The development procedure of the muddy water system is introduced in the test study of the braided reach realignment engineering measure odf multi-sand river.
介绍了多沙河流游荡性河段整治工程措施试验研究课题中浑水系统的研制过程。
2
The Engineering & Technical Department is responsible to calibrate the test equipment according to the "Inspection, Measuring and Test Equipment Control Procedure".