A two stage emergencyload shedding algorithm was developed to ensure safe control along with economic operation.
为确保校正控制的安全性同时兼顾经济性,提出一种新的紧急切负荷算法。
2
The time history of water hammer in pipeline in the condition of unit emergencyload dump is calculated by characteristic line method.
在水电站机组丢弃负荷情况下,利用特征线法计算管道内的水击荷载时间历程。
3
A novel emergencyload shedding algorithm is presented to assure security of correct control taking account its economy, which is consisted of two stages.