| 单词 | cost schedule |
| 释义 | cost schedule例句释义: 全部 1. Cost, schedule and quality are three important objectives of construction project and on the objective of environment have not been focused. 人们通常比较重视工程项目的投资、进度与质量目标,建设活动对环境影响往往被忽视。 www.chemyq.com 2. The new market situation brings forward a higher demand for the cost, schedule and control of the construction project. 在新的市场形势下,对工程项目建设的出成本、进度、控制提出了更高的要求。 www.fabiao.net 3. d. Procedures used to conduct trade-off analyses among cost, schedule, and quality. 组织机构,职责,程序,流程,和进行项目质量管理所必需的资源。 www.91gupiao.com 4. Support Project Manager in project organization and management of cost, schedule, documentation, quality, safety, etc. 提供项目组织和治理,包括用度结算、项目控制、文件治理和质量安全控制等。 www.job956.com 5. "That included China's bottom-line iron ore price and every steelmaker's inventory, production cost, schedule and manufacturing details. " “备忘录里有中方铁矿石价格底线以及每家钢铁制造商的存货、生产成本、计划以及制造工艺细节。” www.bing.com 6. Create the work breakdown structure with the team to develop the cost, schedule, resource, quality and procurement plans. 和团队一起建立工作分解结构,并开发成本、进度、资源、质量和采购计划。 www.harbourlink.com 7. To design new product taking into account cost, schedule, technical specifications and safety requirements. 设计并开发新品并使之满足成本,时间,产品规格和安全要求。 www.job592.com 8. Timely provide necessary inerrorformation to cost, schedule and quality control, engineering and construction team. 及时向成本、进度和质量控制、设计和施工团队提供所需的资料。 www.gao8dou.com 9. Get comfortable dealing with managers in issues of expectations, cost, schedule, and resources. 知悉如何与其他主管处理期许、成本、进度与资源等议题。 adidasman.spaces.live.com 10. Good control at project quality, cost, schedule, ets. , have strong communication skill both on witten and oral. 对工程质量、成本、进度等有良好的控制能力,具有较强的书面及口头表达能力; www.abbs.com.cn 1. Work together with the cost &schedule control engineer to ensure the project is delivered on schedule. 与成本和进度控制工程师协同合作,以确保项目如期交付。 www.jobui.com 2. Effectively control the delivery scope, cost, schedule and quality. 对供货范围、成本、进度、质量等进行有效控制。 www.8aza.com 3. I personally like doing a pointed weekly status which focuses on cost, schedule, risks and issues. 我喜欢每周通报项目状态,包括成本,计划,风险和问题。 www.bing.com 4. Projects may have a wide variety of business, cost, schedule, technical, and quality objectives. 项目可能有各种各样的运营方式、费用、进度、技术和质量目标。 www.educity.cn 5. Traditional project management is about the mode of single project management related to scale, cost, schedule, quality and etc. 传统项目管理是关于如何管理项目范围、成本、进度、质量等的单一项目管理模式。 www.fabiao.net 6. manage all aspects of an epc contract, including cost schedule, quality and safety. 管理所有epc合同的事务,包括成本计划、质量和安全。 www.vipcareer.com 7. Select a project matrix that can measure the project cost, schedule, quality and performance accurately . 选择一个能够精确衡量项目成本、进度、质量、绩效的项目距阵。 job.01hr.com 8. Here, to cost, schedule, accurate risk assessment. 在这里,要对成本、进度、风险进行准确评估。 wenku.baidu.com 9. Most Agile teams vary the scope and keep a tab on Cost, Schedule and Quality. 很多敏捷团队会变更范围,并监控成本、日程和质量。 www.infoq.com 10. Another factor that might affect the construction cost schedule is that the local climate of Chongqing. 另外的一个可能影响工程费用时间表的因素是那重庆的当地气候。 ks.cn.yahoo.com 1. a. Does not include project objectives such as cost, schedule, or quality measures. 并不包括项目目标,如项目成本,进度计划和质量监测等内容。 www.91gupiao.com 2. Project management: Cost, schedule, risk, staffing, and so forth. 项目管理:成本、时间表、风险、人员分配等等。 www.ibm.com 3. Resource Consumption: Cost and Time, Progress Monitoring: Perceived vs. Real, Cost Schedule Status Reporting (CSSR), "Earned Value" ( PDF) 资源消耗:成本和时间,进度监控:认知与实际进度的对比,成本进度情况报告,「实获值」 www.myoops.org 4. Procedures used to conduct trade-off analyses among cost, schedule, and quality 对成本、进度和质量进行权衡分析所依据的程序 www.cnpmi.com 5. Providing best-in-class estimation capability (cost, schedule, effort, risk, and reliability) 提供最高等级的评估能力(开销、进度、努力、风险以及可靠性); www.ibm.com 6. Management information system for cost-schedule integration control for nuclear power projects 核电工程投资与进度集成控制管理信息系统 www.ilib.cn 7. Program analyzing cost, schedule, and quality balance 进行成本,进度和质量平衡分析的程序 wenku.baidu.com 8. Project change impact to cost, schedule, quality and resource usage 项目变更对费用、进度、质量及资源使用的影响 www.wiseman.com.cn 9. Manage cost, schedule, and quality with the same level of importance and attention 以同等重要性和关注程度管理成本、进度计划和质量 www.cnpmi.com 10. Study on System Dynamics Control in Cost-Schedule 成本-进度系统动态控制的研究 www.ilib.cn |
| 随便看 |
|
英汉双解词典包含2704715条英汉词条,基本涵盖了全部常用单词的翻译及用法,是英语学习的有利工具。