单词 | right-bank |
释义 | 例句释义: 右岸,右坡度,罢工权,右列 1. There was a break in the mountains on the right bank, a flattening-out with a low shore line that I thought must be Cannobio. 右岸高山间有一个破口,成为一条低下去的湖岸线,那地方大概就是坎诺比奥吧。 2. The town on the right bank said that it was at the end of the road, so the left-bank town should mend the hole. 他们都认为自己有更好的理由让对方来修补这个洞。右岸的小镇觉得自己是在路的尽头,所以左岸的小镇该负责修理。 news.zhishi.sohu.com 3. Rescued animals in the water sent them to the shore: the left bank to send rabbits, squirrels to the right bank, and nandu can to any side. 在水中救起动物送他们到岸边:送兔子到左岸,松鼠到右岸,而野狼可到任意一边。 www.fishjava.com 4. It was there, in fact, that the three bridges disgorged upon the right bank, and bridges lead to the building of houses rather than palaces. 实际上,新城通往右岸的三座桥梁便是从这里开始的。总是桥梁先产生民宅,然后才产生王宫的。 dictsearch.appspot.com 5. A heavy cart was crossing the Seine at the same time as himself, and on its way, like him, to the right bank. 恰巧有一辆大车,和他一样,要在那时过桥到塞纳河的右岸去。 www.ebigear.com 6. As a practical engineering example, the right bank slope of Jinping First Stage Hydro power station was analyzed. 以锦屏一级水电站右岸边坡为例进行了稳定性分析。 www.cgejournal.com 7. The hotel is located in Right Bank-west, the center area of Kiew, next to the Orthodox Synagogue and Kiew Opera. 这间饭店位于右岸-西方,地处基辅的中心地带,邻近东正教教堂以及基辅歌剧院。 www.orangeway.cn 8. This paper mainly discussed the setting calculation subject of generator-transformer groups of Right Bank Power Station of Three-Gorges. 论文围绕三峡右岸电站发电机变压器组继电保护的整定计算课题展开论述。 paper.pet2008.cn 9. Hui people live in the Left Bank in good faith, it was the right bank of stay, nothing, all but their choice. 许人左岸真诚地生活着,有人右岸停留,没有什么,切不过自己选择。 zhidao.baidu.com 10. In the right bank of the chateau, not the most famous white horse, Mr Praise and wine, the WangBaiTu name. 在右岸的参展酒庄中,没有最有名的白马、奥颂和酒中之王柏图斯的名字。 www.9999jiu.com 1. It was only offered a track on the right bank of the Rhine, which is winding and subject to delays. 提供给它的只是莱茵河右岸的一条弯弯曲曲易于晚点的轨道。 www.ecocn.org 2. The beautiful white church Sacre Coeur lies on top of the hill on the Right Bank (north side) of the Seine. 美丽洁白的圣心教堂位于塞纳河右岸(即北面)的山顶上。 dictsearch.appspot.com 3. The right bank of the river marks Nicaragua's border with Costa Rica. 河流的右岸是尼加拉瓜和哥斯达黎加的分界线。 www.ecocn.org 4. As is paying cheques into the right bank account for customers. 将顾客的支票打入正确的账户,也也是有意义的。 www.ftchinese.com 5. The left bank was built by those who told the jokes, and the right bank by those who listened. 说笑话的人建了左岸,听笑话的人建了右岸。 www.ecocn.org 6. good staff training and the right bank-related training of personnel. 善于员工培训和对银行相关人员的培训。 zhidao.baidu.com 7. Three years later, Ms. Latham bought two small plots totaling 2, 500 square meters on the right bank of the Mekong River. 三年后,贝娅特丽克丝在湄公河右岸买下了总面积为2,500平方米的两小块地皮。 c.wsj.com 8. Choosing the Right Bank: Deciding to bank your baby's cord blood is a big decision and requires some research. 选择合适的血站:为宝宝的脐血选择一家好的血站是非常重要的,有待研究考察。 www.bing.com 9. Left Bank have extraordinary physical and spiritual, while the right bank is home to watch Angel. 左岸有平凡身体灵魂,而右岸则住着守望天使。 zhidao.baidu.com 10. Remember that the right bank account can make a difference to your balance. 请记住正确的银行帐户账户能对你的帐户余额产生影响。 richfamily.ca 1. The Manchus attacked from the right bank. 清军这回从右岸进攻。 www.ecocn.org 2. The Town, which was the largest of the three fragments of Paris, held the right bank. 新城是巴黎三大块中最大的一块,位于塞纳河的右岸。 www.hotdic.com 3. The right bank of the Thames River is on the south side because the river flows east. 泰晤士河右岸位于那边,因为这条河是往东流的。 www.hxen.com 4. Study on characteristics and engineering effects of debris flow on the right bank of a hydropower station, southwest of China 西南某水电站闸址区右岸泥石流特征及其工程效应研究 www.ilib.cn 5. Safety Monitoring for the Main Power House of Three Gorges Right Bank Underground Hydropower Station at Construction Stage 三峡工程右岸地下电站主厂房施工期安全监测 www.ilib.cn 6. The Design and Construction of the Right Bank High Slope Excavation and Support for the Tuka River Hydropower Project 土卡河水电站右岸高边坡开挖支护设计与施工 ilib.cn 7. Study on Xiluodu Hydropower Station Right Bank Underground Powerhouse Chamber Complex Stability and Shear Zone Location Sensitivity 溪洛渡水电站右岸地下厂房洞室群稳定性及错动带位置敏感性研究 ilib.com.cn 8. Seepage mode around the right bank of Liujiaxia Hydropower Station 刘家峡水电站右岸绕坝渗流模式 www.ilib.cn 9. Research on image and form of pre-concession district on Haihe River right bank in Tianjin 天津市海河右岸原租界区意象及形态研究 www.ilib.cn 10. Research Summarization on Design of Main Protection Configuration Scheme for Hydro-generator of Three Gorges Right Bank Power Station 三峡右岸发电机主保护配置方案设计研究总结 www.ilib.cn 1. Engineering geological characteristics of right-bank weak tectonic rock zone of Nuozhadu Hydropower Station and its effect 糯扎渡水电站右岸构造软弱岩带工程地质特性及影响 service.ilib.cn 2. Scheme Comparing for Foundation Treatment of Right Bank Gate Dam of A Hydroplant 晒谷滩水电站右岸闸坝基础处理方案比较设计 www.ilib.cn 3. Excavation controlling technique of the traffic tunnel on the Longtan hydropower station right bank 龙滩水电站右岸交通隧洞开挖控制技术 ilib.cn 4. Toppling Failure Analysis with Distinct Element Method for the Right Bank of the Changma Earth Dam 昌马水库坝址右岸倾倒边坡离散元法稳定分析研究 jhe.ches.org.cn 5. Stability analysis and support measures for right-bank navigation channel slope of Longtan Hydroelectric Project 龙滩水电站右岸航道边坡稳定性分析与支护措施 ilib.cn 6. Application of large pipe-shelf technology in right bank diversion tunnel construction of Longtan hydropower station 大管棚技术在龙滩右岸导流洞施工中的应用 www.ilib.cn 7. Concrete Production System Temperature-control Technique on the Right Bank of Longtan Hydropower Project 龙滩水电工程右岸混凝土生产系统温控技术的运用 www.ilib.cn 8. Introduction of Concrete Production and Refrigeratory System Technology of Right Bank Dam of LONGTAN Hydro-power Station 龙滩水电站右岸大坝混凝土生产制冷系统工艺介绍 ilib.cn 9. Construction's Controlling Survey of Left and Right Bank's Tunnels for Flood Releasing and Scouring Sand of Three Stores Hydraulic Project 三座店工程左右岸泄洪冲砂洞施工控制测量 www.ilib.cn 10. Application of light well point drainage in right bank dike construction of Nenjiang river 轻型井点降水在嫩右工程施工中的应用 www.ilib.cn 1. Test and Study of Seepage and Deformation in Structural Soft Rock Zone on Right Bank of Nuozhadu Hydropower Project 糯扎渡电站右岸构造软弱岩带渗透变形试验研究 www.ilib.cn 2. Exploration of correction measures to scour hole near the right bank of tailwater of Wujiangdu Hydropower Station 乌江渡发电厂尾水右岸冲坑治理措施的探索 ilib.cn 3. Stability analysis of right bank slope at the dam site of Longtan hydropower station and harnessing suggestions 龙滩坝址右岸边坡稳定性分析及治理建议 www.ilib.cn 4. Construction contract management of right bank slope and diversion tunnel of Longtan hydropower station 龙滩水电站右岸岸坡和导流洞施工合同管理 ilib.cn 5. Application of micro-computerized monitoring and control system for the right bank hydropower plant of Yahekou water reservoir 微机监控系统在鸭河口水库右岸电站的应用 ilib.cn 6. Concrete Lining Engineering Method for Diversion Tunnel on the Right Bank of Xiluodu Hydropower Station 溪洛渡水电站右岸导流洞混凝土衬砌的施工方法 www.ilib.cn 7. Stability Analysis of the Rock Slope of Changma Reservoir's Right Bank with Discrete Element Method 昌马水库枢纽工程右岸岩石边坡稳定性的离散元法分析 service.ilib.cn 8. The Characteristic of Mechanical and Hydraulic Part for Governing System in Three-Gorges Right Bank Power Station 三峡右岸电站调速系统机械液压部分的特点 www.ilib.cn 9. Study on blast-induced damage zone for excavation of diversion tunnel at right bank of Longtan Hydroelectric Project 龙滩水电站右岸导流洞开挖中爆破损伤范围研究 www.ilib.cn 10. Quality control for foundation consolidation grouting without concrete covering at right bank dam of TGP 三峡右岸大坝基础无盖重固结灌浆质量控制 www.ilib.cn 1. Excavation Blasting for Diversion Tunnel at the Right Bank of Longtan Hydropower Station 龙滩水电站右岸导流洞开挖爆破实践 www.ilib.cn 2. Prestress Anchor Construction at the Right Bank Slope of Longtan Hydropower Station 龙滩水电站右岸航道边坡预应力锚索施工 www.ilib.cn 3. Analysis on Stability of Sidehill Body in Right Bank of Wenyuhe Reservoir And its Strengthening Treatment 文峪河水库右岸山体的稳定分析及加固处理 www.ilib.cn 4. Discussion on communication network of water regime automatic measuring system in right bank main tributary of Nenjiang river 嫩江右侧主要支流水情自动测报系统通信组网探讨 ilib.cn 5. Key technology in excavation of large size diversion tunnels on the right bank of Xiluodu Hydropower Station 溪洛渡水电站右岸导流洞大型洞室群开挖施工关键技术 www.ilib.com.cn 6. The Embankment Downstream Right Bank Slope Stability Analysis and Support of the Nuozhadu Hydropower Project 糯扎渡水电站坝体下游右岸坡稳定分析及支护 ilib.cn 7. Measurement analysis of the bonding strength of shotcerting of three gorges right bank underground power station 浅谈三峡右岸地下电站喷射混凝土粘结强度检测分析 www.ilib.cn 8. Observation and Analysis of Blasting Vibration on the Right Bank's High Slope of Longtan Hydropower Project 龙滩水电工程右岸高边坡开挖爆破震动观测与分析 ilib.cn 9. Confirmation of treatment scheme about karst seepage of structure outcut on the right bank of reservoir head of Hongjiadu Hydropower Station 洪家渡水电站库首右岸构造切口岩溶渗漏处理方案的确定 www.ilib.cn 10. Application of geotechnical grate in Fuyang river right bank strengthening project 土工格珊在滏阳河右堤加固工程中的应用 service.ilib.cn 1. Construction Difficulties and Conutermeasures for Braced-tunnel on the Abutment Right Bank of Longtan Hydropower Station 龙滩水电站右岸坝肩锚固洞施工难点及对策 ilib.cn 2. Cause analysis and treatment on accumulatively weathered deep channel at right-bank dam abutment of Longtan Hydroelectric Project 龙滩水电站右岸坝肩堆积风化深槽成因分析与治理 ilib.cn 3. Blasting Excavation for Foundation of Civil Works on Right Bank of Jinghong Hydropower Project Plan 景洪水电站右岸土建工程基础开挖爆破试验规划 www.ilib.cn 4. Design and Research for Concrete Production System at Right Bank of Longtan Hydraulic Power Station 龙滩水电站右岸混凝土生产系统设计研究 ilib.cn 5. Fracture-damage stability analysis of underground powerhouse in right bank of Three Gorges 三峡右岸地下电站厂房围岩稳定性断裂损伤分析 www.ilib.cn 6. Application of Sprayed Concrete in the Diversion Tunnel at the Right Bank of Longtan Project 喷射混凝土在龙滩水电站右岸导流隧洞中的应用 www.ilib.cn 7. Study on the Anti-sliding Stability of the Right Bank RCC Gravity Dam of Baise Hydro-project 百色水利枢纽右岸重力坝抗滑稳定研究 ilib.cn 8. Access Tunnel Excavation Technology on the Right Bank in Longtan Hydropower Station 龙滩水电站右岸交通洞开挖技术 www.ichacha.net 9. Quality control of right bank diversion tunnel construction of Longtan reservoir 龙滩水电站右岸导流隧洞施工质量管理与控制 www.ilib.cn 10. Analysis on tailrace system with varying crown elevation at TGP's right bank underground power station 三峡右岸地下电站变顶高尾水系统分析研究 www.ilib.cn 1. Control of dike construction quality in provincial boundary for Nenjiang river right bank 嫩江右岸省界堤防工程施工质量控制 service.ilib.cn 2. It was to protect the right bank of Paris; 这是保护权利的巴黎银行; wenwen.soso.com 3. Construction method of unfavorable section of belt tunnel of right bank concrete mixing system of Longtan hydropower station 龙滩右岸混凝土拌和系统胶带洞不良洞段施工 ilib.cn 4. Implementation of Longtan Right Bank Road Construction Contract 龙滩场内右岸公路施工合同实践 www.ilib.cn 5. Environmental protection in right bank dike construction of Nenjiang river 嫩江右岸堤防工程施工中的环境保护措施 service.ilib.cn 6. Monitoring on Concrete Production System at Right Bank of Longtan Hydropower Station 龙滩水电站右岸大坝混凝土生产系统整合监控技术 ilib.cn 7. Formation Analysis of Silty Sand Stone Cave in the Current Converter Station on the Right Bank of Three-Gorge 三峡右岸换流站泥质砂岩洞穴成因分析 www.ilib.cn 8. Distortion monitoring on intake of underground power station at the right bank in TGP 三峡工程右岸地下电站进水口施工期变形监测及特征 www.ilib.cn 9. Inlet cofferdam design of right bank diversion tunnel of Longtan hydropower station 龙滩水电站右岸导流洞进口围堰设计 ilib.cn 10. Construction Technology in Excavation of Diversion Tunnelat the Right Bank of Xiluodu Hydropower Station 溪洛渡水电站右岸导流洞堵头段开挖施工技术 scholar.ilib.cn 1. Geological evaluating experience of karst infiltration project in the right bank for Wanjiazhai reservoir area 万家寨库区右岸岩溶渗漏工程地质评价经验 www.ilib.cn 2. Elastic-plastic Finite Element Analysis on Slope of Valley Mouth Area of Cushion Pool on the Right Bank of Goupitan Hydropower Station 构皮滩水电站右岸水垫塘峡谷出口区边坡弹塑性有限元分析 ilib.cn 3. Study on Design and Construction Opportunity of Right Bank Underground Power Station of TGP 三峡右岸地下电站设计与兴建时机的研究 www.ilib.cn 4. Excavation of temporary access tunnel on right bank of Shiziping Hydropower Station through complicated strata 狮子坪水电站右岸临时交通洞不良地质段开挖措施 ilib.cn 5. Type selection of gyrating-flow spillway tunnel in the right bank of the Gongboxia Hydropower Station 公伯峡水电站右岸旋流泄洪洞的选型 www.ilib.cn 6. Solution of Soft Foundation of the Main Earth Dam on the Right Bank of Feilaixia Project 飞来峡水利枢纽右岸主土坝软基处理 ilib.cn 7. Excavation for High Vertical Slope in the Inlet of an Underground Power Plant at Right Bank the Three Gorges 三峡右岸地下电站进水口高直边坡开挖 ilib.cn 8. Safety measures against explosive shock for TGP right bank excavation works 三峡右岸场地开挖工程爆破振动安全控制 www.ilib.cn 9. Quality control on blocking right bank diversion tunnel during flood period 引子渡水电站右岸导流洞汛期封堵质量控制 scholar.ilib.cn 10. The study on controlled blasting in excavation of diversion runnels of the underground power plant on the right bank of Three Gorges project 三峡右岸地下电站引水隧洞开挖控制爆破技术研究 www.ilib.cn 1. Study on the seepage stability of the right-bank weakened zone of Nuozhadu Hydropower Station 糯扎渡水电站右岸构造软弱岩带渗透稳定性研究 www.ilib.cn 2. Talking project archives management of Nenjiang river right bank dike 浅谈嫩江右岸堤防工程档案管理工作 www.ilib.cn 3. Stability Analysis of Right Bank Slope of La-Zhai Hydroelectric Power Station 腊寨水电站坝址区右岸边坡稳定分析 www.ilib.cn 4. Elementary analysis on rock-deformation features of natural side on right bank of Yinzidu Hydropower Station 引子渡水电站右岸自然边坡岩体变形特性浅析 ilib.cn 5. Measures for quality control of excavating abutment on the right bank of Goupitan Hydropower Station 构皮滩水电站右岸坝肩开挖质量控制措施 ilib.cn 6. Damaging Way and Countermeasures of the Higher Side of Right Bank Road of Goupitan Power Station 枸皮滩水电站右岸公路高边坡破坏型式及其处理 ilib.cn 7. Study on the Mountain Deformation on the Right Bank of Jinshan Hydropower Station and Its Reinforcement Design 金山水电站右岸山体变形分析及加固设计 www.ilib.cn 8. Stability Evaluation and Treatment to Right Bank Slope of Danshui Canal 丹水撇洪渠右岸边坡稳定分析及治理 www.ilib.cn 9. Stability and Treatment of the Slope at Right Bank of Penstocks 压力钢管右边坡稳定分析及处理 service.ilib.cn 10. Construction quality control of Nenjiang right bank dike 嫩江右岸堤防施工质量控制 scholar.ilib.cn 1. Engineering Geocryological Problems of Kolyma Lowlands Right Bank Area 科累马河低地右岸地区的工程冻土问题 www.ilib.cn 2. Summary of main optimized design projects of TGP power station on right bank 三峡水利枢纽右岸电站主要设计优化项目综述 www.ilib.cn 3. Construction of prestressed tendon in right bank high side slope of Hanpingzui water power station 汉坪咀水电站右岸高边坡预应力锚索施工 www.ilib.cn 4. Talking about the Stabilizing Treatment of the Massif on the Right Bank of the Wenyuhe Reservoir 浅谈对文峪河水库右岸山体的加固处理 www.ilib.cn 5. Supervision and quality control for gate installation accuracy at No. 3 debris sluice of TGP right bank dam 右岸大坝3号排漂孔闸门安装监理 www.ilib.cn 6. Quality Control for Concreting on Dry Wall Surface of Powerhouse in Right Bank at Three Gorges Project 三峡右岸厂房清水墙面混凝土施工质量控制 ilib.cn 7. Analyze Karst Seepage on the Right Bank of the Wanjiazhai Reservoir Area 万家寨水利枢纽库区右岸岩溶渗漏分析 service.ilib.cn 8. Application of the geofabric in the slope protection project on the right bank of lugouxiaoyue lake 土工模袋在卢沟晓月湖右堤护坡工程中的应用 service.ilib.cn 9. Project management of Nenjiang right bank dike 嫩江右岸省界堤防工程项目管理 www.ichacha.net 10. A Tracing Test of Karst Leakage on the Right Bank of Wanjiazhai Reservoir 万家寨水库右岸岩溶渗漏试验研究 service.ilib.cn 1. Analysis on Cause of Formation for Right Bank Sliding Mass in Zaomu Reservoir 枣木水库大坝右岸滑坡体滑坡成因分析 www.ilib.cn 2. Comparison of flow depth on the right bank 右岸水深的比较 www.cjk3d.net 3. The Left and Right Bank 左岸与右岸 wenku.baidu.com |
随便看 |
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。