单词 | main cable |
释义 |
例句释义: 载重索,主索,干线电缆,主干电缆,主缆,主电缆,电线长度 1. Linear fitting of three dimension surveying data of main-cable is completely consistent with the verified result of theory project. 采用此方法在某大桥大跨度悬索桥主缆进行三维线形监测,其监测结果与理论线形吻合良好。 www.ceps.com.tw 2. Main cable is one of the important components of suspension bridge, its shape has a critical influence on the bridge. 悬索桥主缆是悬索桥主要的构件之一,它的线形对全桥有着至关重要的影响。 www.fabiao.net 3. And the main cable's longitudinal section temperature effect is analyzed under longitudinal temperature field and vertical temperature. 讨论存在纵向温差或竖向温差的温度场作用下主缆的纵向温度效应。 www.fabiao.net 4. In data communications, a network topology in which workstations are connected by T junctions to one main cable. 数据通信技术中的一种网络拓扑结构,其中各个工作站通过T型接头与主电缆相连。 www.hotdic.com 5. Part of the inventory of equipment, materials, the number of statistics have not yet complete, referring to the main cable length. 清册中的部分设备、材料数量统计尚未完全,主指电缆长度。 tech.plantsoft.com 6. The suspension bridge consists of the following parts: bridge tower, main cable, hanger rod, stiffened girder and anchor bank. 悬索桥的结构部分可大致分为桥塔、主缆、吊杆、加劲梁、锚碇等。 www.lw23.com 7. In this article, authors introduce connection joint types between main cable and secondary cable in cable net structure. 力密度法和支座提升法是索网等张拉结构找形的两种基本方法。 www.dictall.com 8. Inspection main cable installation for wheel house before paneling decoration. 敷板前驾驶室检查主干电缆安装。 www.cnss.com.cn 9. The technology, method and key points in erection of main cable, clamp and suspension cable are introduced. 以黄山观光索桥为例,重点介绍人行观光悬索桥主缆、索夹、吊索安装施工工艺、方法和要点。 www.dictall.com 10. The shape and dimension of main cable and wind cable will change with the position and distribution of loads. 主索和抗风索的形状和尺寸将随荷载的大小、位置和分布规律等的不同而改变。 www.ceps.com.tw 1. The main cable trunk adopts the way of laying, while the branch cables can adopt the two manners of direct burial or pipe trench laying. 主电缆管采用敷设形式,分支电缆可采用直埋或管沟敷设两种形式。 www.waiwenfanyi.com 2. According to main cable configuration, the finite model is formed and then hanger force is conformed using the finite element program. 确定了主缆线形后,就可以建立有限元模型,计算得到成桥索力。 www.lw23.com 3. The correction of unstressed length for main cable in saddles and calculation method of tangential point are considered at the same time. 同时考虑了主缆在索鞍处的无应力索长的修正以及切点计算方法; www.showxiu.com 4. There are 27, 572 wires used in one main cable on the Golden Gate Bridge in San Francisco. The bridge has two main cables. 旧金山的金门大桥一共有两根主吊索,每根主吊索上使用了27572条金属丝。 www.bing.com 5. Reinforcement Construction and of Blanking Length Determination of Main Cable of Large Scale Suspension Cable Crossing Project 大型悬索跨越主索加固施工及主索下料长度的确定 www.ilib.cn 6. Study of Reasonable Control Values of Wire Strand Tension of Suspension Bridge Main Cable at Anchor Span under High Temperatures 高温下悬索桥主缆丝股锚跨张力的合理控制值研究 service.ilib.cn 7. Influence on the Performance of the Completion Structure by the Initial Tension of the Main Cable of the Suspension Bridge 悬索桥主缆初张力对成桥结构性能的影响 www.ilib.cn 8. Static Analytical Solution of the Main Cable Curve of a Suspension Bridge 悬索桥主缆线形静力解析解 www.ilib.cn 9. Computing and Laying Out the Location of the Main Cable Clamp for the Suspension Bridge 悬索桥主缆索夹位置计算及放样 www.ilib.cn 10. Differential positioning method for the main cable of Yichang Changjiang River Bridge 宜昌长江公路大桥主缆架设差分定位 www.ilib.cn 1. Positioning and Monitoring for the Main Cable of the Suspended-cable Bridge 悬索桥主缆差分定位及监测 service.ilib.cn 2. Three-dimensional Space Bending of Double-Box Girder Subsection of Main Cable-stayed Bridge for Changjiang River Bridge Shanghai 上海长江大桥主桥斜拉桥双箱梁节段的三维空间屈曲 www.ilib.cn 3. Design of Main Cable Dehumidification System in Southern Suspension Bridge of Runyang Yangtze River Highway Bridge 润扬大桥南汊悬索桥主缆除湿系统设计 www.ilib.cn 4. Anti-corrosion, Protection and Coating of the Main Cable of Suspension Bridge 悬索桥主缆的防腐防护及涂装 service.ilib.cn 5. The Assembling and Welding of the Main Cable Saddle on the Suspension Bridge of the Highway 公路悬索桥主索鞍座的装配与焊接工艺探讨 www.ilib.cn 6. Analysis of Main Cable in Anchorage by Stream Cable of Floating Bridge Considering Horizontal Displacement 考虑浮桥横向变形的横张纲锚定主索计算分析 service.ilib.cn 7. The Construction Technology of Main Cable-Stayed Navigation-Hole Section of the East Sea Bridge 东海大桥主通航孔斜拉桥施工技术 service.ilib.cn 8. Secondary Stress Analysis of the Main Cable of Suspension Bridges 悬索桥主缆的次应力分析 www.ilib.cn 9. Calculation Methods for Main Cable Saddles of Spatial Cable Plane Self-Anchored Suspension Bridge 空间索面自锚式悬索桥主索鞍计算方法 www.ilib.cn 10. Construction Surveying and Monitoring for Main Cable of Yichang Changjiang River Bridge 宜昌长江公路大桥主缆施工控制测量及营运监测 www.ilib.cn 1. Parameter equation methods for determination of main cable's profile of suspension bridges 确定悬索桥主缆成桥线形的参数方程法 scholar.ilib.cn 2. An Analytical Method for Main Cable Configuration of Self-anchored Suspension Bridges 一种自锚式悬索桥主缆线形的解析法 168.160.184.78 3. Accurate Nonlinear Analysis of Tower and Cable in Construction of Main Cable for Suspension Bridge 悬索桥索股架设全过程的非线性精确分析 www.ilib.cn 4. Fictitious beam method for determination of main cable shape of long-span suspension bridges 确定大跨径悬索桥主缆成桥线形的虚拟梁法 www.ilib.cn 5. Construction Technology for Protection of Wire Rope-Main Cable of Suspension Bridge 悬索桥钢丝绳主缆防护施工工艺 www.ilib.cn 6. A Study on Slip Resistance Between Main Cable and Saddle on Middle Tower of Three-Tower Suspension Bridge 三塔悬索桥中塔主缆与鞍座间抗滑移试验研究 www.ilib.cn 7. A Construction Technique of Main Cable Hanger for Self-Anchorage Suspension Bridge 自锚式悬索桥主缆、吊杆施工技术 www.ilib.cn 8. Main Cable Construction of Yichang Changjiang Highway Bridge 宜昌长江公路大桥主缆施工探讨 ilib.cn 9. Construction Technology of Main Cable and Suspender of Guilin Lijun Bridge 桂林丽君桥主缆、吊杆施工技术 www.ilib.cn 10. Analysis of finished main cable shape of self-anchored suspension bridges 自锚式悬索桥主缆成桥线形分析 www.ilib.cn 1. Analytical solution of installing curve of suspended bridge's main cable 悬索桥主缆安装曲线的解析解 www.ilib.cn 2. Line Shape Measurement for Main Cable of Large Span Suspension Cable Bridge 大跨径悬索桥主缆线形测量 ilib.cn 3. Construct-control and monitoring for main cable of suspended-cable 悬索桥主缆施工控制与监测 www.ilib.cn 4. Accurate Analysis on Bridging Shape of Main Cable in Suspension Bridge 悬索桥主缆成桥线形精确分析 www.ilib.cn 5. Reshaping on the gound for the Main Cable Strand 主缆索股在地面上进行整形 wenku.baidu.com 6. Main Cable Safety Factors Assessment of Long-span Suspension Bridges Based on Inverse Reliability Method 基于逆可靠度法的大跨悬索桥主缆安全系数评估 www.ilib.cn 7. Welding of Main Cable Wrapping at Long Span Suspension Bridge 大跨度悬索桥主缆缠丝焊接 www.ilib.cn 8. Overview on measuring method of forces in main cable of cable-stayed bridge 斜拉桥斜拉索索力测试方法综述 www.ilib.cn 9. Design and Calculation of Main Cable of Fumin Bridge in Tianjin City 天津富民桥主缆设计与计算 service.ilib.cn 10. Renovation of Main Cable Strands of Humen Large Bridge 虎门大桥主缆索股翻新 www.ilib.cn 1. Calculation Method of Main Cable System for Suspension Bridge Based on Zero Saddle Pre-bias 无索鞍预偏施工悬索桥的主缆施工控制计算 service.ilib.cn 2. Layout of instrument main cable 仪表主电缆布置图 www.5f5y.com 3. Erecton of the Main Cable Strand 主缆索股架设 wenku.baidu.com |
随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。