After cableduct construction, the Permit Holder shall reinstate the affected stream bed of Ho Chung River to its original conditions using natural substratum.
在电缆管道建成后,许可证持有人须用天然底土修复受影响的蚝涌溪流河床,使其回复原貌。
2
This creates additional advantages: cableduct systems can be integrated and heat sources can be contacted directly with the machine bed, in order to render active climate control unnecessary.
The work of reducing noise is a system engineering which includes scientific layout machine room of ADVANTX system, interconnection cables, making cableduct and earthling assembly, and so on.