网站首页  词典首页

请输入您要查询的英文单词:

 

单词 roof control
释义

roof control

美 
英 
  • un.顶板管理
  • 网络顶板控制;工作面顶板控制;车顶管
un.
1.
顶板管理

例句

释义:
1.
The Analysis on Roof Control of Working Face of Medium-thickness Coal Seam Comprehensive Mechanized Top Coal Caving Method
中厚煤层综采放顶煤工作面顶板管理
ilib.cn
2.
Deep hole pre-cracking blasting technology applied to roof control of fully mechanized coal mining face
深孔预裂爆破技术在综采顶板管理中的应用
ilib.cn
3.
Roof Control Design with High Capacity and High Efficiency of Single Working Face Under Complex Geologic Conditions
复杂地质条件下单体工作面高产高效控顶设计
ilib.cn
4.
Roof control technology for high mining height coal mining face in "two hard" seam
“两硬”大采高工作面顶板控制设计技术
www.ilib.cn
5.
Surrounding rock structure in entry remained for next sublevel with compound roof and roof control technology
复合顶板沿空煤巷围岩结构及控顶技术
www.ilib.cn
6.
Roof Control and the Safety for the Fully Mechanized and Roof-coal Caving Face of "Three-softs" Coal-beds
“三软”煤层综放工作面的顶板管理与安全
www.ilib.cn
7.
Roof control in lower end fully mechanized top-coal caving face and application of suspended bar composite supports
综放面下端头顶板管理及悬移支架的应用
ilib.cn
8.
Roof Control Technology of Light-support in Full-mechanized Mining Face
轻型支架综采工作面顶板控制技术
www.ilib.cn
9.
Simulation analysis on roof control method in working face with props under ascending mining condition
上行开采单体面控顶方式的模拟分析
www.ilib.cn
10.
The roof control technology practice of working face pillars remained in stress concentrated area
应力集中区工作面煤柱留设顶板控制技术实践
scholar.ilib.cn
1.
Mine Ground Pressure Appearance and Roof Control of Residual Pillaring in Upper Layer in the Mining of Lower Layer
上层残留煤柱在下层开采中的矿压显现与顶板控制
www.ilib.cn
2.
Research on roof control technology under non binding artificial roof condition
无胶结人工顶板条件下顶板控制技术研究
ilib.cn
3.
The analysis and practice of roof control in belt coal seam face beneath thick aquifer accumulation
厚冲积层下带沟状煤体顶板控制分析与实践
www.ilib.cn
4.
Characteristics of Strata Behaviors and Roof Control for Longwall Faces in Deep Mining
煤矿深井采场矿压显现及其控制特点
www.ilib.cn
5.
Raise the "one-pass three" roof control, electrical and mechanical transportation efforts;
加大“一通三防”、顶板管理、机电运输等工作力度;
www.123wzdq.com.cn
6.
Approach on Roof Control Technology for Combined Mining and Blasting Mixed Mining
综采综放混合开采顶板控制技术探讨
www.ilib.cn
7.
Discussion on Roof Control of Large Gradient Blast-winning with Sublevel Caving
大坡度炮采放顶煤顶板控制的探讨
www.ilib.cn
8.
Roof Control of Sub - level Caving Mining in "Three- weak Elements" Unstable Thick Seam
“三软”不稳定厚煤层综放开采的顶板控制
www.ilib.cn
9.
Approach on the roof control of the combined mining lower layered face
综采下分层工作面顶板控制探讨
www.ilib.cn
10.
Roof Control for the Full-mechanized Face in the Lower Slice Layer of Coal Seam
平煤一矿下分层综采工作面的顶板管理
www.ilib.cn
1.
Head face roof control technology in very complex structure seam working face
极复杂构造煤层工作面端面顶板控制技术
www.ilib.cn
2.
Roof Control and Coal Caving Technique of Fully Mechanized Caving Mining
综采放顶煤的顶板与放煤管理技术
www.ilib.cn
3.
Study and practice of roof control technology in soft rock blasting working face
软岩炮采工作面顶板控制技术研究与实践
ilib.cn
4.
Evolvement rules of the roof control and crack field in working face
顶板防治与回采工作面裂隙场演化规律
168.160.184.82:8080
5.
Roof Control of Sub- level Caving Mining Workface under Complicated Geological Condition
复杂地质条件下综放工作面的顶板控制
www.ilib.cn
6.
Roof control technology for Wongawilli coal mining method
旺格维利采煤法顶板控制技术
www.ilib.cn
7.
Roof control and the application of its expert system
采场顶板控制及其专家系统的应用
service.ilib.cn
8.
The application of numerical simulation in big dip angle and hard roof control
数值仿真在大倾角坚硬顶板控制中应用
www.ilib.cn
9.
Roof Control with Roof Bolt in Seam Roadway under Difficult Conditions
困难条件下的煤巷锚杆控顶技术
www.ilib.cn
10.
Discussion on roof control reform for blasting coal face under wire mesh roof
网下炮采工作面顶板管理改革探讨
www.ilib.cn
1.
Study on compound roof control technology in shock bump working face
冲击地压工作面复合顶板控制技术研究
www.ilib.cn
2.
Probe into roof control in thick seam adopted top-grade blasting mining
厚煤层高档工作面顶板管理初探
www.ilib.cn
3.
Roof Control of Large Cross-sectional Mining Roadway
大断面回采巷道的顶板管理
www.ilib.cn
4.
On Roof Control of Goaf of Large Mining Height Fully-mechanized Face
大采高综采工作面采空区顶板处理的实践
www.ilib.cn
5.
Roof control and practices on coal mining under complex roof
复合顶板下采煤的顶板控制与实践
www.ilib.cn
6.
Research on the Strong Roof Control Technique on the Strip Face
条带工作面坚硬顶板控制技术的研究
www.ilib.cn
7.
Practices and measures of roof control in coal mining face under complex roof in Silaogou Mine
四老沟矿复合顶板下开采顶板管理的实践
www.ilib.cn
8.
Roof control technology in soft floor working face
软底板工作面的顶板控制技术
www.ilib.cn
9.
Discussion about roof control technology development of China in future
对我国今后顶板控制技术发展的探讨
ilib.com.cn
10.
Research on Overhead Driller for Roof Control
工作面放顶钻机研究
www.ilib.cn
1.
Inquiring into Strong Roof Control in Luling Mine
芦岭矿坚硬难冒落顶板管理探讨
www.ilib.cn
2.
Upward mining to improve complex roof control of seam
采用上行开采改善煤层复合顶板的控制
www.ilib.cn
3.
Xuecun Mine roof control when driving under artificial roof with coal pillar
薛村矿留煤假顶下掘进顶板安全管理
service.ilib.cn
4.
Roof Control on the Mining Face of DaQingjiao Lonely Island
大倾角孤岛开采工作面顶板控制
ilib.cn
5.
Roof control of floor roadway in outburst seam
突出煤层底板大巷施工顶板管理
www.ilib.cn
6.
Application of Bolt Support in Roof Control of Loading Workface
锚杆支护在采掘工作面顶板管理中的应用
www.ilib.cn
7.
Roof Control Method of Blasting Caving Coal
炮采放顶煤顶板控制方法
www.ilib.cn
8.
Roof Control Practice of Gob-side Entry retaining in 91208 Roadway
91208巷沿空留巷顶板控制实践
ilib.cn
9.
Roof Control Technology of Mining Roadway in 2# Coal Seam in Liyazhuang Colliery
李雅庄矿2#煤层回采巷道顶板控制技术研究
service.ilib.cn
10.
Roof Control in High-grade Face
高档工作面顶板管理的几点做法
www.ilib.cn
1.
Roof Control of Steep Coal Seam
急倾斜煤层的顶板管理
www.ilib.cn
随便看

 

英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。

 

Copyright © 2004-2022 Newdu.com All Rights Reserved
更新时间:2024/12/26 3:11:15