单词 | actual start | ||||||
释义 | actual start
例句释义: 实际开始时间,实际开始日期,切实开始 1. At least, actual start date, actual finish date, percentage of completion, remaining duration, more than these 4 are required if necessary. 至少,实际起动日期,实际完成日期,完成百分比,剩余工期。如必需,更多输入。 www.p3china.com 2. You can track progress by comparing planned and actual start and finish dates, and by checking the completion percentage of each task. 可通过对计划的和实际的开始日期及完成日期进行比较以及通过检查每项任务的完成百分比来跟踪进度。 office.microsoft.com 3. Preparations, as well as its actual start on Sunday, received saturation media coverage in South Korea. 准备阶段以及周日开始的实际演练,得到韩国媒体连篇累牍的报导。 c.wsj.com 4. Our group was the fourth, and so would witness the examination of the defendants at the actual start of proceedings. 我们排在第四组,因此在实际诉讼程序开始阶段会见证对被告人的询问。 www.bing.com 5. If actual data was entered for the task, the actual start date is displayed, along with the data that initiated the task. 如果输入了任务的实际数据,则显示实际开始日期和启动任务的数据。 office.microsoft.com 6. The systematic hydrostatic test (dry run , hot test, dynamic test, actual start-up ) is scheduled for next Monday. 系统水压试验(学习、加热试验、动力试验、实际开车)定于下星期一进行。 bbs.ebigear.com 7. Drag to add a text box containing task name, scheduled start, scheduled finish, actual start and actual finish. 拖动以添加包含任务名称、预定开始时间、预定完成时间、实际开始时间和实际完成时间的文本框。 www.dictall.com 8. If the task is 100% complete, the upper bar shows the actual start and finish dates. 如果任务100%完成,则靠上的条形图显示实际的开始日期和完成日期。 office.microsoft.com 9. You enter actual information in fields such as Actual Work, Actual Duration, Actual Start, Actual Finish, and Actual Cost. 您可以在实际工时、实际工期、实际开始日期、实际完成日期以及实际成本等域中输入实际信息。 office.microsoft.com 10. For example, if you enter the Actual Finish date, the Actual Duration, Actual Start, and other fields can be calculated. 例如,如果输入了实际完成日期、实际工期、实际开始日期,则可以计算出其他域。 office.microsoft.com 1. enter actual start and finish dates for a task 输入任务的实际开始日期和完成日期 www.ichacha.net |
||||||
随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。