Some water is lost through evaporation in the cooling tower and in waste discharge.
有些水在冷凝塔中蒸发掉了,有些则作为废水排放掉了。
2
The model input is the river discharge at Alar, and the output items include the discharges of some stations along the mainstream, and evaporation, seepage and overflow of each river section.
该模型以阿拉尔来水量为输入,输出包括干流主要水文站点的水量、各河段的蒸发量、渗漏量、漫溢量等。
3
To save water, 3 coolers are installed (the 2nd for ammonia evaporation), cooled waste water are led to recycling pool, thus a zero water discharge is achieved and water consumption decreased.