单词 | project area | ||||||||||||||||
释义 | project area
更多释义 收起释义 例句释义: 项目区域,投影面积,项目域 1. Note: User1 must be a member of the target team and the project area to be able to perform the Deliver operation. 注意:User1必须是目标团队的一名成员,而且项目区域能够执行Deliver操作。 www.ibm.com 2. Expand the project area and team area to which you wish to deploy a report template. 展开您希望将报表模板部署到的项目区域和团队区域。 www.ibm.com 3. Each project artifact of a project area belongs to exactly one of its team areas. 项目区域的每个项目构件确切地仅属于其中一个团队区域。 www.ibm.com 4. If you prefer to report the time that has been spent so far for a task, you can configure your Project Area accordingly. 如果您想报告花在某项任务上的时间,那么您可以根据需求配置ProjectArea。 www.ibm.com 5. The next step in configuring the server is to create a project area in which to store your work. 配置服务器的下一步是创建一个存储您所做工作的项目区域。 www.ibm.com 6. The project area is the particular node in the team project hierarchy to which the test belongs. 项目区域是测试所属的团队项目层次结构中的特定节点。 msdn2.microsoft.com 7. The construction difficulty of dike closure would be increased when multi-basin rivers are converged on the reclamation project area. 多流域水系在围垦工程围区内汇合,增加了围垦工程龙口合龙施工的难度。 www.dictall.com 8. Next, you will create a work item for John, the team lead, for him to create empty projects and then share them in the Project Area. 接下来,您将为John,这个团队领导创建一个工作任务,给他创建一个空白项目,然后将它们放在ProjectArea中共享。 www.ibm.com 9. On the left side of the Rational Team Concert rich client, right-click the project area, as shown in Figure 8, and then select Open. 在RationalTeamConcert客户端的左边,右击项目区域,如图8所示,然后选择Open。 www.ibm.com 10. The Panel noted the Survey Report of Historical Buildings and Structures within the Project Area of the Central Reclamation Phase III. 事务委员会察悉中环填海计划第三期工程范围内的历史建筑物与构筑物调查报告。 www.legco.gov.hk 1. When you set the Project Area property of a test, you place the test within a team project's organizational structure. 在设置测试的“项目区域”属性时,应将测试放在团队项目的组织结构内。 msdn2.microsoft.com 2. Over time, a project artifact may move from team area to team area, but always within the scope of its original project area. 随着时间的推移,项目构件可能从一个团队区域移动到另一个团队区域,但是始终在最初的项目区域的范围之内。 www.ibm.com 3. To avoid disturbance to the country park beyond the project area, no haul route or access route shall be constructed for access to the site. 为避免对工程项目范围外的郊野公园地方造成滋扰,工程不得建造通往工地的通路。 sc.info.gov.hk 4. The project area owns all project artifacts, and all relationships between these artifacts, that constitute the resources of the project. 项目区域拥有构成项目资源的所有项目构件和这些构件之间的所有关系。 www.ibm.com 5. To complete the integration, you will need to have access to a project area on a Rational Team Concert server. 为了完成集成操作,您将会需要访问RationalTeamConcert服务器上的项目区域。 www.ibm.com 6. Because Chris is neither a member nor an administrator of this project area, a "Permission Denied" warning will display. 因为Chris既不是团队成员也不是项目区域的管理员,所以会显示出“PermissionDenied”的警告信息。 www.ibm.com 7. The Jazz security model gives this user basic admin privileges in Jazz but no particular rights within a given Project Area. Jazz安全模型给与了这个用户基本的管理员特权,而不是给定ProjectArea内特定的权利。 www.ibm.com 8. Whether the rehabilitation of buildings in the proposed project area is a practicable and viable option . 建议重建项目范围内的楼宇是否可以复修。 www.bing.com 9. Information about user management, project area management, and project-administration actions are not included in this paper. 本文中并不包含关于用户管理、项目区域管理、项目管理操作的信息。 www.ibm.com 10. Later, if appropriate, the team's Project Area administrator can remove you as an administrator. 随后,如果顺利的话,团队的ProjectArea管理员可以去掉您作为一名管理员的身份。 www.ibm.com 1. In our example, Kim is now connected to the Jazz Project area and sees the team area editor for the Process component team. 在我们的示例中,Kim现在已连接到JazzProject区域,并将看到Process组件团队的团队区域编辑器。 www.ibm.com 2. To switch scenarios, I select the Start Project area and change the command line to open an IML file. 为了切换方案,我选择了StartProject(开始项目)区域,然后更改命令行以打开IML文件。 msdn2.microsoft.com 3. Configuring project area and iteration settings for a team project. 配置团队项目的项目区域和迭代设置。 msdn2.microsoft.com 4. KENID is a final contractor and equipment suppliers with large scale and technical strength in the air cleaning project area . 是颇具规模和技术实力的空气洁净领域的工程总承建商和设备供应商。 jobs.renhe.cn 5. I am responsible for the technical (scheduling, inspection, quality control) work of this project (area). 我负责这个项目(区域)的技术(计划,检查,质量控制)工作。 www.8875.org 6. Rather than having a ClearQuest group for each project, create a group for a large project area. 不是为每一个项目配置一个ClearQuest组,而是为大型的项目区域创建一个组。 www.ibm.com 7. A team is explicitly represented as a project artifact belonging to the project area. 团队显式地表示为属于该项目区域的项目构件。 www.ibm.com 8. The team of contributors is generally responsible for the project area and everything in it. 贡献者组成的团队一般负责该项目区域和其中的一切。 www.ibm.com 9. If any test execution fails, you can create a defect report in the Rational Team Concert project area from within Rational Quality Manager. 如果有任意的测试执行失败了,您就可以在RationalTeamConcert项目区域内创建一个缺陷报告。 www.ibm.com 10. Project area for a complete listing of free open source resources from. 获得免费的开放源代码的完整清单。 www-128.ibm.com 1. This project area includes a 35-block, inner-city neighborhood and is planned through a 45-year process. 该项目区包括35块,内城街道,是通过45年的进程计划。 www.28sk.cn 2. Indications of regional structures throughout the TCM project area are difficult to locate. 整个TCM项目范围的地域结构标识很难定位。 zhidao.baidu.com 3. A project area is structured into team areas, arranged in a multi-rooted hierarchy. 项目区域划分为各个团队区域,并安排为具有多个根的层次结构。 www.ibm.com 4. Before you begin, collect the following information regarding your Rational Team Concert server that hosts your project area. 在您开始之前,收集与位于项目区域内RationalTeamConcert服务器相关的以下信息。 www.ibm.com 5. In the editor pane, click Add to launch the wizard for selecting Project Area members to add to this team. 在编辑器界面内,点击Add以启动向导,来选择ProjectArea成员,并将他们添加到这个团队中。 www.ibm.com 6. You will then connect to it to create a Project Area and modify it further. 您将会链接它,并创建一个ProjectArea,然后进一步修改。 www.ibm.com 7. Project Administrators can modify a Project Area even if no permissions are granted to make changes. 项目管理员可以编辑项目区域,就算没有做出变动的权限协议也可。 www.ibm.com 8. The types of work items used in a project area are defined by the process. 项目区域中使用的工作项的类型由流程定义。 www.ibm.com 9. Project area, which provides resources for Geronimo developers. 项目区,它为Geronimo开发人员提供资源。 www-128.ibm.com 10. Sending invitations is not limited to the team or project area editors. 发送邀请并不仅限于团队或项目区域编辑器。 www.ibm.com 1. Project area provides resources for Geronimo developers. 项目区为Geronimo开发人员提供了一些参考资料。 www-128.ibm.com 2. Now that the project area links are complete, you can proceed with linking the artifacts. 现在项目区域链接是完整的,您可以继续链接工件。 www.ibm.com 3. To create a new project area, you need to have both JazzAdmins role privileges and the necessary client access licenses (CALs). 为了创建新的项目区域,您需要同时拥有JazzAdmins角色权限以及必要的客户访问许可证(ClientAccessLicense,CAL)。 www.ibm.com 4. A work item is something that is to be completed in the domain of this project area. 一个工作条目就是在这个项目区域的领域完成的事件。 www.ibm.com 5. Associated with a project area is a team process. 与某个项目区域关联的是一个团队流程。 www.ibm.com 6. In the Project Area editor, there is an area for providing a description of the project. 在ProjectArea编辑器中,有一个可产生项目描述的地方。 www.ibm.com 7. The governing team area or project area that the operation or action belongs to. 您所执行操作所属的管理团队区域或者项目区域。 www.ibm.com 8. In recent years, multisensor image fusion has attracted many attentions in remote sensing area and image project area. 多源遥感图象数据融合(也称信息融合)是近年来遥感领域和图象工程领域的研究热点。 www.lw23.com 9. Now that the project area is linked, you can proceed with linking the artifacts. 现在项目区域已经列出了,所以您可以继续链接工件了。 www.ibm.com 10. You may have to select More Groups to find the Team Project Area group. 您可能需要选择“其他组”才能找到“团队项目区域”组。 msdn2.microsoft.com 1. Project area to access resources for Geronimo developers. 项目区以访问Geronimo开发者的资源。 www-128.ibm.com 2. Select project name using "project area " drop down list box for which you want to connect. 使用您想要连接的“Projectarea”下拉列表框来选择项目名。 www.ibm.com 3. See the Add users to the Project Area section of this article for details. 请参见这篇文章中详细叙述的添加用户到项目区域部分。 www.ibm.com 4. Once you are connected to a project area you can access its artifacts. 连接到某个项目区域以后,您就可以访问其构件。 www.ibm.com 5. In the Team Artifacts view, expand your project area and then expand the Reports folder. 在TeamArtifacts视图中,展开您的项目区域以及Reports文件夹。 www.ibm.com 6. Select the appropriate project in the Associate with Project area. 在AssociatewithProject区域中选择适当的项目。 www.ibm.com 7. Each project area defines the list of available categories. 每个项目区域都定义了可用分类的列表。 www.ibm.com 8. Let's start with a Project Area A, using the Scrum process template. 让我们从使用Scrum项目模板的项目区域A开始。 www.ibm.com 9. Thereafter, users can access the Project Area by using custom user names and passwords. 因此,用户可以通过使用自定义用户名和密码来访问这个ProjectArea。 www.ibm.com 10. In the Project Area dialog box, click the down arrow in the Node in Project Area drop-down box. 在“项目区域”对话框中,单击“项目区域中的节点”下拉框中的向下箭头。 msdn2.microsoft.com 1. The benefits of the Second Loess project are not limited to the project area. 黄土高原项目二期的有利影响还不仅仅限于项目区。 web.worldbank.org 2. This option helps you categorize reports according to team areas, but for now you can assign the report to the project area. 这个选项会帮助您根据团队区域来组织报表,但是现在您可以将报表分配给项目区域。 www.ibm.com 3. Species richness of shrubland in the Project Area is considered very low. 工程项目区内的灌木丛的品种丰盛程度非常低。 www.epd.gov.hk 4. Select your project area and stream name according to your configuration. 根据您的配置情况来选择您的项目区域。 www.ibm.com 5. The wizard allows to select the desired project area and work item type. 该向导还允许选择所需的项目区域和工作物件类型。 www.ibm.com 6. From the Project menu, select Group By, and then select Team Project Area. 从“项目”菜单中选择“分组依据”,然后选择“团队项目区域”。 msdn2.microsoft.com 7. In the following procedure, you set a test's Project Area and Iteration properties. 在下面的过程中,您将设置测试的“项目区域”和“迭代”属性。 msdn2.microsoft.com 8. The work in a project area is done in a sequence of Iterations whose start and end dates are defined in the process' state. 项目区域中的工作在一系列的迭代中完成,迭代的开始和结束日期在流程的状态中进行定义。 www.ibm.com 9. Select your component under you project area's stream. 在项目区域的流程之下选择您的构件。 www.ibm.com 10. After the project area has been created, the project area editor will open. 在创建项目区域之后,项目区域编辑器将会打开。 www.ibm.com 1. When you create a Project Area the first time, you need to deploy the pre-packaged process templates, so click Deploy Templates. 当您首次创建ProjectArea时,您需要部署前面包裹的过程模板,所以点击DeployTemplates。 www.ibm.com 2. The Project Area dialog box is displayed. 将显示“项目区域”对话框。 msdn2.microsoft.com 3. After you create the project area, it will show work items related to setting up your project area, based on the chosen process template. 在您创建项目区域之后,它会显示相关的工作项以,基于选中的过程模板创建项目区域。 www.ibm.com 4. Bird density in shrublands on the Project Area is also very low by. 以香港的标准而言,工程项目区内的灌木丛的鸟类密度亦很低。 www.epd.gov.hk 5. Now you have a project area and a few sample work items. 现在您就可以看到一个项目区域与一些范例的工作项。 www.ibm.com 6. A Project Area is where you will manage all of the work related to the project. 一个ProjectArea就是您将管理所有与这个项目相关工作的位置。 www.ibm.com 7. No team areas exist in the project area yet. 在项目区域中尚未存在什么团队区域。 www.ibm.com 8. In the Project Area, there is also a section for adding attachments. 在ProjectArea中,添加附件还有一个部分。 www.ibm.com 9. It is necessary that the server (Jetty, for example) is already running and that the project area has already been created. 这需要服务器(例如,Jetty)已经处于运行状态,而且项目区域已经创建完毕。 www.ibm.com 10. press the New toolbar button to open the New wizard or follow the link "Create a sample Jazz project area" on the Welcome page. 单击New工具栏按钮以打开New向导,或者单击欢迎页上的链接“CreateasampleJazzprojectarea”。 www.ibm.com 1. An information portal, like the developerWorks Open source project area shown in Figure 1 信息门户,例如图1所示的developerWorks开放源码项目区 www.ibm.com 2. Monitoring and analysis for soil erosion on Loess Hilly regions using GIS and RS--A case study of loess plateau Jingning project area 基于遥感和GIS的黄土丘陵区土壤侵蚀变化监测分析--以静宁县水保世行贷款二期项目区为例 www.ilib.cn 3. Distribution of Discarded Coal Mines in Zipingpu Hydroelectric Project Area and Its Effects on Project Construction 紫坪铺工程枢纽区废旧煤洞的分布及对工程建设的影响 service.ilib.cn 4. Application of BP network to groundwater quality evaluation--Case study of Hotan sub-project area Xinjiang 基于改进BP神经网络的地下水水质评价--以新疆和田地区为例 scholar.ilib.cn 5. Practice on Supervision in Building Wulanchabu Project Area of Soil and Water Conservation Ecological Project of the Yellow River 黄河水保生态工程乌兰察布市项目区建设的监理实践 www.ilib.cn 6. Investigation and Consideration of Agricultural Comprehensive Development Project Area in Hengnan 衡南县农业综合开发项目区调查与思考 www.ilib.cn 7. Experience on Afforestation of Wulanchabu Project Area of Soil and Water Conservation Ecological Project of the Yellow River 黄河水保生态工程乌兰察布市项目区造林经验 www.ilib.cn 8. Whether the living conditions of the residents in the proposed project area are satisfactory; 建议重建项目范围内居民的居住情况是否令人满意; www.hplb.gov.hk 9. Experience on Warping Dam Building in Wulanchabu Project Area of Soil and Water Conservation Ecological Project of the Yellow River 黄河水保生态工程乌兰察布市项目区淤地坝建设经验 www.ilib.cn 10. Studies of ecological engineering monitoring and evaluation information management system in Jingning project area 静宁县生态工程监测评价管理信息系统建设研究 jhe.ches.org.cn 1. I was responsible for the technicing (scheduling. . . inspection. . . quantity control) work of this project. ( area) 我卖力这个项目(区域)的技术(技术、查抄、质量控制)办事。 www.65911.info 2. Whether the proposed project area is old and dilapidated and requires urgent redevelopment; 建议重建项目范围是否残破失修,急须重建; www.hplb.gov.hk 3. Thinking on Following up Industry Development in Project Area of Forest Rehabilitation from Slope Agriculture of Yuxi 玉溪市退耕还林项目区后续产业开发的思考 www.ilib.cn 4. Construction of Project Area of Control Engineering of Wind and Sand Resources of Beijing and Tianjin in South Suburb of Datong City 论京津风沙源治理工程大同南郊项目区建设 www.ilib.cn 5. Technical experience in the fluid power industry, mobile machinery OEM, or relevant project area is desirable; 具备流体动力行业、路面机械行业或相关项目领域的技术经验优先; bbs2.ustc.edu.cn 6. Microstructure of Granite in Three Gorges Project Area and Dislocation Characteristic of Quartz 三峡工程坝区花岗岩微结构和石英位错特征 www.ilib.cn 7. A study on Agroforestry on Sloping Cultivated Land in Changjiang River Conservation Forest Project Area in Anhui 安徽长江防护林工程区坡耕地混农造林研究 www.ilib.cn 8. Application of GIS in Xianyang project area of Loess Plateau Watershed Rehabilitation Project 浅谈GIS在咸阳世行贷款项目管理中的应用 jhe.ches.org.cn 9. The population characteristics of the proposed project area; 建议项目范围的人口特点; www.hplb.gov.hk 10. Ensure smooth and safe operation of the service station network for whole project area; 确保所辖区域内加油站安全健康环保政策得以正确实施; bj.jobems.com 1. Analysis on ecological situation and green agricultural development in Hongsibao project area 浅谈红寺堡项目区生态环境与绿色农业发展 scholar.ilib.cn 2. Training & supervise service station staff in whole project area; 培训并监督所辖区域内加油站站长及员工工作; bj.jobems.com 3. Filter project area is divided into two layers. The top lay is backfill soil, which is loose and mainly in limestone; 工程区的滤层分为两层,上层为回填卵石土,结构松散,以灰岩为主; paper.pet2008.cn 4. Coda Attenuation in the Lancang River Valley Hydropower Project Area 澜沧江流域水电工程地区的尾波衰减 www.ilib.cn 5. Project Area: Select the appropriate project from the dropdown 项目区域:从下拉菜单中选择合适的项目 www.ibm.com 6. Home Affairs Ministry issues news release on riots in copper mine project area 联邦内政部发布莱比塘铜矿项目区域发生骚乱新闻公报 blog.sina.com.cn 7. Returning the Grain Plots to Grass Project Area of Sangequanzi of Shawan County Influence on the Area Ecology 沙湾县三个泉子退耕还草项目区对区域生态环境的影响 ilib.cn 8. Summary: Create project structures and share them in the PetStore project area 小结:创建项目构架,并使它们在PetStore项目区域共享 www.ibm.com 9. Epidemiological analysis of malaria in Nuozhadu Project area in Yunnan Province 云南糯扎渡工程疟疾流行病学分析 service.ilib.cn 10. The Changes of Landuse Degree in Three Gorges'Project Area Based on the Integrative Techniques of Remote Sensing and GIS 基于遥感和GIS一体化技术的三峡库区土地利用变化研究 www.ilib.cn 1. Achievements made in second Loess Plateau Watershed Rehabilitation Project in Kongdong district project area 崆峒区世行二期项目建设的成效与启示 www.ilib.cn 2. Stability Analysis of 1# Landslide in Jinghong Hydropower Project Area 景洪水电站1号滑坡稳定性分析 www.ilib.cn 3. Smear positive prevalence in projectarea and non-project area 项目与非项目地区涂阳患病率的变化 www.chinatb.org 4. Remote Sensing Studies on Active Faults in the Western South-North Water Transfer Project Area in China 南水北调西线工程区活动断裂构造遥感研究 www.ilib.cn 5. According to the type of project, area of land and use of land 根据项目类型、用地规模和土地用途,确定土地出让价格 www.china-taiwan.com |
||||||||||||||||
随便看 |
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。