In production, the main difficulty is the manufacture of the evaporator spiral wall especially it's transition section.
此锅炉制造中最大的难点在于螺旋水冷壁,特别是其中过渡段的制造。
2
At the instant when heat pipe begins running, the evaporator and adiabatic section temperature have an unchanged region, while condenser temperature increases greatly.