discharge structures in Three-Gorges Project 三峡工程泄水建筑物水力优化设计 www.ilib.cn 10. Navigation condition of the upstream of Three Gorges Project dam during the initial 32 years 三峡枢纽运行初期32年坝上游的通航条件 www.ilib.cn 1. Some thoughts and suggestions about clearing reservoir area of Three Gorges Project of Yangtze River during its 3rd stage impoundment 对长江三峡工程库区3期蓄水库底清理工作的思考及建议 www.ilib.cn 2. The Tendency of River Pattern Variation in the Lower Jingjiang River after Completion of the Three Gorges Project 三峡水库建成后下荆江河型变化趋势的研究 www.ilib.cn 3. Application of temperature distribution and crack monitoring optical fiber sensing technology in the Three Gorges Project 温度分布式及裂缝监测的光纤传感技术在三峡工程中的应用 www.ilib.cn 4. Finite Element Analysis on Stress and Deformation of Partition Dikes in Three Gorges Project 三峡工程隔流堤结构应力变形的有限元分析 www.ilib.cn 5. Numerical Analysis and Experiment Study of Stability for Dam Section No. 3 Of the Three Gorges Project 三峡大坝左厂3号坝段稳定性的数值分析和试验研究 www.ilib.cn 6. The Great Importance for Flood Control Combined with Non-project Measures in the Three Gorges Project 三峡工程结合非工程措施进行防洪的重大意义 ilib.cn 7. The Development and Technique of the Wire and Flux Used in the Submerge Arc Welding for Three Gorges Project Runner 三峡转轮埋弧焊焊接材料研制及工艺研究 www.ilib.cn 8. Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream The Gezhouba Project 三峡工程对葛洲坝枢纽下游近坝段水位与航道影响研究 www.ilib.cn 9. Manufacture Techniques for Tailrace Gate of Powerhouse at Three Gorges Project 三峡工程厂房尾水闸门制造技术 ilib.cn 10. The floating debris of Three Gorges Project and its treatment 三峡工程漂污物问题及其治理研究 www.ilib.cn 1. Application of Acrylate in the Foundation Curtain of Dam During the Second Stage of Three Gorges Project 丙烯酸盐在三峡二期工程坝基帷幕中的应用 ilib.cn 2. The application of tower-belts for concrete placement of the second-stage works of Three Gorges Project 塔带机在三峡二期大坝混凝土浇筑中的应用 www.ilib.cn 3. Study on field suppression scheme for hydropower generator unit in Three Gorges Project 三峡工程水轮发电机组灭磁方案研究 ilib.cn 4. Model for Stress Data Monitoring of Three Gorges Project Dam during Construction Period 三峡大坝施工期应力监测资料建模分析研究 ilib.cn 5. On Construction Measures for Navigable Depth of Gezhouba Dam During Construction of the Three-Gorges Project 三峡施工期葛洲坝通航水位工程措施研究 ilib.cn 6. Application of Plastic Concrete Cut-off Wall in Second Stage Cofferdams of Three Gorges Project 塑性混凝土防渗墙在三峡二期围堰中的应用 service.ilib.cn 7. Function of Three Gorges Project against Salty-tide Invasion in Yangtze Mouth 三峡工程对改善长江口咸潮入侵情势的分析 www.ilib.cn 8. Application of GIS in simulation of river basin hydrology in Three Gorges Project reservoir GIS在三峡流域水文模拟中的应用 jhe.ches.org.cn 9. Study on dynamic properties of ship-lift during water-losing from ship chamber of Three Gorges Project 三峡升船机船厢失水事故动态特性研究 www.ilib.cn 10. Rate estimation of geomorphic process of the slope in the reservoir area of Three Gorges Project 三峡库区坡地地貌过程的速率 ilib.cn 1. Numerical simulation on navigable flow in Approach Channel of Three Gorges Project 三峡工程引航道通航水流数值模拟应用研究 www.ilib.cn 2. Treatment of Special Circumstances in Dam Curtain Grouting of Three Gorges Project 三峡大坝帷幕灌浆特殊情况处理 www.ilib.cn 3. Construction and quality control for the upstream mooring dolfins of vertical ship lift of Three Gorges Project 三峡垂直升船机上游靠船墩施工与质量控制 www.ilib.cn 4. Influence of Flood Discharge, Lock Operation and Daily Adjust of Hydraulic Power Plant in the Three Gorges Project on Navigation Conditions 三峡枢纽泄洪、船闸输水及电站调峰对通航条件的影响 www.ilib.cn 5. Analysis of Unbalance Voltage of Power System for Construction of Three Gorges Project 三峡施工供用电网电压不平衡现象分析 www.ilib.cn 6. Application of DTS to monitoring of concrete temperature field in Three-Gorges Project DTS在三峡工程混凝土温度场监测中的应用 service.ilib.cn 7. Author Study on Navigation Condition in Upper Approach Channel of Three Gorges Project's Locks 三峡船闸上引航道通航水流条件研究 www.yrsri.cn 8. Construction and Research of Deep Water Cofferdam for Second Stage of Three Gorges Project 三峡工程二期深水围堰的建设和研究 service.ilib.cn 9. Concrete construction technique for thin-lining wall of ship lock for Three Gorges Project 三峡船闸薄衬砌墙混凝土施工技术 www.ilib.cn 10. Stability analysis for random key block of underground power house of Three Gorges Project 三峡工程地下厂房随机块体稳定性分析 www.ilib.cn 1. Properties of Concrete with Fly Ash and Milled Blast Furnace Slag Powder for Three Gorges Project 三峡工程掺粉煤灰与矿渣微粉混凝土的性能 ilib.cn 2. Design of demolition blasting of complicated structure of concrete cut-off wall in second-stage downstream cofferdam of Three Gorges Project 三峡二期下游围堰砼防渗墙复杂结构拆除爆破设计 www.ilib.cn 3. Research of navigable channel scheme and sediment deposit in Three Gorges Project 三峡工程引航道布置方案与泥沙研究 service.ilib.cn 4. Discussions on the compensation principles and support policies of the development resettlement of Three Gorges Project 论三峡工程开发性移民的补偿原则和扶持政策 ilib.cn 5. Study on Concrete Production Management in Second-stage Works of Three Gorges Project 三峡二期工程混凝土生产管理与决策支持系统研究 ilib.cn 6. Stability against sliding in intake dam section of Yangtze River Three Gorges Project 三峡大坝深层抗滑稳定研究 www.ilib.cn 7. Anchoring protection technology for Three Gorges Project ship lock 三峡船闸锚固工程防护技术 www.ilib.cn 8. Major techniques of concrete construction for Three Gorges Project ship lock 三峡船闸混凝土施工的几项重点技术 www.ilib.cn 9. Response of middle and lower reaches of Yangtze River to the initial operation stage of the Three Gorges Project 三峡水库蓄水运用初期长江中下游河道冲淤响应 jhe.ches.org.cn 10. Benefits of Xiluodu Hydroelectric Power Station to Three Gorges Project 溪洛渡水电站对三峡工程的效益 www.ilib.cn 1. Creativity and practice of the metal structure installation technology in the Three Gorges Project 三峡工程金属结构安装技术的创新与实践 www.ilib.cn 2. A Simple Analysis of the Sediment Feature at Luoshan Section During the 10 Years before the Storage of the Three Gorges Project 三峡工程蓄水前10年螺山断面泥沙特性浅析 service.ilib.cn 3. The installation and prestressed tension of anchor rod of the permanent ship lock miter gate in the Three Gorges Project 三峡永久船闸人字门顶枢锚杆安装及预应力张拉 www.ilib.cn 4. Three Gorges Project changed the navigation of the Chuan Jiang River 三峡工程从根本上改变了川江航运面貌 www.ilib.cn 5. Feedback Analysis of the Rock Slope of Three Gorges Project Shiplock 三峡工程船闸边坡的反馈分析 service.ilib.cn 6. Tree Analysis of Social Risk Cause and Effect for Rural Resettlement in Three Gorges Project 三峡农村移民安置中的社会风险因果树分析 www.ilib.cn 7. Design and Analysis of Miter Gate for the Permanent Ship Lock in Three Gorges Project 三峡永久船闸人字闸门分析与设计 www.ilib.cn 8. Opportunities and Countermeasures for Chuanjiang Shipping by Three Gorges Project 三峡工程给川江航运带来的机遇及对策 www.ilib.cn 9. Management of the price variance of Three Gorges Project 三峡枢纽工程建设的价差管理 www.ilib.cn 10. Application of EPSW Electronic Plotting System to Opening Diversion Channel Closure of Three Gorges Project EPSW电子测绘系统在三峡工程明渠截流中的应用 www.ilib.cn |
随便看 |
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。