The results show that using the DRR scheduling algorithm can reduce endto end packet delay, meet real time request, increase network throughout, so this model is suitable for avionics network.
The purpose of the paper provides the guide for system design, the basis for system scheduling and the guarantee for task execution by predicting end-to-end response time of real-time tasks.